TY - JOUR A1 - Vogt, Christian A1 - Iwanowski-Strahser, Katha A1 - Marquart, Gabriele A1 - Arnold, Juliane A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Gnjezda, Daniel A1 - Clauser, Christoph T1 - Modeling contribution to risk assessment of thermal production power for geothermal reservoirs JF - Renewable Energy Y1 - 2013 U6 - http://dx.doi.org/10.1016/j.renene.2012.11.026 SN - 0960-1481 VL - 53 SP - 230 EP - 241 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Vogt, Christian T1 - The geothermal project Den Haag: 3D numerical models for temperature prediction and reservoir simulation JF - Geothermics N2 - The proposed Den Haag Zuidwest district heating system of the city of The Hague consists of a deep doublet in a Jurassic sandstone layer that is designed for a production temperature of 75 °C and a reinjection temperature of 40 °C at a flow rate of 150 m3 h−1. The prediction of reservoir temperature and production behavior is crucial for success of the proposed geothermal doublet. This work presents the results of a study of the important geothermal and geohydrological issues for the doublet design. In the first phase of the study, the influences of the three-dimensional (3D) structures of anticlines and synclines on the temperature field were examined. A comprehensive petrophysical investigation was performed to build a large scale 3D-model of the reservoir. Several bottomhole temperatures (BHTs), as well as petrophysical logs were used to calibrate the model using thermal conductivity measurements on 50 samples from boreholes in different lithological units in the study area. Profiles and cross sections extracted from the calculated temperature field were used to study the temperature in the surrounding areas of the planned doublet. In the second phase of the project, a detailed 3D numerical reservoir model was set up, with the aim of predicting the evolution of the producer and injector temperatures, and the extent of the cooled area around the injector. The temperature model from the first phase provided the boundary conditions for the reservoir model. Hydraulic parameters for the target horizons, such as porosity and permeability, were taken from data available from the nearby exploration wells. The simulation results are encouraging as no significant thermal breakthrough is predicted. For the originally planned location of the producer, the extracted water temperature is predicted to be around 79 °C, with an almost negligible cooling in the first 50 years of production. When the producer is located shallower parts of the reservoir, the yield water temperatures is lower, starting at ≈76 °C and decreasing to ≈74 °C after 50 years of operation. This comparatively larger decrease in temperature with time is caused by the structural feature of the reservoir, namely a higher dip causes the cooler water to easily move downward. In view of the poor reservoir data, the reservoir simulation model is constructed to allow iterative updates using data assimilation during planned drilling, testing, and production phases. Measurements during an 8 h pumping test carried out in late 2010 suggest that a flow rate of 150 m3 h−1 is achievable. Fluid temperatures of 76.5 °C were measured, which is very close to the predicted value. Y1 - 2011 U6 - http://dx.doi.org/10.1016/j.geothermics.2011.07.001 SN - 0375-6505 VL - 40 IS - 3 SP - 199 EP - 210 PB - Elsevier CY - Amsterdam ER -