TY - CHAP A1 - Srivastava, Alok A1 - Knolle, Friedhart A1 - Hoyler, Friedrich A1 - Scherer, Ulrich W. A1 - Schnug, Ewald T1 - Uranium Toxicity in the State of Punjab in North-Western India T2 - Management of Natural Resources in a Changing Environment N2 - Lately there has been an increasing concern about uranium toxicity in some districts of Punjab State located in the North Western part of India after the publication of a report (Blaurock-Busch et al. 2010) which showed that the concentration of uranium in hair and urine of children suffering from physical deformities, neurological and mental disorder from Malwa region (Fig. 1) of Punjab State was manifold higher than the reference ranges. A train which connects the affected region with the nearby city of Bikaner which has a Cancer Hospital has been nicknamed as Cancer Express due to the frenzy generated on account of uranium related toxicity. Y1 - 2015 SN - 978-3-319-12559-6 U6 - http://dx.doi.org/10.1007/978-3-319-12559-6_21 SP - 271 EP - 275 PB - Springer CY - Cham ER - TY - CHAP A1 - Latzke, Markus A1 - Alexopoulos, Spiros A1 - Kronhardt, Valentina A1 - Rendón, Carlos A1 - Sattler, Johannes, Christoph T1 - Comparison of Potential Sites in China for Erecting a Hybrid Solar Tower Power Plant with Air Receiver T2 - Energy Procedia Y1 - 2015 U6 - http://dx.doi.org/10.1016/j.egypro.2015.03.142 SN - 1876-6102 N1 - International Conference on Concentrating Solar Power and Chemical Energy Systems, SolarPACES 2014, Beijing, China SP - 1327 EP - 1334 ER - TY - CHAP A1 - Tewari, Udit A1 - Neshvad, Surena A1 - Goldbach, Daniel A1 - Sachau, Jürgen T1 - Verification and Implementation of Pseudo-Random-Binary-Sequences for Online Determination of Grid Impedance Spectrum T2 - International Conference on Renewable Energies and Power Quality (ICREPQ´15), La Conuna, Spain, 25th to 27th March, 2015 Y1 - 2015 ER - TY - JOUR A1 - Kürten, Sylvia A1 - Mottaghy, Darius A1 - Ziegler, Martin T1 - Besonderheiten bei der Planung und Berechnung von oberflächennahen thermo-aktiven Bauteilen JF - Geotechnik Y1 - 2015 U6 - http://dx.doi.org/10.1002/gete.201500002 SN - 2190-6653 VL - 38 IS - 2 SP - 107 EP - 119 PB - Wiley CY - Weinheim ER - TY - JOUR A1 - Kürten, Sylvia A1 - Mottaghy, Darius A1 - Ziegler, Martin T1 - Design of plane energy geostructures based on laboratory tests and numerical modelling JF - Energy and Buildings Y1 - 2015 U6 - http://dx.doi.org/10.1016/j.enbuild.2015.08.039 SN - 0378-7788 VL - 107 SP - 434 EP - 444 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Kürten, Sylvia A1 - Mottaghy, Darius A1 - Ziegler, Martin T1 - A new model for the description of the heat transfer for plane thermo-active geotechnical systems based on thermal resistances JF - Acta Geotechnica Y1 - 2015 U6 - http://dx.doi.org/10.1007/s11440-014-0311-6 SN - 1861-1133 VL - 10 IS - 2 SP - 219 EP - 229 PB - Springer CY - Berlin ER - TY - JOUR A1 - Chen, Tao A1 - Clauser, Christoph A1 - Marquart, Gabriele A1 - Willbrand, Karen A1 - Mottaghy, Darius T1 - A new upscaling method for fractured porous media JF - Advances in Water Resources Y1 - 2015 U6 - http://dx.doi.org/10.1016/j.advwatres.2015.03.009 SN - 0309-1708 N1 - Corrigendum 2019: https://doi.org/10.1016/j.advwatres.2019.01.004 VL - 80 SP - 60 EP - 68 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Vogt, C. A1 - Mottaghy, Darius A1 - Rath, V. A1 - Marquart, G. A1 - Dijkshoorn, L. A1 - Wolf, A. A1 - Clauser, C. T1 - Vertical variation in heat flow on the Kola Peninsula: palaeoclimate or fluid flow? JF - Geophysical Journal International N2 - Following earlier studies, we present forward and inverse simulations of heat and fluid transport of the upper crust using a local 3-D model of the Kola area. We provide best estimates for palaeotemperatures and permeabilities, their errors and their dependencies. Our results allow discriminating between the two mentioned processes to a certain extent, partly resolving the non-uniqueness of the problem. We find clear indications for a significant contribution of advective heat transport, which, in turn, imply only slightly lower ground surface temperatures during the last glacial maximum relative to the present value. These findings are consistent with the general background knowledge of (i) the fracture zones and the corresponding fluid movements in the bedrock and (ii) the glacial history of the Kola area. Y1 - 2014 U6 - http://dx.doi.org/10.1093/gji/ggu282 SN - 1365-246X VL - 199 IS - 2 SP - 829 EP - 843 PB - Oxford University Press CY - Oxford ER - TY - JOUR A1 - Rath, V. A1 - Mottaghy, Darius T1 - Klimainformation aus dem Untergrund? JF - Geographische Rundschau Y1 - 2014 SN - 0016-7460 VL - 66 IS - 7-8 SP - 30 EP - 36 PB - Westermann CY - Braunschweig ER - TY - JOUR A1 - Kürten, Sylvia A1 - Mottaghy, Darius A1 - Ziegler, Martin T1 - Planung, Auslegung und Dimensionierung von thermo-aktiven Bauteilen am Beispiel thermo-aktiver Abdichtungselemente JF - Geothermie, Bohr- und Brunnentechnik Y1 - 2014 SP - 18 EP - 20 PB - Ernst & Sohn CY - Berlin ER - TY - CHAP A1 - Ziegler, M. A1 - Schüller, R. A1 - Mottaghy, Darius T1 - Numerical simulation of energy consumption of artificial ground freezing applications subject to water seepage T1 - Simulation numérique de la consummation d´énergie des applications pour la congélation artificielle du sol soumise au flux de l´eau souterraine T2 - Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering, Paris 2013 Y1 - 2013 SP - 2985 EP - 2988 ER - TY - JOUR A1 - Vogt, Christian A1 - Iwanowski-Strahser, Katha A1 - Marquart, Gabriele A1 - Arnold, Juliane A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Gnjezda, Daniel A1 - Clauser, Christoph T1 - Modeling contribution to risk assessment of thermal production power for geothermal reservoirs JF - Renewable Energy Y1 - 2013 U6 - http://dx.doi.org/10.1016/j.renene.2012.11.026 SN - 0960-1481 VL - 53 SP - 230 EP - 241 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Mottaghy, Darius A1 - Schwamborn, G. A1 - Rath, V. T1 - Past climate changes and permafrost depth at the Lake El'gygytgyn site: implications from data and thermal modeling JF - Climate of the Past Y1 - 2013 U6 - http://dx.doi.org/10.5194/cp-9-119-2013 SN - 1814-9332 VL - 9 IS - 1 SP - 119 EP - 133 PB - Copernicus CY - Katlenburg-Lindau ER - TY - JOUR A1 - Kürten, Sylvia A1 - Mottaghy, Darius A1 - Ziegler, Martin T1 - Wärmeübergangswiderstand bei flächigen thermo-aktiven Bauteilen am Beispiel thermo-aktiver Abdichtungselemente JF - Bautechnik Y1 - 2013 U6 - http://dx.doi.org/10.1002/bate.201300035 SN - 1437-0999 VL - 90 IS - 7 SP - 387 EP - 394 PB - Ernst & Sohn CY - Berlin ER - TY - JOUR A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Vogt, Christian T1 - The geothermal project Den Haag: 3D numerical models for temperature prediction and reservoir simulation JF - Geothermics N2 - The proposed Den Haag Zuidwest