TY - CHAP A1 - Neumann, Hannah A1 - Adam, Mario A1 - Backes, Klaus A1 - Börner, Martin A1 - Clees, Tanja A1 - Doetsch, Christian A1 - Glaeser, Susanne A1 - Herrmann, Ulf A1 - May, Johanna A1 - Rosenthal, Florian A1 - Sauer, Dirk Uwe A1 - Stadler, Ingo T1 - Development of open educational resources for renewable energy and the energy transition process T2 - ISES SWC 2021 N2 - The dissemination of knowledge about renewable energies is understood as a social task with the highest topicality. The transfer of teaching content on renewable energies into digital open educational resources offers the opportunity to significantly accelerate the implementation of the energy transition. Thus, in the here presented project six German universities create open educational resources for the energy transition. These materials are available to the public on the internet under a free license. So far there has been no publicly accessible, editable media that cover entire learning units about renewable energies extensively and in high technical quality. Thus, in this project, the content that remains up-to-date for a longer period is appropriately prepared in terms of media didactics. The materials enable lecturers to provide students with in-depth training about technologies for the energy transition. In a particular way, the created material is also suitable for making the general public knowledgeable about the energy transition with scientifically based material. KW - energy transition KW - renewable energies KW - open educational resources KW - dissemination KW - digitalization Y1 - 2021 U6 - http://dx.doi.org/10.18086/swc.2021.47.03 N1 - ISES Solar World Congress, virtual conference 25-29 October 2021 PB - International Solar Energy Society CY - Freiburg ER - TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz A1 - Ulbrich, Michelle T1 - Digital planning using building information modelling and virtual reality: new approach for students’ remote practical training under lockdown conditions in the course of smart building engineering T2 - Proceedings of International Conference on Education in Mathematics, Science and Technology 2021 N2 - The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions. KW - smart building engineering KW - building information modelling KW - virtual reality KW - lockdown conditions KW - emote practical training Y1 - 2021 SN - 978-1-952092-17-6 N1 - April 1-4, 2021 in Antalya, Turkey. SP - 118 EP - 123 PB - ISTES Organization CY - San Antonio, TX ER - TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz T1 - Interdisciplinary Course Smart Building Engineering: A new approach of teaching freshmen in remote teamwork project under pandemic restrictions T2 - New Perspectives in Science Education -International Conference (virtual event, 18-19 March 2021) N2 - In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future. KW - Freshmen KW - roleplay KW - Smart Building Engineering KW - BIM KW - remote teamwork Y1 - 2021 N1 - New Perspectives in Science Education - 10th Edition 18-19 March 2021 Fully Virtual Conference PB - Filodiritto CY - Bologna ER - TY - CHAP A1 - Ulmer, Jessica A1 - Braun, Sebastian A1 - Wollert, Jörg T1 - Adaptive VR-Produktionsumgebungen für Evaluations- und Schulungstätigkeiten T1 - Adaptive VR production environments for evaluation and training purposes T2 - Automation 2021: Navigating towards resilient Production N2 - Industrie 4.0 stellt viele Herausforderungen an produzierende Unternehmen und ihre Beschäf-tigten. Innovative und effektive Trainingsstrategien sind erforderlich, um mit den sich schnell verändernden Produktionsumgebungen und neuen Fertigungstechnologien Schritt halten zu können. Virtual Reality (VR) bietet neue Möglichkeiten für On-the-Job, On-Demand- und Off-Premise-Schulungen. Diese Arbeit stellt ein neues VR Schulungssystem vor, welches sich flexible an unterschiedliche Trainingsobjekte auf Grundlage von Rezepten und CAD Modellen anpassen lässt. Das Konzept basiert auf gerichteten azyklischen Graphen und einem Level-system. Es ermöglicht eine benutzerindividuelle Lerngeschwindigkeit mittels visueller Ele-mente. Das Konzept wurde für einen mechanischen Anwendungsfall mit Industriekomponen-ten implementiert und in der Industrie 4.0-Modellfabrik der FH Aachen umgesetzt. N2 - Industry 4.0 poses many challenges for manufacturing companies and their employees. Inno-vative and effective training strategies are needed to keep pace with rapidly changing produc-tion environments and new manufacturing technologies. Virtual reality (VR) offers new oppor-tunities for on-the-job, on-demand, and off-premise training. This work presents a new VR training system that can be flexibly adapted to different training objects based on recipes and CAD models. The concept