TY - JOUR A1 - Förster, Arnold A1 - Lepsa, M. I. A1 - Freundt, D. T1 - Hot electron injector Gunn diode for advanced driver assistance systems JF - Applied physics A: materials science and processing. 87 (2007), H. 3 Y1 - 2007 SN - 0947-8396 N1 - ISSN der E-Ausg.: 1432-0630 ; Special issue SP - 545 EP - 558 ER - TY - JOUR A1 - Schneider, Bettina A1 - Schneider, Wilhelm T1 - [Kapitel 10] : Finanzierung / von Bettina und Wilhelm Schneider JF - Business-Management für Ingenieure : beurteilen - entscheiden - gestalten / Rolf Grap (Hrsg.). - (REFA-Fachbuchreihe Unternehmensentwicklung) Y1 - 2007 SN - 978-3-446-41256-9 N1 - ISBN 10: 3-446-41256-5 SP - 375 EP - 396 PB - Hanser CY - München ER - TY - JOUR A1 - Schneider, Bettina A1 - Schneider, Wilhelm T1 - Die Besteuerung des Unternehmens : Körperschaft-, Gewerbe- und Umsatzsteuer JF - Das Wirtschaftsstudium : wisu ; Zeitschrift für Ausbildung, Examen, Berufseinstieg und Weiterbildung. 36 (2007), H. 5 Y1 - 2007 SN - 0340-3084 N1 - In der Bereichsbibliothek Eupener Straße unter der Signatur 43 Z 568 vorhanden. SP - 652 EP - 655 ER - TY - JOUR A1 - Poghossian, Arshak A1 - Abouzar, Maryam H. A1 - Christiaens, P. A1 - Williams, O. A. A1 - Haenen, K. A1 - Wagner, P. A1 - Schöning, Michael Josef T1 - Nanocrystalline diamond-based field-effect (bio-)chemical sensor JF - 8. Dresdner Sensor-Symposium : Sensoren für Umwelt, Klima und Sicherheit, Biosensoren und Biosysteme, Sensoren und Sensorsysteme für die Prozesstechnik, Trends in der Sensortechnik, Materialentwicklung für die Sensorik; 8. Dresdner Sensor-Symposium, 10. - 12. Dezember 2007, Dresden / Gerald Gerlach ... (Hg.) Y1 - 2007 SN - 978-3-940046-45-1 N1 - Dresdner Sensor-Symposium <8, 2007, Dresden> ; Dresdner Beiträge zur Sensorik ; 29 SP - 191 EP - 194 PB - TUDpress, Verl. der Wissenschaften CY - Dresden ER - TY - JOUR A1 - Jochim, Haldor E. T1 - Verspätungsentschädigungen der Bahnen. Verkehrswirtschaftliche Anmerkungen zum Regierungsgutachten "Verbraucherschutz und Kundenrechte im öffentlichen Personenverkehr". JF - Internationales Verkehrswesen. 59 (2007), H. 3 Y1 - 2007 SN - 0020-9511 N1 - ab 09/2007 frei zugänglich SP - 95 EP - 99 ER - TY - JOUR A1 - Vu, Duc Khoi A1 - Staat, Manfred T1 - Shakedown analysis of structures made of materials with temperature-dependent yield stress JF - International Journal of Solids and Structures. 44 (2007), H. 13 Y1 - 2007 SN - 0020-7683 SP - 4524 EP - 4540 ER - TY - JOUR A1 - Vu, Duc Khoi A1 - Staat, Manfred A1 - Tran, Ich Thinh T1 - Analysis of pressure equipment by application of the primal-dual theory of shakedown JF - Communications in Numerical Methods in Engineering. 23 (2007), H. 3 Y1 - 2007 SN - 1069-8299 SP - 213 EP - 225 ER - TY - JOUR A1 - Staat, Manfred A1 - Vu, Duc-Khoi T1 - Limit analysis of flaws in pressurized pipes and cylindrical vessels. Part I: Axial defects JF - Engineering Fracture Mechanics. 74 (2007), H. 3 Y1 - 2007 SN - 0013-7944 SP - 431 EP - 450 ER - TY - JOUR A1 - Schneider, Bettina A1 - Schneider, Wilhelm T1 - Die Besteuerung des Unternehmens - Grundlagen und Einkommensteuer JF - Das Wirtschaftsstudium : wisu ; Zeitschrift für Ausbildung, Examen, Berufseinstieg und Weiterbildung. 36 (2007), H. 4 Y1 - 2007 SN - 0340-3084 N1 - In der Bereichsbibliothek Eupener Straße unter der Signatur 43 Z 568 vorhanden. SP - 476 EP - 480 ER - TY - JOUR A1 - Kern, Alexander T1 - Neue deutsche Blitzschutz-Normung. Reihe DIN EN 62305 / VDE 01 85-305-x:2006 JF - Der Eisenbahningenieur. 