district heating system of the city of The Hague consists of a deep doublet in a Jurassic sandstone layer that is designed for a production temperature of 75 °C and a reinjection temperature of 40 °C at a flow rate of 150 m3 h−1. The prediction of reservoir temperature and production behavior is crucial for success of the proposed geothermal doublet. This work presents the results of a study of the important geothermal and geohydrological issues for the doublet design. In the first phase of the study, the influences of the three-dimensional (3D) structures of anticlines and synclines on the temperature field were examined. A comprehensive petrophysical investigation was performed to build a large scale 3D-model of the reservoir. Several bottomhole temperatures (BHTs), as well as petrophysical logs were used to calibrate the model using thermal conductivity measurements on 50 samples from boreholes in different lithological units in the study area. Profiles and cross sections extracted from the calculated temperature field were used to study the temperature in the surrounding areas of the planned doublet. In the second phase of the project, a detailed 3D numerical reservoir model was set up, with the aim of predicting the evolution of the producer and injector temperatures, and the extent of the cooled area around the injector. The temperature model from the first phase provided the boundary conditions for the reservoir model. Hydraulic parameters for the target horizons, such as porosity and permeability, were taken from data available from the nearby exploration wells. The simulation results are encouraging as no significant thermal breakthrough is predicted. For the originally planned location of the producer, the extracted water temperature is predicted to be around 79 °C, with an almost negligible cooling in the first 50 years of production. When the producer is located shallower parts of the reservoir, the yield water temperatures is lower, starting at ≈76 °C and decreasing to ≈74 °C after 50 years of operation. This comparatively larger decrease in temperature with time is caused by the structural feature of the reservoir, namely a higher dip causes the cooler water to easily move downward. In view of the poor reservoir data, the reservoir simulation model is constructed to allow iterative updates using data assimilation during planned drilling, testing, and production phases. Measurements during an 8 h pumping test carried out in late 2010 suggest that a flow rate of 150 m3 h−1 is achievable. Fluid temperatures of 76.5 °C were measured, which is very close to the predicted value. Y1 - 2011 U6 - http://dx.doi.org/10.1016/j.geothermics.2011.07.001 SN - 0375-6505 VL - 40 IS - 3 SP - 199 EP - 210 PB - Elsevier CY - Amsterdam ER - TY - CHAP A1 - Mottaghy, Darius A1 - Majorowicz, Jacek A1 - Rath, Volker T1 - Ground Surface Temperature Histories Reconstructed from Boreholes in Poland: Implications for Spatial Variability T2 - The Polish Climate in the European Context: An Historical Overview Y1 - 2009 SN - 978-90-481-3167-9 U6 - http://dx.doi.org/10.1007/978-90-481-3167-9_17 SP - 375 EP - 387 PB - Springer Science+Business Media CY - Dordrecht ER - TY - JOUR A1 - Berg, Milena A1 - Angerer, Anita A1 - Martinelli, Walter A1 - Hammer, Stephan A1 - Mottaghy, Darius T1 - Erkundung des geothermischen Potenzials eines ehemaligen Untertagebergbaus JF - BBR - Fachmagazin für Brunnen- und Leitungsbau