is based on directed acyclic graphs and a level system. It allows a user-individual learning speed by means of visual elements. The concept was implemented for a mechanical use case with industrial components and implemented in the industry 4.0 model factory of the FH Aachen University of Applied Sciences. Y1 - 2021 SN - 978-3-18-092392-5 U6 - http://dx.doi.org/10.51202/9783181023921-55 SN - 0083-5560 N1 - 22. Leitkongress der Mess- und Automatisierungstechnik, 9. und 30. Juni 2021. SP - 55 EP - 64 PB - VDI CY - Düsseldorf ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - http://dx.doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz T1 - Miniature urban farming plant: a complex educational “Toy” for engineering students T2 - The Future of Education 11th Edition 2021 N2 - Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way. KW - urban farming KW - food production KW - smart engineering KW - 3D printing KW - sustainability Y1 - 2021 N1 - FOE 2021 : The Future of Education International Conference – Fully Virtual Edition; 01.07.2021-02.07.2021; Florence, Italy ER - TY - CHAP A1 - Schopen, Oliver A1 - Kemper, Hans A1 - Esch, Thomas T1 - Development of a comparison methodology and evaluation matrix for electrically driven compressors in ICE and FC T2 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG) International Conference N2 - In addition to electromobility and alternative drive systems, a focus is set on electrically driven compressors (EDC), with a high potential for increasing the efficiency of internal combustion engines (ICE) and fuel cells [01]. The primary objective is to increase the ICE torque, provided independently of the ICE speed by compressing the intake air and consequently the ICE filling level supported by the compressor. For operation independent from the ICE speed, the EDC compressor is decoupled from the turbine by using an electric compressor motor (CM) instead of the turbine. ICE performances can be increased by the use of EDC where individual compressor parameters are adapted to the respective application area [02] [03]. This task contains great challenges, increased by demands with regard to pollutant reduction while maintaining constant performance and reduced fuel consumption. The FH-Aachen is equipped with an EDC test bench which enables EDC-investigations in various configurations and operating modes. Characteristic properties of different compressors can be determined, which build the basis for a comparison methodology. Subject of this project is the development of a comparison methodology for EDC with an associated evaluation method and a defined overall evaluation method. For the application of this comparison methodology, corresponding series of measurements are carried out on the EDC test bench using an appropriate test device. KW - electro mobility KW - fuel cell KW - internal combustion engine KW - electrically driven compressors Y1 - 2021 SN - 978-3-902103-94-9 N1 - 1st UNITED-SAIG International Conference, 21-22 APR 2021, Chulalongkorn University, Thailand SP - 45 EP - 46 PB - FH Joanneum CY - Graz ER - TY - CHAP A1 - Dey, Thomas A1 - Elsen, Ingo A1 - Ferrein, Alexander A1 - Frauenrath, Tobias A1 - Reke, Michael A1 - Schiffer, Stefan ED - Makedon, Fillia T1 - CO2 Meter: a do-it-yourself carbon dioxide measuring device for the classroom T2 - PETRA 2021: The 14th PErvasive Technologies Related to Assistive Environments Conference N2 - In this paper we report on CO2 Meter, a do-it-yourself carbon dioxide measuring device for the classroom. Part of the current measures for dealing with the SARS-CoV-2 pandemic is proper ventilation in indoor settings. This is especially important in schools with students coming back to the classroom even with high incidents rates. Static ventilation patterns do not consider the individual situation for a particular class. Influencing factors like the type of activity, the physical structure or the room occupancy are not incorporated. Also, existing devices are rather expensive and often provide only limited information and only locally without any networking. This leaves the potential of analysing the situation across different settings untapped. Carbon dioxide level can be used as an indicator of air quality, in general, and of aerosol load in particular. Since, according to the latest findings, SARS-CoV-2 can be transmitted primarily in the form of aerosols, carbon dioxide may be used as a proxy for the risk of a virus infection. Hence, schools could improve the indoor air quality and potentially reduce the infection risk if they actually had measuring devices available in the classroom. Our device supports schools in ventilation and it allows for collecting data over the Internet to enable a detailed data analysis and