@inproceedings{BungValero2015, author = {Bung, Daniel Bernhard and Valero, Daniel}, title = {Image processing for bubble image velocimetry in self-aerated flows}, series = {E-proceedings of the 36th IAHR World Congress 28 June - 3 July, 2015, The Hague, the Netherlands}, booktitle = {E-proceedings of the 36th IAHR World Congress 28 June - 3 July, 2015, The Hague, the Netherlands}, organization = {IAHR World Congress <36, 2015, Den Haag>}, pages = {1 -- 8}, year = {2015}, language = {en} } @incollection{Ulke2024, author = {Ulke, Bernd}, title = {{\"O}ffentliches Baurecht, Ausschreibung und Vergabe}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, editor = {Krause, Thomas and Ulke, Bernd and Ferger, Martin}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-41329-3 (Print)}, doi = {10.1007/978-3-658-41330-9_5}, pages = {263 -- 297}, year = {2024}, abstract = {Durch das {\"o}ffentliche Baurecht werden die Zul{\"a}ssigkeit, die Grenzen, die Ordnung und die F{\"o}rderung der baulichen Nutzung des Bodens geregelt. Die Ausschreibung und die Vergabe sind von essenzieller Bedeutung f{\"u}r ein Bauvorhaben und werden deshalb in der HOAI mit zwei Leistungsphasen abgebildet: n{\"a}mlich mit der Leistungsphase 6 Vorbereitung der Vergabe sowie der Leistungsphase 7 Mitwirkung bei der Vergabe. Im Zuge der Ausschreibung und der Vergabe werden die f{\"u}r den AG anfallenden Kosten festgelegt und bilden somit die letzte gr{\"o}ßere Stellschraube f{\"u}r Preiseinsparungen.}, language = {de} } @article{Krause2006, author = {Krause, Thomas}, title = {Bauabrechnung und Mengenermittlung}, series = {Beispiele f{\"u}r die Baubetriebspraxis / Hoffmann, Manfred ; Kuhlmann, Willy [Hrsg.].}, journal = {Beispiele f{\"u}r die Baubetriebspraxis / Hoffmann, Manfred ; Kuhlmann, Willy [Hrsg.].}, publisher = {Teubner}, address = {Wiesbaden}, isbn = {978-3-8351-0002-2}, pages = {49 -- 62}, year = {2006}, language = {de} } @incollection{KrauseOettel2016, author = {Krause, Thomas and Oettel, Britta}, title = {Baumaschinen}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, edition = {9., {\"u}berarb. und aktual. Aufl.}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-02838-1 (Online)}, doi = {10.1007/978-3-658-02838-1_9}, pages = {1069 -- 1163}, year = {2016}, abstract = {Die Leistungsermittlung und Bemessung von Baumaschinen f{\"u}r die folgenden Bereiche werden bearbeitet: Maschinen f{\"u}r den Betonbau, Hebezeuge, Maschinen f{\"u}r den Erdbau, Straßenbaumaschinen, R{\"u}ckbauger{\"a}te und Elemente der Baustelleneinrichtung}, language = {de} } @incollection{MartinMartin2016, author = {Martin, Joachim and Martin, Angelika}, title = {Gr{\"o}ßen, Formeln, Bemessung}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, edition = {9., {\"u}berarb. und aktual. Aufl.}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-02838-1 (Online)}, doi = {10.1007/978-3-658-02838-1_1}, pages = {1 -- 61}, year = {2016}, abstract = {Das Kapitel 1 vermittelt eine {\"U}bersicht f{\"u}r den schnellen Gebrauch von Gr{\"o}ßen, Einheiten und Zeichen. Es folgt die Darstellung wichtiger Grundlagen der Mathematik, Lastannahmen und einfacher statischer Systeme. Schließlich werden Hinweise zu charakteristischen Festigkeiten und Tragf{\"a}higkeitsnachweisen f{\"u}r Berechnungen im Mauerwerk, Holz- und Stahlbau sowie Stahlbetonbau gegeben. F{\"u}r eine weitere Vertiefung des Themas empfiehlt sich der Wendehorst Bautechnische Zahlentafel}, language = {de} } @incollection{Ulke2024, author = {Ulke, Bernd}, title = {Boden, Baugrube, Verbau}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, editor = {Krause, Thomas and Ulke, Bernd and Ferger, Martin}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-41329-3 (Print)}, doi = {10.1007/978-3-658-41330-9_9}, pages = {499 -- 658}, year = {2024}, abstract = {Die L{\"o}sung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchf{\"u}hrung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die f{\"u}r die Planung und Durchf{\"u}hrung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abh{\"a}ngigkeit der erforderlichen G{\"u}teklasse der Proben beschrieben und vorgestellt.