Y1 - 2013 VL - 64 IS - 6 SP - 46 EP - 52 ER - TY - JOUR A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Taugs, Renate A1 - Kröger, Jens A1 - Thomsen, Claudia A1 - Hesse, Fabian A1 - Liebsch-Doerschner, Thomas T1 - Erstellung eines geothermischen Modells für Teile Hamburgs und anliegende Gebiete JF - BBR - Fachmagazin für Brunnen- und Leitungsbau Y1 - 2010 SN - 1611-1478 VL - 61 IS - 12 SP - 52 EP - 59 PB - WVGW Wirtschafts- u. Verl.Ges. Gas und Wasser CY - Bonn ER - TY - JOUR A1 - Mottaghy, Darius A1 - Pechnig, Renate T1 - Numerische 3D Modelle zur Temperaturvorhersage und Reservoirsimulationen JF - BBR - Fachmagazin für Brunnen- und Leitungsbau Y1 - 2009 VL - 60 IS - 10 SP - 44 EP - 51 ER - TY - JOUR A1 - Mottaghy, Darius A1 - Vosteen, Hans-Dieter A1 - Schellschmidt, Rüdiger T1 - Temperature dependence of the relationship of thermal diffusivity versus thermal conductivity for crystalline rocks JF - International Journal of Earth Sciences Y1 - 2008 U6 - http://dx.doi.org/10.1007/s00531-007-0238-3 SN - 1437-3262 VL - 97 IS - 2 SP - 435 EP - 442 ER - TY - JOUR A1 - Baier, C. A1 - Mottaghy, Darius A1 - Ziegler, M. A1 - Rath, V. T1 - Numerische Simulation des Gefrierprozesses bei der Baugrundvereisung im durchströmten Untergrund JF - Bauingenieur Y1 - 2008 SN - 0005-6650 VL - 83 IS - 2 SP - 49 EP - 60 ER - TY - JOUR A1 - Rath, V. A1 - Mottaghy, Darius T1 - Smooth inversion for ground surface temperature histories: estimating the optimum regularization parameter by generalized cross-validation JF - Geophysical Journal International Y1 - 2007 U6 - http://dx.doi.org/10.1111/j.1365-246X.2007.03587.x SN - 1365-246X VL - 171 IS - 3 SP - 1440 EP - 1448 ER - TY - JOUR A1 - Vogt, C. A1 - Mottaghy, Darius A1 - Wolf, A. A1 - Rath, V. A1 - Pechnig, R. A1 - Clauser, C. T1 - Reducing temperature uncertainties by stochastic geothermal reservoir modelling JF - Geophysical Journal International N2 - Quantifying and minimizing uncertainty is vital for simulating technically and economically successful geothermal reservoirs. To this end, we apply a stochastic modelling sequence, a Monte Carlo study, based on (i) creating an ensemble of possible realizations of a reservoir model, (ii) forward simulation of fluid flow and heat transport, and (iii) constraining post-processing using observed state variables. To generate the ensemble, we use the stochastic algorithm of Sequential Gaussian Simulation and test its potential fitting rock properties, such as thermal conductivity and permeability, of a synthetic reference model and—performing a corresponding forward simulation—state variables such as temperature. The ensemble yields probability distributions of rock properties and state variables at any location inside the reservoir. In addition, we perform a constraining post-processing in order to minimize the uncertainty of the obtained distributions by conditioning the ensemble to observed state variables, in this case temperature. This constraining post-processing works particularly well on systems dominated by fluid flow. The stochastic modelling sequence is applied to a large, steady-state 3-D heat flow model of a reservoir in The Hague, Netherlands. The spatial thermal conductivity distribution is simulated stochastically based on available logging data. Errors of bottom-hole temperatures provide thresholds for the constraining technique performed afterwards. This reduce the temperature uncertainty for