58 (2007), H. 8 Y1 - 2007 SN - 0013-2810 N1 - in der Bereichsbibliothek Bayernallee vorhanden SP - 18 EP - 22 ER - TY - JOUR A1 - Wagner, Torsten A1 - Beging, Stefan A1 - Rotter, L. A1 - Poghossian, Arshak A1 - Biselli, Manfred A1 - Zang, Werner A1 - Schöning, Michael Josef T1 - Online-Messsysteme für die automatisierte Charakterisierung von feldeffektbasierten Biosensoren JF - 8. Dresdner Sensor-Symposium : Sensoren für Umwelt, Klima und Sicherheit, Biosensoren und Biosysteme, Sensoren und Sensorsysteme für die Prozesstechnik, Trends in der Sensortechnik, Materialentwicklung für die Sensorik; 8. Dresdner Sensor-Symposium, 10. - 12. Dezember 2007, Dresden / Gerald Gerlach ... (Hg.) Y1 - 2007 SN - 978-3-940046-45-1 N1 - Dresdner Sensor-Symposium <8, 2007, Dresden> ; Dresdner Beiträge zur Sensorik ; 29 SP - 257 EP - 260 PB - TUDpress, Verl. der Wissenschaften CY - Dresden ER - TY - JOUR A1 - Zhubanova, Azhar A. A1 - Digel, Ilya A1 - Nojima, H. A1 - Artmann, Gerhard T1 - The use of bactericidal effects of cluster ions generated by plasma in medical biotechnology N2 - The most of conventional methods of air purification use the power of a fan to draw in air and pass it through a filter. The problem of bacterial contamination of inner parts of such a type of air conditioners in some cases draws attention towards alternative air-cleaning systems. Some manufacturers offer to use the ozone's bactericidal and deodorizing effects, but the wide spreading of such systems is restricted by the fact that toxic effects of ozone in respect of human beings are well known. In 2000 Sharp Inc. introduced "Plasma Cluster Ions (PCI)" air purification technology, which uses plasma discharge to generate cluster ions (I 0-14 ). This technology has been developed for those customers that are conscious about health and hygiene. In our experiments, we focused on some principal aspects of plasma-generated ions application - time-dependency and irreversibility of bactericidal action, spatial and kinetic characteristics of emitted cluster particles, their chemical targets in the microbial cells. KW - Clusterion KW - Raumluft KW - Luftreiniger KW - Plasmacluster ion technology KW - Air purification Y1 - 2007 ER - TY - JOUR A1 - Kraft, Bodo A1 - Nagl, Manfred T1 - Visual Knowledge Specification for Conceptual Design: Definition and Tool Support N2 - In: Advanced Engineering Informatics. Vol 21, Issue 1, 2007, Pages 67-83 http://dx.doi.org/10.1016/j.aei.2006.10.001 eds. J.C. Kunz, I.F.C. Smith and T. Tomiyama, Elsevier, Seite 1-22 Current CAD tools are not able to support the conceptual design phase, and none of them provides a consistency analysis for sketches produced by architects. This phase is fundamental and crucial for the whole design and construction process of a building. To give architects a better support, we developed a CAD tool for conceptual design and a knowledge specification tool. The knowledge is specific to one class of buildings and it can be reused. Based on a dynamic and domain-specific knowledge ontology, different types of design rules formalize this knowledge in a graph-based form. An expressive visual language provides a user-friendly, human readable representation. Finally, a consistency analysis tool enables conceptual designs to be checked against this formal conceptual knowledge. In this article, we concentrate on the knowledge specification part. For that, we introduce the concepts and usage of a novel visual language and describe its semantics. To demonstrate the usability of our approach, two graph-based visual tools for knowledge specification and conceptual design are explained. KW - CAD KW - CAD KW - Bauingenieurwesen KW - CAD KW - civil engineering Y1 - 2007 ER - TY - JOUR A1 - Daniel, Bernd A1 - Starck, Andreas T1 - Die Anwendung der VOB in der baubetrieblichen Praxis N2 - Eine Einführung in die Anwendung der VOB in der baubetrieblichen Praxis im Rahmen der ergänzenden Schriften zu den Vorlesungen. Die Anwendung der VOB als Vertragsbedingung für einen Bauvertrag ist gängige Praxis, über die der Architekt im Baubetrieb umfassend informiert sein muß. Die Anwendung der VOB im Bauvertrag bedarf der vorherigen Vereinbarung zwischen den Vertragsparteien. Dabei muß die VOB im Ganzen vereinbart werden. Eine Veränderung dieser Bestimmungen führt zur teilweisen Unwirksamkeit der vertraglichen Vereinbarung. Der Architekt, der für seinen Bauherrn die Vergabeunterlagen zusammenstellen muß, haftet für Fehler bei der Formulierung oder der Zusammenstellung. Es ist daher für den Architekten unerläßlich, die vertraglichen Zusammenhänge zu kennen. Dieser Fachaufsatz soll zu einem sicheren Umgang mit der