TY - CHAP A1 - Darveniza, M. A1 - Flisowski, Z. A1 - Kern, Alexander A1 - Landers, E.-U. A1 - LoPiparo, G. A1 - Mazzetti, C. A1 - Rousseau, A. A1 - Sherlock, J. T1 - Application problems of the probabilistic approach to the assessment of risk for structures and services N2 - The paper deals with the development of the probabilistic approach to the assessment of risk due to lightning. Sources of damage, types of damage and types of loss are defined and, accordingly, the procedure for risk analysis and the way of assessment of different risk components is proposed. The way to evaluate the influence of different protection measures (lightning protection system; shielding of structure, cables and equipment; routing of internal wiring; surge protective device) in reducing such probabilities is considered. The paper has been prepared within the framework of the activity of IEC TC81-WG9/CLC TC81-WG4 directed to prepare the draft IEC 62305-2 Risk Management, in cooperation with the Secretary of IEC/CLC TC81. KW - Blitzschutz KW - Risikoabwägung KW - Lightning protection system KW - risk assessment KW - protection measures Y1 - 2002 ER - TY - CHAP A1 - Surtees, A. J. A1 - Gillespie, A. A1 - Kern, Alexander A1 - Rousseau, A. T1 - DEVELOPMENT OF A RISK ASSESSMENT CALCULATOR BASED ON A SIMPLIFIED FORM OF THE IEC 62305-2 STANDARD ON LIGHTNING PROTECTION N2 - Neue Blitzschutznorm IEC 62305. Entwicklung einer einfachen Software zur Risikoabwägung N2 - IEC Technical Committee 81 is currently creating the new IEC 62305 series of standards on Lightning Protection. Working Group 9 is responsible for Part 2 of this series, which deals with the assessment and management of risk its CDV (Committee Draft for Voting) stage and has been circulated to National Committees for comment. The paper details the development of the Simplified IEC Risk Assessment Calculator software tool as described in Informative Annex J of IEC62305-2 Ed.1/CDV 2. This tool is intended as a simplified implementation of the more rigorous treatment of risk management found in the written document. It is designed to be relatively intuitive for users who wish to obtain an initial assessment of risk sensitivity, but should not be considered a substitute to a full understanding of the methods provided in the standard when dealing with more complicated structures or those where greater risks to personal or system operation are involved. KW - Risiko KW - Risikoabwägung KW - Blitzrisiko KW - Blitzschutz KW - Risk KW - Risk Management KW - Risk Assessment KW - Lightning Risk KW - Lightning Protection Y1 - 2004 ER -