the proposed target location significantly from 25 to 12 K (full distribution width) in a depth of 2300 m. Assuming a Gaussian shape of the temperature distribution, the standard deviation is 1.8 K. To allow a more comprehensive approach to quantify uncertainty, we also implement the stochastic simulation of boundary conditions and demonstrate this for the basal specific heat flow in the reservoir of The Hague. As expected, this results in a larger distribution width and hence, a larger, but more realistic uncertainty estimate. However, applying the constraining post-processing the uncertainty is again reduced to the level of the post-processing without stochastic boundary simulation. Thus, constraining post-processing is a suitable tool for reducing uncertainty estimates by observed state variables. Y1 - 2010 U6 - http://dx.doi.org/10.1111/j.1365-246X.2009.04498.x SN - 1365-246X VL - 181 IS - 1 SP - 321 EP - 333 PB - Oxford University Press CY - Oxford ER - TY - JOUR A1 - Mottaghy, Darius A1 - Rath, Volker T1 - Latent heat effects in subsurface heat transport modelling and their impact on palaeotemperature reconstructions JF - Geophysical Journal International Y1 - 2006 U6 - http://dx.doi.org/10.1111/j.1365-246X.2005.02843.x SN - 1365-246X VL - 164 IS - 1 SP - 236 EP - 245 ER - TY - JOUR A1 - Mottaghy, Darius A1 - Schellschmidt, R. A1 - Popov, Y. A. A1 - Clauser, C. A1 - Kukkonen, I. T. A1 - Nover, G. A1 - Milanovsky, S. A1 - Romushkevich, R. A. T1 - New heat flow data from the immediate vicinity of the Kola super-deep borehole: Vertical variation in heat flow density confirmed and attributed to advection JF - Tectonophysics Y1 - 2005 U6 - http://dx.doi.org/10.1016/j.tecto.2005.03.005 SN - 1879-3266 VL - 401 IS - 1-2 SP - 119 EP - 142 ER - TY - CHAP A1 - Borchert, Jörg T1 - Der Elektrizitätsmarkt in Indonesien und Beteiligungsmöglichkeiten privater Unternehmen T2 - Investitionsführer ASEAN, Indochina, 1997 : Brunei, Indonesien, Kambodscha, Laos, Malaysia, Myanmar, Philippinen, Singapur, Thailand, Vietnam Y1 - 2015 SP - 42 EP - 52 PB - Berliner Bank AG CY - Berlin ET - Stand: Mai 1997 ER - TY - CHAP A1 - Schemm, R. A1 - Lintzel, P. A1 - Borchert, Jörg ED - Zenke, Ines T1 - Typische Elemente des Handelsmarktes T2 - Energiehandel in Europa Y1 - 2015 SN - 3-406-52443-5 SP - 195 EP - 216 PB - Beck CY - München ER - TY - CHAP A1 - Borchert, Jörg A1 - Heimann, Thorsten A1 - Schemm, Ralf T1 - Speicheroptimierung T2 - Gashandel und Gasbeschaffung N2 - In dieser Lektion wurden beginnend mit der Darstellung des fundamentalen Wandels des Gasmarktes die daraus folgenden Implikationen für die Einsatzweise von Gasspeichern abgeleitet. Anschließend wurden zwei Bewertungs- und Steuerungsverfahren für einen Gasspeicher an den beiden Marktstufen Termin- und Spotmarkt methodisch vorgestellt und anhand von Beispielrechnungen illustriert. Das Verfahren zur Bewertung und Steuerung im Terminmarkt stellt ein sehr robustes und methodisch einfaches Verfahren dar. Hierbei wird die Saisonalität der Forwardkurve bzw. deren Veränderungen arbitragefrei mithilfe des Speichers ausgenutzt. Dieses Verfahren kann nicht den gesamten Zeitwert des Speichers ausweisen. Es zieht in jedem Zeitpunkt nur die aktuellen Informationen der Forwardkurve zur Entscheidung heran. Es bildet aber keine bedingte Erwartung über zukünftige Erträge und deren Beeinflussung durch die aktuelle Speicherfahrweise, um hieraus eine optimale Entscheidung