VOB als Vertragsgrundlage beitragen. KW - Baubetrieb KW - Bauvertrag KW - VOB KW - Vertragsbedingungen Y1 - 2007 ER - TY - JOUR A1 - Daniel, Bernd A1 - Starck, Andreas T1 - Kostenkontrolle und Kostensteuerung im Hochbau N2 - Textauszug: Nach dem Leistungsbild der HOAI hat der Architekt bei Planung und Baubetrieb vier Stationen der Kostenermittlung entsprechend der DIN 276, Abschnitt 2.3 abzuarbeiten. Der Architekt, der seiner Verantwortung gerecht werden will, wird hier weitere Kontrollmechanismen einbauen wollen. Über die genannten Kostenermittlungen hinaus kennt die DIN 276 daher noch das Erfordernis der Kostenkontrolle in Abschnitt 2.4 und der Kostensteuerung in Abschnitt 2.5. Die Kostensteuerung greift immer dann, wenn die Kostenkontrolle eine Abweichung des Kostenrahmens von den Sollwerten aufzeigt. Dazu müssen die Kontrollinstanzen dort eingebaut werden, wo Korrekturen noch möglich sind. Eine erste Kontrolle der Kosten ist daher zwischen Massenermittlung und Vergabe sinnvoll einzuflechten. Zu diesem Zeitpunkt kann die Planung noch verändert werden, was einen ersten steuernden Eingriff in die Baukosten ermöglicht, und zwar bevor die Angebotsunterlagen verschickt werden. Die Grundlagen zu einer effektiven Kostensteuerung werden in der Mengenermittlung der Leistungsphase 6 gelegt. Wenn dort die Mengen nicht sorgfältig und nachvollziehbar ermittelt wurden, wird der Soll- Ist- Abgleich während der Bauphase nicht frühzeitig genug gelingen, wenn nicht gar ganz entfallen. Es gilt also, dafür zu sorgen, dass die Mengenermittlung zur Vergabe mit entsprechender Sorgfalt und vor Allem „projektnah“ erfolgt. Schätzungen haben hier keine Berechtigung. KW - Projektsteuerung KW - Baukosten KW - Kostenkontrolle KW - Kostensteuerung KW - Kostenermittlung Y1 - 2007 ER - TY - JOUR A1 - Starck, Andreas T1 - Projektsteuerung contra Architektengrundleistung oder wer steuert das Baugeschehen? N2 - Sieht man sich die umfangreichen Betätigungsfelder für einen Projektsteuerer in den Publikationen der einschlägigen Verbände und der Anbieter etwas genauer an, so wird man feststellen, das nach der eigentlichen Projektvorbereitungsphase mit Wirtschaftlichkeitsberechnungen und Sicherstellung der Finanzierung erhebliche Überschneidungen zu den in der HOAI ausgewiesenen Tätigkeiten der weiteren Planungsbeteiligten, insbesondere des Gebäudeplaners, also des Architekten bestehen. Geht man nun davon aus, dass der Bauherr diese Leistungen nicht doppelt bezahlen will, wäre die logische Konsequenz aus der vollumfänglichen Beauftragung eines Projektsteuerers die Verminderung des Auftragsumfangs an den Architekten, verbunden mit einer Honorarminderung für den Architekten. Damit bricht dem Architekten bei eingehender Betrachtung am Ende mehr als die Hälfte seiner Tätigkeit und damit seiner Grundlage zur Honorarerzielung weg. Der Bauherr muss in erster Linie seine Wünsche definieren und sein Budget bestimmen. Er beauftragt die Planungsbeteiligten und nimmt deren Leistungen entgegen. Sein Problem dabei ist, dass er diese Leistung nicht beurteilen kann, weder in Bezug auf deren Vollständigkeit, noch in Bezug auf deren Inhalt. Hier steht der Projektsteuerer im eigentlichen Sinne. Er muss wissen, was die Planungsbeteiligten für ihr Geld zu leisten haben und wie er diese Leistungen durchsetzen kann. Letztendlich sorgt er dann aber auch dafür, das die Architektenleistungen, also Planung und Ausschreibungsunterlagen vom Bauherrn verstanden werden. Warum aber kann der Architekt selbst seine Leistungen und damit den Nachweis der Leistungserfüllung nicht selbst dem Bauherrn verständlich und damit glaubhaft machen? Es liegt also letztlich in der Hand der Architekten, ob ihr Betätigungsfeld weiter durch in die Planung und Gestaltung eingreifende, zusätzliche Projektsteuerer und Generalunternehmer eingeengt oder sogar weggenommen werden kann. Die Frage, wer das Baugeschehen steuert und lenkt bleibt solange ungeklärt, wie die Architekten dieses Tätigkeitsfeld des Architekten im Baubetrieb weiterhin nur unzulänglich ausfüllen können und wollen. Y1 - 2007 ER -