TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank T1 - Considerations about the lightning protection system of mains independent renewable energy hybrid-systems - practical experiences N2 - In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Photovoltaikanlage KW - Windenergieanlage KW - Lightning protection KW - renewable energy KW - hybrid system KW - photovoltaic system KW - wind turbine Y1 - 2002 ER - TY - CHAP A1 - Darveniza, M. A1 - Flisowski, Z. A1 - Kern, Alexander A1 - Landers, E.-U. A1 - LoPiparo, G. A1 - Mazzetti, C. A1 - Rousseau, A. A1 - Sherlock, J. T1 - Application problems of the probabilistic approach to the assessment of risk for structures and services N2 - The paper deals with the development of the probabilistic approach to the assessment of risk due to lightning. Sources of damage, types of damage and types of loss are defined and, accordingly, the procedure for risk analysis and the way of assessment of different risk components is proposed. The way to evaluate the influence of different protection measures (lightning protection system; shielding of structure, cables and equipment; routing of internal wiring; surge protective device) in reducing such probabilities is considered. The paper has been prepared within the framework of the activity of IEC TC81-WG9/CLC TC81-WG4 directed to prepare the draft IEC 62305-2 Risk Management, in cooperation with the Secretary of IEC/CLC TC81. KW - Blitzschutz KW - Risikoabwägung KW - Lightning protection system KW - risk assessment KW - protection measures Y1 - 2002 ER -