@article{KernLanders2002, author = {Kern, Alexander and Landers, E.-U.}, title = {Die neuen Blitzschutz-Vornormen der Reihe VDE-V 0185:2002}, year = {2002}, language = {de} } @article{KernLanders2006, author = {Kern, Alexander and Landers, E.-U.}, title = {Die k{\"u}nftige deutsche Blitzschutznormung (2/3) - Reihe DIN EN 62305:2006 - Teil 2: Risikomanagement}, series = {De : der Elektro- und Geb{\"a}udetechniker / Ausgabe ZV. 81 (2006), H. 18 - 19}, journal = {De : der Elektro- und Geb{\"a}udetechniker / Ausgabe ZV. 81 (2006), H. 18 - 19}, isbn = {1617-1160}, year = {2006}, language = {de} } @inproceedings{KernKraemer2003, author = {Kern, Alexander and Kr{\"a}mer, Heinz-Josef}, title = {Blitzschutzkonzept f{\"u}r eine bauliche Anlage mit Stahlkonstruktion und metallenen W{\"a}nden}, year = {2003}, abstract = {Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen W{\"a}nden sind bereits in sehr großer Zahl errichtet. Dazu geh{\"o}ren kleinere bis gr{\"o}ßere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilit{\"a}t, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abh{\"a}ngig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen m{\"u}ssen. Der Blitzschutz f{\"u}r diese baulichen Anlagen sollte sich also nicht nur im „klassischen" Geb{\"a}ude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] ersch{\"o}pfen; ein Erg{\"a}nzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großfl{\"a}chigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugeh{\"o}rigen blitzschutz-technischen Maßnahmen k{\"o}nnen drei Hauptbereichen zugeordnet werden: - {\"A}ußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgef{\"u}hrten Anlage mit Fotos beispielhaft dokumentiert.}, language = {de} } @article{KernKrichelNeskakisetal.2001, author = {Kern, Alexander and Krichel, Frank and Neskakis, Apostolos and M{\"u}ller, Klaus-Peter (u.a.)}, title = {Lightning protection design of a renewable energy hybrid-system without power mains connection}, year = {2001}, language = {en} } @inproceedings{KernKrichelMueller2001, author = {Kern, Alexander and Krichel, Frank and M{\"u}ller, Klaus-Peter}, title = {Lightning protection design of a renewable energy hybrid-system without power mains connection}, year = {2001}, abstract = {In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50\% of the costs are due to protection measures against direct strikes, 50\% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.}, language = {en} } @article{KernKrichel2004, author = {Kern, Alexander and Krichel, Frank}, title = {Considerations about the lightning protection system of mains independent renewable energy hybrid-systems - practical experiences}, series = {Journal of electrostatics. 60 (2004), H. 2-4}, journal = {Journal of electrostatics. 60 (2004), H. 2-4}, isbn = {0304-3886}, pages = {257 -- 263}, year = {2004}, language = {en} } @article{KernKrichel2003, author = {Kern, Alexander and Krichel, Frank}, title = {{\"U}berlegungen zum Blitzschutzkonzept f{\"u}r regenerative Energieanlagen}, year = {2003}, abstract = {Dem Blitzschutz von Anlagen der regenerativen Energien kommt in Zukunft eine steigende Bedeutung zu. Dabei ist es notwendig zu ber{\"u}cksichtigen, dass die Schutzmaßnahmen technisch/wirtschaftlich ausgewogen sind. Erbauer, Besitzer oder Benutzer von netzautarken Hybridanlagen haben zu entscheiden, ob die Anlage einen Schutz braucht oder nicht. Um diese Entscheidung zu f{\"a}llen, ist eine Risikoanalyse als erster Schritt sinnvoll. Diese muss dabei die f{\"u}r die Hybridanlage relevanten Schadenarten und spezifischen Parameter, Werte und Randbedingungen mit einbeziehen. Dazu ist die Hilfe eines Blitzschutzexperten sehr hilfreich.}, subject = {Alternative Energiequelle}, language = {de} } @inproceedings{KernKrichel2002, author = {Kern, Alexander and Krichel, Frank}, title = {Considerations about the lightning protection system of mains independent renewable energy hybrid-systems - practical experiences}, year = {2002}, abstract = {In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50\% of the costs are due to protection measures against direct strikes, 50\% are due to overvoltage protection.}, language = {en} } @article{KernKloetersPferdmenges2009, author = {Kern, Alexander and Kl{\"o}ters, Georg and Pferdmenges, J{\"o}rg}, title = {Blitzschutzoptimierung in der LST an nicht-elektrifizierten Strecken}, series = {Signal und Draht. 101 (2009), H. 4}, journal = {Signal und Draht. 101 (2009), H. 4}, publisher = {DVV Media Group}, address = {Hamburg}, isbn = {0037-4997}, pages = {17 -- 21}, year = {2009}, language = {de} } @article{KernKloetersPferdemenges2010, author = {Kern, Alexander and Kl{\"o}ters, Georg and Pferdemenges, J{\"o}rg}, title = {Optimised protection against lightning for the signalling and safety systems of level crossings on non-electrified railway lines}, series = {RTR : European Rail Technology Review}, volume = {50}, journal = {RTR : European Rail Technology Review}, number = {2}, isbn = {0079-9548}, year = {2010}, language = {en} }