model generation. First deployments in schools at different levels were received very positively. A pilot installation with a larger data collection and analysis is underway. KW - embedded hardware KW - sensor networks KW - information systems KW - education KW - do-it-yourself Y1 - 2021 SN - 9781450387927 U6 - http://dx.doi.org/10.1145/3453892.3462697 N1 - PETRA '21: The 14th PErvasive Technologies Related to Assistive Environments Conference Corfu Greece 29 June 2021- 2 July 2021 SP - 292 EP - 299 PB - Association for Computing Machinery CY - New York ER - TY - CHAP A1 - Butenweg, Christoph A1 - Marinković, Marko A1 - Pavese, Alberto A1 - Lanese, Igor A1 - Hoffmeister, Benno A1 - Pinkawa, Marius A1 - Vulcu, Mihai-Cristian A1 - Bursi, Oreste A1 - Nardin, Chiara A1 - Paolacci, Fabrizio A1 - Quinci, Gianluca A1 - Fragiadakis, Michalis A1 - Weber, Felix A1 - Huber, Peter A1 - Renault, Philippe A1 - Gündel, Max A1 - Dyke, Shirley A1 - Ciucci, M. A1 - Marino, A. T1 - Seismic performance of multi-component systems in special risk industrial facilities T2 - 17. World Conference on Earthquake Engineering , Sendai , Japan , 17WCEE , 2021-09-27 - 2021-10-02 N2 - Past earthquakes demonstrated the high vulnerability of industrial facilities equipped with complex process technologies leading to serious damage of the process equipment and multiple and simultaneous release of hazardous substances in industrial facilities. Nevertheless, the design of industrial plants is inadequately described in recent codes and guidelines, as they do not consider the dynamic interaction between the structure and the installations and thus the effect of seismic response of the installations on the response of the structure and vice versa. The current code-based approach for the seismic design of industrial facilities is considered not enough for ensure proper safety conditions against exceptional event entailing loss of content and related consequences. Accordingly, SPIF project (Seismic Performance of Multi- Component Systems in Special Risk Industrial Facilities) was proposed within the framework of the European H2020 - SERA funding scheme (Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe). The objective of the SPIF project is the investigation of the seismic behavior of a representative industrial structure equipped with complex process technology by means of shaking table tests. The test structure is a three-story moment resisting steel frame with vertical and horizontal vessels and cabinets, arranged on the three levels and connected by pipes. The dynamic behavior of the test structure and installations is investigated with and without base isolation. Furthermore, both firmly anchored and isolated components are taken into account to compare their dynamic behavior and interactions with each other. Artificial and synthetic ground motions are applied to study the seismic response at different PGA levels. After each test, dynamic identification measurements are carried out to characterize the system condition. The contribution presents the numerical simulations to calibrate the tests on the prototype, the experimental setup of the investigated structure and installations, selected measurement data and finally describes preliminary experimental results. KW - industrial facilities KW - piping KW - installations KW - seismic loading KW - earthquakes Y1 - 2021 ER - TY - CHAP A1 - Šakić, Bogdan A1 - Milijaš, Aleksa A1 - Marinković, Marko A1 - Butenweg, Christoph A1 - Klinkel, Sven ED - Papadrakakis, Manolis ED - Fragiadakis, Michalis T1 - Influence of prior in-plane damage on the out-of-plane response of non-load bearing unreinforced masonry walls under seismic load T2 - 8th ECCOMAS Thematic Conference on Computational Methods in Structural Dynamics and Earthquake Engineering N2 - Reinforced concrete frames with masonry infill walls are popular form of construction all over the world as well in seismic regions. While severe earthquakes can cause high level of damage of both reinforced concrete and masonry infills, earthquakes of lower to medium intensity some-times can cause significant level of damage of masonry infill walls. Especially important is the level of damage of face loaded infill masonry walls (out-of-plane direction) as out-of-plane load cannot only bring high level of damage to the wall, it can also be life-threating for the people near the wall. The response in out-of-plane direction directly depends on the prior in-plane damage, as previous investigation shown that it decreases resistance capacity of the in-fills. Behaviour of infill masonry walls with and without prior in-plane load is investigated in the experimental campaign and the results are presented in this paper. These results are later compared with analytical