}, language = {de} } @incollection{Ulke2024, author = {Ulke, Bernd}, title = {Kalkulation}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, editor = {Krause, Thomas and Ulke, Bernd and Ferger, Martin}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-41329-3 (Print)}, doi = {10.1007/978-3-658-41330-9_12}, pages = {801 -- 909}, year = {2024}, abstract = {Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle. Der Angebotspreis wird aufgeschl{\"u}sselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Gesch{\"a}ftskosten und einen Zuschlag f{\"u}r Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben f{\"u}r die Kostenkontrolle entwickelt.}, language = {de} } @incollection{Krause2024, author = {Krause, Thomas}, title = {Baumaschinen}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, editor = {Krause, Thomas and Ulke, Bernd and Ferger, Martin}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-41329-3 (Print)}, doi = {10.1007/978-3-658-41330-9_8}, pages = {399 -- 498}, year = {2024}, abstract = {Die Leistungsermittlung und Bemessung von Baumaschinen f{\"u}r die folgenden Bereiche werden bearbeitet: Maschinen f{\"u}r den Betonbau, Hebezeuge, Maschinen f{\"u}r den Erdbau, Straßenbaumaschinen, R{\"u}ckbauger{\"a}te und Elemente der Baustelleneinrichtung.}, language = {de} } @incollection{Lohse2009, author = {Lohse, Wolfram}, title = {Stahlbau}, series = {Wendehorst Beispiele aus der Baupraxis. - 3. Aufl.}, booktitle = {Wendehorst Beispiele aus der Baupraxis. - 3. Aufl.}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-8348-0684-0 ; 978-3-8348-9997-2}, doi = {10.1007/978-3-8348-9997-2_10}, pages = {235 -- 274}, year = {2009}, language = {de} } @incollection{Krause2019, author = {Krause, Thomas}, title = {Baumaschinen}, series = {{\"U}bungsaufgaben und Berechnungen f{\"u}r den Baubetrieb}, booktitle = {{\"U}bungsaufgaben und Berechnungen f{\"u}r den Baubetrieb}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-23127-9}, doi = {10.1007/978-3-658-23127-9_7}, pages = {155 -- 163}, year = {2019}, language = {de} } @article{Lohse2007, author = {Lohse, Wolfram}, title = {Stahlbau}, series = {Bautechnische Zahlentafeln / Wendehorst, Reinhard ; Wetzell, Otto W. [Hrsg.] 32., vollst. aktualisierte Aufl.}, journal = {Bautechnische Zahlentafeln / Wendehorst, Reinhard ; Wetzell, Otto W. [Hrsg.] 32., vollst. aktualisierte Aufl.}, publisher = {Teubner}, address = {Stuttgart}, isbn = {978-3-8351-0055-8}, pages = {607 -- 757}, year = {2007}, language = {de} } @phdthesis{Bung2009, author = {Bung, Daniel Bernhard}, title = {Zur selbstbel{\"u}fteten Gerinnestr{\"o}mung auf Kaskaden mit gem{\"a}ßigter Neigung. (Bericht / Fachbereich Bautechnik, Lehr- und Forschungsgebiet Wasserbau und Wasserwirtschaft, Bergische Universit{\"a}t Gesamthochschule Wuppertal ; Bd. 16)}, publisher = {Shaker}, address = {Aachen}, isbn = {978-3-8322-8382-7}, pages = {XXVI, 292 S.. : Ill., graph. Darst.}, year = {2009}, language = {de} } @book{KrauseUlke2016, author = {Krause, Thomas and Ulke, Bernd}, title = {Zahlentafeln f{\"u}r den Baubetrieb}, editor = {Krause, Thomas and Ulke, Bernd}, edition = {9., {\"u}berarb. und aktual. Aufl.}, publisher = {Springer Fachmedien}, address = {Wiesbaden}, isbn = {978-3-658-02838-1}, doi = {10.1007/978-3-658-02838-1}, pages = {XII, 1669 S. 490 Abb.}, year = {2016}, language = {de} } @inproceedings{Bung2014, author = {Bung, Daniel Bernhard}, title = {Observations on non-aerated flow and air entrainment on moderately sloped stepped spillways}, series = {7th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : 8. - 12. Sept. 2014, Hannover}, booktitle = {7th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : 8. - 12. Sept. 2014, Hannover}, organization = {Chinese-German Joint Symposium on Hydraulic and Ocean Engineering <7, 2014, Hannover>}, pages = {1 -- 8}, year = {2014}, language = {en} } @inproceedings{BungOertel2014, author = {Bung, Daniel Bernhard and Oertel, Mario}, title = {Manipulation of non-aerated cavity flow on a