TY - CHAP A1 - Zischank, Wolfgang J. A1 - Kern, Alexander A1 - Frentzel, Ralf A1 - Heidler, Fridolin A1 - Seevers, M. T1 - Assessment of the lightning transient coupling to control cables interconnecting structures in large industrial facilities and power plants N2 - Large industrial facilities and power plants often require a huge number fo information and control cables between the differnet structures. These I&C-cables can be routed in reinforced concrete cable ducts or in isolated buried cable runs. KTA 2206 is the German lightning protection standard for nuclear power plants. During the last several years considerable effort has been made to revise this standard. Despite the well established principles and design guidelines for the construction of the lightning protection system, this standard puts special emphasis on the coupling of transient overvoltages to I&C-cables. KW - Blitzschutz KW - Elektromagnetische Kopplung KW - Überspannung KW - Kraftwerke KW - Industrieanlagen KW - Lightning KW - current distribution KW - electromagnetic coupling KW - overvoltages Y1 - 2000 ER - TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank A1 - Müller, Klaus-Peter T1 - Lightning protection design of a renewable energy hybrid-system without power mains connection N2 - In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Lightning protection KW - Renewable energy KW - hybrid-system Y1 - 2001 ER - TY - CHAP A1 - Kern, Alexander A1 - Neskakis, Apostolos A1 - Müller, Klaus-Peter T1 - Blitzschutzkonzept für eine netz-autarke Hybridanlage am Beispiel der Anlage VATALI auf Kreta N2 - Netz-autarke Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaik- (PV-) Anlagen, ggf. auch Solarthermie- (ST-) Anlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet) und werden vor allem in Gegenden mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in rel. dünn bewohnten Gebieten und in Entwicklungsländern. Der Blitzschutz von netz-autarken Hybridanlagen ist ein bislang noch vergleichsweise unzureichend bearbeitetes Fachgebiet. Für große Windenergie-Anlagen (WEA) wurde in den letzten Jahren eine Zahl von FuE-Projekten durchgeführt, zum Großteil finanziert durch die öffentliche Hand, zum kleineren Teil auch durch die Industrie, d.h. die WEAHersteller. Dabei wurden bestehende Defizite im Design der WEA festgestellt und Maßnahmen vorgeschlagen, die vor den mechanischen Zerstörungen insbesondere des Rotors und vor den Störungen und Zerstörungen an den elektrischen / elektronischen Systemen der WEA weitgehend Schutz bieten [1, 2, 3]. Der Stand-der- Normung ist im Entwurf DIN VDE 0127 Teil 24 „Blitzschutz für Windenergieanlagen“ (dt. Übersetzung des internationalen Drafts IEC 61400-24 „Wind turbine generator systems; Part 24: Lightning Protection“) dokumentiert [4]. Die Maßnahmen sind allerdings insbesondere für größere WEA vorgesehen; im Falle kleinerer WEA lassen sie sich nur bedingt umsetzen. Trotzdem sind auch kleinere WEA rel. stark blitzeinschlaggefährdet, wenn sie auf einer Bergkuppe o.ä. platziert werden. Für solche kleinere WEA, wie sie bei Hybridanlagen üblicherweise Verwendung finden, müssen die Blitzschutzmaßnahmen aus der DIN VDE 0127 Teil 24 angepasst werden. Für PV- und ST-Anlagen ist eine entsprechende Blitzschutz-Norm noch nicht in Sicht. Hier ist vor allem der Schutz gegen direkte Blitzeinschläge in die Anlage bzw. die Gebäude noch nicht ausreichend beachtet. Blitzfangeinrichtungen sind oft nicht vorgesehen. In aller Regel hat man dabei bisher eine Ausführungsform des Blitzschutzes realisiert, die primär einen Ferneinschlag berücksichtigt und die dabei entstehenden induzierten, rel. energieschwachen Überspannungen durch schwächere Schutzelemente wie Rückstromdioden, Bypassdioden und zum Teil thermisch überwachte Varistoren begrenzt [5, 6, 7]. Diese Schutzelemente können allerdings bei Naheinschlägen bzw. Direkteinschlägen überlastet und damit zerstört werden. Darüber hinaus können Nahoder Direkteinschläge auch zur Schwächung der elektrischen Festigkeit der PVModulisolierung führen. Die Folge davon sind lokale extreme Wärmeentwicklungen, die sogar ein Schmelzen von Glas (sekundärer Langzeiteffekt) hervorrufen könnten. Bei einem Blitzeinschlag in die netz-autarke Hybridanlage VATALI auf Kreta im Jahre 2000 wurden sowohl einige mechanische wie auch elektrische Komponenten der Anlage zerstört bzw. zum Teil schwer beschädigt. Die