approaches for the out-of-plane resistance from the literature. Conclusions based on the experimental campaign on the influence of prior in-plane damage on the out-of-plane response of infill walls are compared with the conclusions from other authors who investigated the same problematic. KW - Earthquake Engineering KW - Unreinforced masonry walls KW - Out-of-plane load KW - In- plane damage KW - Out-of-plane failure Y1 - 2021 SN - 9786188507258 U6 - http://dx.doi.org/10.7712/120121.8527.18913 SN - 2623-3347 N1 - COMPDYN 2021 28-30 June 2021, Streamed from Athens, Greece SP - 808 EP - 828 PB - National Technical University of Athens CY - Athen ER - TY - CHAP A1 - Milijaš, Aleksa A1 - Šakić, Bogdan A1 - Marinković, Marko A1 - Butenweg, Christoph ED - Papadrakakis, Manolis ED - Fragiadakis, Michalis T1 - Experimental investigation of behaviour of masonry infilled RC frames under out-of-plane loading T2 - 8th ECCOMAS Thematic Conference on Computational Methods in Structural Dynamics and Earthquake Engineering N2 - Masonry infills are commonly used as exterior or interior walls in reinforced concrete (RC) frame structures and they can be encountered all over the world, including earthquake prone regions. Since the middle of the 20th century the behaviour of these non-structural elements under seismic loading has been studied in numerous experimental campaigns. However, most of the studies were carried out by means of in-plane tests, while there is a lack of out-of-plane experimental investigations. In this paper, the out-of-plane tests carried out on full scale masonry infilled frames are described. The results of the out-of-plane tests are presented in terms of force-displacement curves and measured out-of-plane displacements. Finally, the reliability of existing analytical approaches developed to estimate the out-of-plane strength of masonry infills is examined on presented experimental results. KW - Seismic loading KW - Masonry infill KW - Out-of-plane load KW - Out-of-plane strength Y1 - 2021 SN - 978-618-85072-5-8 U6 - http://dx.doi.org/10.7712/120121.8528.18914 SN - 2623-3347 N1 - COMPDYN 2021 28-30 June 2021, Streamed from Athens, Greece SP - 829 EP - 846 PB - National Technical University of Athens CY - Athen ER - TY - CHAP A1 - Butenweg, Christoph ED - Kuzmanović, Vladan ED - Ignjatović, Ivan T1 - Integrated approach for monitoring and management of buildings with digital building models and modern sensor technologies T2 - Civil Engineering 2021 – Achievements and Visions: Proceedings of the International Conferenecs celebrating 175th Anniversary of the Faculty of Civil Engineering, University of Belgrade, October 25 – 26, 2021 Belgrade, Serbia Y1 - 2021 PB - University of Belgrade CY - Belgrade ER - TY - CHAP A1 - Milkova, Kristina A1 - Butenweg, Christoph A1 - Dumova-Jovanoska, Elena T1 - Region-sensitive comprehensive procedure for determination of seismic fragility curves T2 - 1st Croatian Conference on Earthquake Engineering 1CroCEE 22-24 March 2021 Zagreb, Croatia N2 - Seismic vulnerability estimation of existing structures is unquestionably interesting topic of high priority, particularly after earthquake events. Having in mind the vast number of old masonry buildings in North Macedonia serving as public institutions, it is evident that the structural assessment of these buildings is an issue of great importance. In this paper, a comprehensive methodology for the development of seismic fragility curves of existing masonry buildings is presented. A scenario – based method that incorporates the knowledge of the tectonic style of the considered region, the active fault characterization, the earth crust model and the historical seismicity (determined via the Neo Deterministic approach) is used for calculation of the necessary response spectra. The capacity of the investigated masonry buildings has been determined by using nonlinear static analysis. MINEA software (SDA Engineering) is used for verification of the structural safety of the structures Performance point, obtained from the intersection of the capacity of the building and the spectra used, is selected as a response parameter. The thresholds of the spectral displacement are obtained by splitting the capacity curve into five parts, utilizing empirical formulas which are represented as a function of yield displacement and ultimate displacement. As a result, four levels of damage limit states are determined. A maximum likelihood estimation procedure for the process of fragility curves determination is noted as a final step in the proposed procedure. As a result, region specific series of vulnerability curves for structures are defined. KW - seismic risk KW - seismic vulnerability KW - fragility curves KW - masonry structures Y1 - 2021 