stepped spillway model}, series = {3rd European IAHR Congress : April 14 - 16, 2014, Porto}, booktitle = {3rd European IAHR Congress : April 14 - 16, 2014, Porto}, publisher = {Univ. of Porto}, address = {Porto}, organization = {International Association of Hydro-Environment Engineering and Research}, year = {2014}, language = {en} } @article{Lohse1989, author = {Lohse, Wolfram}, title = {Kippnachweise nach DIN 4114 und Entwurf DIN 18800 Teil 2 - ein Hinweis f{\"u}r die Praxis}, series = {Schweissen und Schneiden : Fachzeitschrift f{\"u}r Schweißen und verwandte Verfahren / Hrsg.: DVS - Deutscher Verband f{\"u}r Schweißen und Verwandte Verfahren e.V.. 41 (1989), H. 9}, journal = {Schweissen und Schneiden : Fachzeitschrift f{\"u}r Schweißen und verwandte Verfahren / Hrsg.: DVS - Deutscher Verband f{\"u}r Schweißen und Verwandte Verfahren e.V.. 41 (1989), H. 9}, isbn = {0036-7184}, pages = {459 -- 462}, year = {1989}, language = {de} } @book{LohseLaumannWolf2020, author = {Lohse, Wolfram and Laumann, J{\"o}rg and Wolf, Christian}, title = {Stahlbau 2}, edition = {21., vollst. akt. und {\"u}berarb. Aufl.}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-8348-2116-4}, doi = {10.1007/978-3-8348-2116-4}, year = {2020}, language = {de} } @inproceedings{MohanGrossMenzeletal.2021, author = {Mohan, Nijanthan and Groß, Rolf Fritz and Menzel, Karsten and Theis, Fabian}, title = {Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany - A Case Study}, series = {WIT Transactions on The Built Environment, Vol. 205}, booktitle = {WIT Transactions on The Built Environment, Vol. 205}, publisher = {WIT Press}, address = {Southampton}, issn = {1743-3509}, doi = {10.2495/BIM210101}, pages = {117 -- 126}, year = {2021}, abstract = {Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.}, language = {en} } @incollection{Streit2016, author = {Streit, Wilfried}, title = {Kalkulation}, series = {Zahlentafeln f{\"u}r den Baubetrieb}, booktitle = {Zahlentafeln f{\"u}r den Baubetrieb}, edition = {9., {\"u}berarb. und aktual. Aufl.}, publisher = {Springer Vieweg}, address = {Wiesbaden}, isbn = {978-3-658-02838-1 (Online)}, doi = {10.1007/978-3-658-02838-1_13}, pages = {1391 -- 1501}, year = {2016}, abstract = {Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle. Der Angebotspreis wird aufgeschl{\"u}sselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Gesch{\"a}ftskosten und einen Zuschlag f{\"u}r Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben f{\"u}r die Kostenkontrolle entwickelt.}, language = {de} } @article{CheenakulaPaulsenOttetal.2023, author = {Cheenakula, Dheeraja and Paulsen, Svea and Ott, Fabian and Gr{\"o}mping, Markus}, title = {Operational window of a deammonifying sludge for mainstream application in a municipal wastewater treatment plant}, series = {Water and Environment Journal}, volume = {38}, journal = {Water and Environment Journal}, number = {1}, publisher = {Wiley}, address = {Chichester}, issn = {1747-6593}, doi = {10.1111/wej.12898}, pages = {59 -- 70}, year = {2023}, abstract = {The present work aimed to study the mainstream feasibility of the deammonifying sludge of side stream of municipal wastewater treatment plant (MWWTP) in Kaster, Germany. For this purpose, the deammonifying sludge available at the side stream was investigated for nitrogen (N) removal with respect to the operational factors temperature (15-30°C), pH value (6.0-8.0) and chemical oxygen demand (COD)/N ratio (≤1.5-6.0). The highest and lowest N-removal rates of 0.13 and 0.045 kg/(m³ d) are achieved at 30 and 15°C, respectively. Different conditions of pH and COD/N ratios in the SBRs of Partial nitritation/anammox (PN/A) significantly influenced both the metabolic processes and associated N-removal rates. The scientific insights gained from the current work signifies the possibility of mainstream PN/A at WWTPs. The current study forms a solid basis of operational window for the upcoming semi-technical trails to be conducted prior to the full-scale mainstream PN/A at WWTP Kaster and WWTPs globally.}, language = {en} }