Anlage VATALI besaß zum Zeitpunkt des Blitzeinschlags keinen wirksamen Blitzschutz. Der Gesamtschaden der Hardware belief sich auf ca. 60.000,- EURO. Die exponierte Stellung der Anlage auf einer Bergspitze stellte und stellt nach wie vor ein enormes Blitzeinschlag-Risiko dar, so dass auch zukünftig mit Blitzeinwirkungen gerechnet werden muss. Die Anlage wurde inspiziert, blitzschutz-technische Erfordernisse definiert und daraus Ertüchtigungsmaßnahmen abgeleitet, die mit überschaubarem Aufwand realisierbar sind. KW - Blitzschutz KW - Hybridanlage KW - Regenerative Energieanlagen KW - Lightning protection KW - renewable energy KW - hybrid system Y1 - 2001 ER - TY - CHAP A1 - Kern, Alexander A1 - Meppelink, Jan T1 - Neue Möglichkeiten elektrischer Anschlüsse an die Bewehrung und Untersuchung der Wirkung von Blitzströmen in bewehrtem Beton N2 - Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden. KW - Blitzschutz KW - Stahlbetonkonstruktion KW - Lightning Protection KW - reinforced concrete Y1 - 2001 ER - TY - CHAP A1 - Zischank, Wolfgang J. A1 - Heidler, Fridolin A1 - Kern, Alexander A1 - Metwally, I. A. A1 - Wiesinger, J. A1 - Seevers, M. T1 - Laboratory simulation of direct lightning strokes to a modelled building - measurement of magnetic fields and induced voltages N2 - In IEC 61312-2 equations for the assessment of the magnetic fields inside structures due to a direct lightning strike are given. These equations are based on computer simulations for shields consisting of a single-layer steel grid of a given mesh width. Real constructions, however, contain at least two layers of reinforcement steel grids. The objective of this study was to experimentally determine the additional shielding effectiveness of a second reinforcement layer compared to a single-layer grid. To this end, simulated structures were set up in the high current laboratory. The structures consisted of cubic cages of 2 m side length with one or with two reinforcement grids, respectively. The structures were exposed to direct lightning currents representing the variety of anticipated lightning current waveforms. The magnetic fields and their derivatives at several positions inside the structure as well as the voltage between “floor” and “roof” in the center were determined for different current injection points. From these data the improvement of the shielding caused by a second reinforcement layer is derived. KW - Direkter Blitzschlag KW - Elektromagnetischer Schutzschild KW - Magnetische Felder KW - Induzierte Spannungen KW - Stahlbetonkonstruktion KW - Lightning KW - electromagnetic shielding KW - magnetic field KW - reinforced concrete KW - induced voltage Y1 - 2002 ER - TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank T1 - Considerations about the lightning protection system of mains independent renewable energy hybrid-systems - practical experiences N2 - In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Photovoltaikanlage KW - Windenergieanlage KW - Lightning protection KW - renewable energy KW - hybrid system KW - photovoltaic system KW - wind turbine Y1 - 2002 ER - TY - CHAP A1 - Darveniza, M. A1 - Flisowski, Z. A1 - Kern, Alexander A1 - Landers, E.-U. A1 - LoPiparo, G. A1 - Mazzetti, C. A1 - Rousseau, A. A1 - Sherlock, J. T1 - Application problems of the probabilistic approach to the assessment of risk for structures and services N2 - The paper deals with the development of the probabilistic approach to the assessment of risk due to lightning. Sources of damage, types of damage and types of loss are defined and, accordingly, the procedure for risk analysis and the way of assessment of different risk components is proposed. The way to evaluate the influence of different protection measures (lightning protection system; shielding of structure, cables and equipment; routing of internal wiring; surge protective device) in reducing such probabilities is considered. The paper has been prepared within the framework of the activity of IEC TC81-WG9/CLC TC81-WG4 directed to prepare the draft IEC 62305-2 Risk Management, in cooperation with the Secretary of IEC/CLC TC81. KW - Blitzschutz KW - Risikoabwägung KW - Lightning protection system KW - risk assessment KW - protection measures Y1 - 2002 ER - TY - JOUR A1 - Kern, Alexander A1 - Krichel, Frank T1 - Überlegungen zum Blitzschutzkonzept für regenerative Energieanlagen N2 - Dem Blitzschutz von