U6 - http://dx.doi.org/10.5592/CO/1CroCEE.2021.158 SP - 121 EP - 128 PB - University of Zagreb CY - Zagreb ER - TY - CHAP A1 - Balaskas, Georgios A1 - Hoffmeister, Benno A1 - Butenweg, Christoph A1 - Pilz, Marco A1 - Bauer, Anna ED - Papadrakakis, Manolis ED - Fragiadakis, Michalis T1 - Earthquake early warning and response system based on intelligent seismic and monitoring sensors embedded in a communication platform and coupled with BIM models T2 - 8th ECCOMAS Thematic Conference on Computational Methods in Structural Dynamics and Earthquake Engineering N2 - This paper describes the concept of an innovative, interdisciplinary, user-oriented earthquake warning and rapid response system coupled with a structural health monitoring system (SHM), capable to detect structural damages in real time. The novel system is based on interconnected decentralized seismic and structural health monitoring sensors. It is developed and will be exemplarily applied on critical infrastructures in Lower Rhine Region, in particular on a road bridge and within a chemical industrial facility. A communication network is responsible to exchange information between sensors and forward warnings and status reports about infrastructures’health condition to the concerned recipients (e.g., facility operators, local authorities). Safety measures such as emergency shutdowns are activated to mitigate structural damages and damage propagation. Local monitoring systems of the infrastructures are integrated in BIM models. The visualization of sensor data and the graphic representation of the detected damages provide spatial content to sensors data and serve as a useful and effective tool for the decision-making processes after an earthquake in the region under consideration. KW - early warning and response system KW - interconnected sensor systems KW - seismic structural damage detection via SHM KW - integration SHM in BIM Y1 - 2021 SN - 978-618-85072-5-8 U6 - http://dx.doi.org/10.7712/120121.8539.18855 SN - 2623-3347 N1 - COMPDYN 2021 28-30 June 2021, Streamed from Athens, Greece SP - 987 EP - 998 PB - National Technical University of Athens CY - Athen ER - TY - CHAP A1 - Butenweg, Christoph A1 - Bursi, Oreste S. A1 - Nardin, Chiara A1 - Lanese, Igor A1 - Pavese, Alberto A1 - Marinković, Marko A1 - Paolacci, Fabrizio A1 - Quinci, Gianluca T1 - Experimental investigation on the seismic performance of a multi-component system for major-hazard industrial facilities T2 - Pressure Vessels & Piping Virtual Conference July 13-15, 2021 N2 - Past earthquakes demonstrated the high vulnerability of industrial facilities equipped with complex process technologies leading to serious damage of the process equipment and multiple and simultaneous release of hazardous substances in industrial facilities. Nevertheless, the design of industrial plants is inadequately described in recent codes and guidelines, as they do not consider the dynamic interaction between the structure and the installations and thus the effect of seismic response of the installations on the response of the structure and vice versa. The current code-based approach for the seismic design of industrial facilities is considered not enough for ensure proper safety conditions against exceptional event entailing loss of content and related consequences. Accordingly, SPIF project (Seismic Performance of Multi-Component Systems in Special Risk Industrial Facilities) was proposed within the framework of the European H2020 - SERA funding scheme (Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe). The objective of the SPIF project is the investigation of the seismic behaviour of a representative industrial structure equipped with complex process technology by means of shaking table tests. The test structure is a three-story moment resisting steel frame with vertical and horizontal vessels and cabinets, arranged on the three levels and connected by pipes. The dynamic behaviour of the test structure and of its relative several installations is investigated. Furthermore, both process components and primary structure interactions are considered and analyzed. Several PGA-scaled artificial ground motions are applied to study the seismic response at different levels. After each test, dynamic identification measurements are carried out to characterize the system condition. The contribution presents the experimental setup of the investigated structure and installations, selected measurement data and describes the obtained damage. Furthermore, important findings for the definition of performance limits, the effectiveness of floor response spectra in industrial facilities will be presented and discussed. KW - industrial facilities KW - piping KW - installations KW - seismic loading KW - earthquakes Y1 - 2021 SN - 9780791885352 U6 - http://dx.doi.org/10.1115/PVP2021-61696 PB - American Society of Mechanical Engineers (ASME) CY - New York ER - TY - CHAP A1 - Fiedler, Gerda A1 - Gottschlich-Müller, Birgit A1 - Melcher, Karin ED - Liu-Henke, Xiaobo ED - Durak, Umut T1 - Online-Prüfungen mit STACK Aufgaben T2 - Tagungsband ASIM Workshop STS/GMMS/EDU 2021 N2 - Wir stellen hier exemplarisch STACK Aufgaben vor, die frei von der Problematik sind, welche sich durch diverse Kommunikationswege und (webbasierte) Computer Algebra Systeme (CAS) ergibt. Daher sind sie insbesondere für eine Open-Book Online Prüfung geeignet, da eine faire Prüfungssituation gewährleistet werden kann. Y1 - 2021 SN - 978-3-901608-69-8 U6 - http://dx.doi.org/10.11128/arep.45 N1 - Virtueller Workshop, ASIM STS/GMMS & EDU 2021, 11.-12. März 2021 PB - ARGESIM Verlag CY - Wien ER - TY - CHAP A1 - Ritschel, Konstantin A1 - Stenzel, Adina A1 - Czarnecki, Christian A1 - Hong, Chin-Gi ED - Gesellschaft für Informatik e.V. (GI), T1 - Realizing robotic process automation potentials: an architectural perspective on a real-life implementation case T2 - GI Edition Proceedings Band 314 "INFORMATIK 2021" Computer Science & Sustainability N2 - The initial idea of Robotic Process Automation (RPA) is the automation of business processes through a simple emulation of user input and output by software robots. Hence, it can be assumed that no changes of the used software systems and existing Enterprise Architecture (EA) is required. In this short, practical paper we discuss this assumption based on a real-life implementation project. We show that a successful RPA implementation might require architectural work during analysis, implementation, and migration. As practical paper we focus on exemplary lessons-learned and new questions related to RPA and EA. KW - Robotic Process Automation KW - Enterprise Architecture KW - Implementation Case Y1 - 2021 SN - 9783885797081 SN - 1617-5468 N1 - INFORMATIK 2021 – 51. Jahrestagung der Gesellschaft für Informatik, 27. September – 01. Oktober 2021 / Virtuell, Berlin. https://informatik2021.gi.de/ SP - 1303 EP - 1311 PB - Köllen CY - Bonn ER - TY - CHAP A1 - Mertens, Alexander A1 - Pütz, Sebastian A1 - Brauner, Philipp A1 - Brillowski, Florian Sascha A1 - Buczak, Nadine A1 - Dammers, Hannah A1 - van Dyck, Marc A1 - Kong, Iris A1 - Königs, Peter A1 - Kortomeikel, Frauke Carole A1 - Rodemann, Niklas A1 - Schaar, Anne Kathrin A1 - Steuer-Dankert, Linda A1 - Wlecke, Shari A1 - Gries, Thomas A1 - Leicht-Scholten, Carmen A1 - Nagel, Saskia K. A1 - Piller, Frank Thomas A1 - Schuh, Günther A1 - Ziefle, Martina A1 - Nitsch, Verena T1 - Human digital shadow: Data-based modeling of users and usage in the internet of production T2 - 14th International Conference on Human System Interaction : 8-10 July 2021. Gdańsk, Poland N2 - Digital Shadows as the aggregation, linkage and abstraction of data relating to physical objects are a central vision for the future of production. However, the majority of current research takes a technocentric approach, in which the human actors in production play a minor role. Here, the authors present an alternative anthropocentric perspective that highlights the potential and main challenges of extending the concept of Digital Shadows to humans. Following future research methodology, three prospections that illustrate use cases for Human Digital Shadows across organizational and hierarchical levels are developed: human-robot collaboration for manual work, decision support and work organization, as well as human resource management. Potentials and challenges are identified using separate SWOT analyses for the three prospections and common themes are emphasized in a concluding discussion. KW - digital shadow KW - cyber physical production system KW - user & usage KW - internet of production Y1 - 2021 U6 - http://dx.doi.org/10.1109/HSI52170.2021.9538729 SP - 1 EP - 8 PB - IEEE ER - TY - CHAP A1 - Grundmann, Jan Thimo A1 - Borella, Laura A1 - Ceriotti, Matteo A1 - Chand, Suditi A1 - Cordero, Federico A1 - Dachwald, Bernd A1 - Fexer, Sebastian A1 - Grimm, Christian D. A1 - Hendrikse, Jeffrey A1 - Herčík, David A1 - Herique, Alain A1 - Hillebrandt, Martin A1 - Ho, Tra-Mi A1 - Kesseler, Lars A1 - Laabs, Martin A1 - Lange, Caroline A1 - Lange, Michael A1 - Lichtenheldt, Roy A1 - McInnes, Colin R. A1 - Moore, Iain A1 - Peloni, Alessandro A1 - Plettenmeier, Dirk A1 - Quantius, Dominik A1 - Seefeldt, Patric A1 - Venditti, Flaviane c. F. A1 - Vergaaij, Merel A1 - Viavattene, Giulia A1 - Virkki, Anne K. A1 - Zander, Martin T1 - More bucks for the bang: new space solutions, impact tourism and one unique science & engineering opportunity at T-6 months and counting T2 - 7th IAA Planetary Defense Conference N2 - For now, the