Anlagen der regenerativen Energien kommt in Zukunft eine steigende Bedeutung zu. Dabei ist es notwendig zu berücksichtigen, dass die Schutzmaßnahmen technisch/wirtschaftlich ausgewogen sind. Erbauer, Besitzer oder Benutzer von netzautarken Hybridanlagen haben zu entscheiden, ob die Anlage einen Schutz braucht oder nicht. Um diese Entscheidung zu fällen, ist eine Risikoanalyse als erster Schritt sinnvoll. Diese muss dabei die für die Hybridanlage relevanten Schadenarten und spezifischen Parameter, Werte und Randbedingungen mit einbeziehen. Dazu ist die Hilfe eines Blitzschutzexperten sehr hilfreich. KW - Alternative Energiequelle KW - Energietechnische Anlage KW - Blitzschutz KW - Blitzschutz KW - Regenerative Energieanlagen KW - Lightning protection KW - renewable energy Y1 - 2003 ER - TY - CHAP A1 - Kern, Alexander A1 - Krämer, Heinz-Josef T1 - Blitzschutzkonzept für eine bauliche Anlage mit Stahlkonstruktion und metallenen Wänden N2 - Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen Wänden sind bereits in sehr großer Zahl errichtet. Dazu gehören kleinere bis größere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilität, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abhängig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen müssen. Der Blitzschutz für diese baulichen Anlagen sollte sich also nicht nur im „klassischen“ Gebäude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] erschöpfen; ein Ergänzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großflächigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugehörigen blitzschutz-technischen Maßnahmen können drei Hauptbereichen zugeordnet werden: - Äußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgeführten Anlage mit Fotos beispielhaft dokumentiert. KW - Blitzschutz KW - Stahlbetonkonstruktion KW - Lightning protection KW - reinforced concrete Y1 - 2003 ER - TY - CHAP A1 - Kern, Alexander T1 - Risikomanagement nach DIN V 0185-2 VDE V 0185 Teil 2: 2002-11 - Einige Beispiele und erste Erfahrungen T1 - Risk management based on DIN V 0185-2 VDE V 0185 part 2: 2002-11 - Some examples and first experiences N2 - Die neue Vornorm VDE V 0185 Teil 2 „Risikomanagement: Abschätzung des Schadensrisikos für bauliche Anlagen“ [1] ist seit November 2002 gültig. Sie ermöglicht nicht nur die Ermittlung der Schutzklasse eines Blitzschutzsystems, sondern auch die Untersuchung zur Notwendigkeit anderer Schutzmaßnahmen gegen Blitzeinwirkungen (Überspannungsschutzgeräte in Unterverteilern und/oder an Endgeräten, Schirmung des Gebäudes und/oder interner Räume, Potentialsteuerung, Brandmelde- und Feuerlöscheinrichtungen, etc.) nach objektiven Kriterien und damit in einer für alle Beteiligten grundsätzlich nachvollziehbaren Art und Weise. Dass eine solche Analyse rel. komplex sein muss und der intensiven Beschäftigung bedarf, ist deshalb nicht verwunderlich. Die Komplexität des Verfahrens sollte allerdings nicht dazu führen, die Vornorm als Ganzes abzulehnen. Die Vornorm beruht auf dem Stand der Diskussion im internationalen Normengremium IEC TC81 WG9 Ende des Jahres 2000. Integriert wurden einige nationale Besonderheiten, die aus Sicht des zuständigen Normenkomitees DKE K251 erforderlich erschienen. In Deutschland konnten und können nun erste breite Erfahrungen in der Anwendung dieser Risikoanalyse gesammelt werden; in anderen Ländern ist dies noch nicht möglich. Diese Erfahrungen können dann, nach Diskussion im nationalen Rahmen, in die internationale Normenarbeit eingebracht werden. Im folgenden Beitrag sollen einige, seit Erscheinen der Vornorm oft wiederkehrende Fragen dargestellt und Lösungsvorschläge vorgestellt werden. Dabei wird auch auf die Tendenzen im internationalen Normengremium IEC TC81 WG9 eingegangen, d.h. auf den aktuellen Entwurf zur IEC 62305-2 [3]. Die Lösungsvorschläge werden begründet, sind allerdings weitestgehend subjektive Meinung des Autors. Für übliche bauliche Anlagen ist die Anwendung der Vornorm rel. einfach möglich. Auch für spezielle Fälle können die darin festgelegten Verfahren herangezogen werden; allerdings sind dann einige weiterführende Überlegungen notwendig, die der Planer von Blitzschutzsystemen durchführen muss. Anhand zweier Beispiele soll die Anwendung der VDE V 0185 Teil 2 auf solche speziellen Fälle dargestellt werden. KW - Blitzschutz KW - Risikomanagement KW - Lightning protection KW - risk management Y1 - 2003 ER -