Planetary Defense Conference Exercise 2021's incoming fictitious(!), asteroid, 2021 PDC, seems headed for impact on October 20th, 2021, exactly 6 months after its discovery. Today (April 26th, 2021), the impact probability is 5%, in a steep rise from 1 in 2500 upon discovery six days ago. We all know how these things end. Or do we? Unless somebody kicked off another headline-grabbing media scare or wants to keep civil defense very idle very soon, chances are that it will hit (note: this is an exercise!). Taking stock, it is barely 6 months to impact, a steadily rising likelihood that it will actually happen, and a huge uncertainty of possible impact energies: First estimates range from 1.2 MtTNT to 13 GtTNT, and this is not even the worst-worst case: a 700 m diameter massive NiFe asteroid (covered by a thin veneer of Ryugu-black rubble to match size and brightness), would come in at 70 GtTNT. In down to Earth terms, this could be all between smashing fireworks over some remote area of the globe and a 7.5 km crater downtown somewhere. Considering the deliberate and sedate ways of development of interplanetary missions it seems we can only stand and stare until we know well enough where to tell people to pack up all that can be moved at all and save themselves. But then, it could just as well be a smaller bright rock. The best estimate is 120 m diameter from optical observation alone, by 13% standard albedo. NASA's upcoming DART mission to binary asteroid (65803) Didymos is designed to hit such a small target, its moonlet Dimorphos. The Deep Impact mission's impactor in 2005 successfully guided itself to the brightest spot on comet 9P/Tempel 1, a relatively small feature on the 6 km nucleus. And 'space' has changed: By the end of this decade, one satellite communication network plans to have launched over 11000 satellites at a pace of 60 per launch every other week. This level of series production is comparable in numbers to the most prolific commercial airliners. Launch vehicle production has not simply increased correspondingly – they can be reused, although in a trade for performance. Optical and radio astronomy as well as planetary radar have made great strides in the past decade, and so has the design and production capability for everyday 'high-tech' products. 60 years ago, spaceflight was invented from scratch within two years, and there are recent examples of fast-paced space projects as well as a drive towards 'responsive space'. It seems it is not quite yet time to abandon all hope. We present what could be done and what is too close to call once thinking is shoved out of the box by a clear and present danger, to show where a little more preparedness or routine would come in handy – or become decisive. And if we fail, let's stand and stare safely and well instrumented anywhere on Earth together in the greatest adventure of science. Y1 - 2021 N1 - 7th IAA Planetary Defense Conference, Vienna, Austria, 26-30 April 2021 ER - TY - CHAP A1 - Schoutetens, Frederic A1 - Dachwald, Bernd A1 - Heiligers, Jeannette T1 - Optimisation of photon-sail trajectories in the alpha-centauri system using evolutionary neurocontrol T2 - 8th ICATT (International Conference on Astrodynamics Tools and Techniques) 23 - 25 June 2021, Virtual N2 - With the increased interest for interstellar exploration after the discovery of exoplanets and the proposal by Breakthrough Starshot, this paper investigates the optimisation of photon-sail trajectories in Alpha Centauri. The prime objective is to find the optimal steering strategy for a photonic sail to get captured around one of the stars after a minimum-time transfer from Earth. By extending the idea of the Breakthrough Starshot project with a deceleration phase upon arrival, the mission’s scientific yield will be increased. As a secondary objective, transfer trajectories between the stars and orbit-raising manoeuvres to explore the habitable zones of the stars are investigated. All trajectories are optimised for minimum time of flight using the trajectory optimisation software InTrance. Depending on the sail technology, interstellar travel times of 77.6-18,790 years can be achieved, which presents an average improvement of 30% with respect to previous work. Still, significant technological development is required to reach and be captured in the Alpha-Centauri system in less than a century. Therefore, a fly-through mission arguably remains the only option for a first exploratory mission to Alpha Centauri, but the enticing results obtained in this work provide perspective for future long-residence missions to our closest neighbouring star system. Y1 - 2021 N1 - 8th ICATT (International Conference on Astrodynamics Tools and Techniques) 23 - 25 June 2021, Virtual SP - 1 EP - 15 ER -