zu formulieren. Bei der Bewertung gegenüber dem Spotmarkt mithilfe der Least-Squares-Monte- Carlo-Simulation wird in einer stochastischen Optimierung dagegen der volle Zeitwert des Speichers und damit der gesamte Zusatznutzen der Flexibilität ermittelt. Hierdurch leiten sich auch wesentlich andere Hedging-Empfehlungen als im ersten Verfahren ab, um diesen zu sichern. Der Einsatz der beiden Verfahren im Alltag zur Bewirtschaftung des Speichers hängt insbesondere vom Know-how, den Speicherparametern und der Risikobereitschaft des Handels ab. Beide Strategien liefern hierzu Hedging-Empfehlungen ab, mit welchem der zugrunde liegende Wert gesichert werden kann. Risikoaverse Händler, die einen Großteil des inneren Wertes sichern wollen, könnten im Terminmarkt einen Großteil des Speichers mithilfe des „Intrinsic Rolling“-Verfahrens bewirtschaften. Sie würden hierdurch den saisonalen Spread in der Forwardkurve rollierend sichern. Gleichzeitig kann ein kleinerer Anteil mithilfe der stochastischen Optimierung und den damit verbundenen Ausübungsgrenzen gegenüber dem Spotmarkt bewirtschaftet werden. In einem liquiden vollständigen Markt wird eine Steuerung des Speichers allein gegenüber den vorhandenen Marktstufen vorgenommen und der Wert für alle Marktteilnehmer objektiv messbar. Für den Fall, dass der Markt illiquide ist und hierdurch z. B. eine Kundenlast nicht allein am Termin- und Spotmarkt jederzeit gedeckt werden kann, erscheint es notwendig, den Speicher im Kontext einer Portfoliooptimierung zu bewerten. Dies wird in der nächsten Lektion vorgenommen. Hierbei ist aber zu beachten, dass der Speicher dadurch eine individualisierte Wertkomponente erhält, die von der konkreten Ausgestaltung des jeweiligen Portfolios abhängt. Y1 - 2011 SP - 1 EP - 69 PB - Euroforum Verl. CY - Düsseldorf ER - TY - CHAP A1 - Nabe, C. A1 - Borchert, Jörg ED - Hake, Jürgen-Friedrich T1 - Risikomanagement von EVU in liberalisierten Strommärkten T2 - Liberalisierung des Energiemarktes : Vortragsmanuskripte des 5. Ferienkurses "Energieforschung" vom 27. September - 1. Oktober 1999 im Congrescentrum Rolduc und im Forschungszentrum Jülich Y1 - 1999 SN - 3-89336-248-7 N1 - Schriften des Forschungszentrums Jülich : Reie Energietechnik ; 8 SP - 203 EP - 216 PB - Forschungszentrum CY - Jülich ER - TY - CHAP A1 - Borchert, Jörg ED - Romeike, Frank T1 - Risikomanagement in der Energiewirtschaft : Eine Risikoanalyse der elektrizitätswirtschaftlichen Wertschöpfungskette T2 - Rechtliche Grundlagen des Risikomanagements : Haftungs- und Strafvermeidung für Corporate Complience Y1 - 2008 SN - 978-350-310647-9 SP - 231 EP - 270 PB - Erich Schmidt CY - Berlin ER - TY - CHAP A1 - Borchert, Jörg A1 - Schemm, R. A1 - Lintzel, P. ED - Zenke, Ines T1 - Risiken des Handelsgeschäftes T2 - Energiehandel in Europa Y1 - 2005 SN - 3-406-52443-5 SP - 218 EP - 235 PB - Beck CY - München ER - TY - CHAP A1 - Michels, A. A1 - Borchert, Jörg ED - Zenke, Ines T1 - Beschaffungsstrategien an der Schnittstelle Energiehandel/Vertrieb T2 - Energiehandel in Europa Y1 - 2009 SN - 978-3-406-58373-5 SP - 467 EP - 481 PB - Beck CY - München ET - 2. Aufl. ER - TY - CHAP A1 - Borchert, Jörg A1 - Hintze, D. ED - Zenke, Ines T1 - Der Aufbau von Handelseinheiten T2 - Energiehandel in Europa Y1 - 2009 SN - 978-3-406-58373-5 SP - 393 EP - 410 PB - Beck CY - München ET - 2. Aufl. ER - TY - CHAP A1 - Lintzel, P. A1 - Borchert, Jörg ED - Zenke, Ines T1 - Risiken des Handels T2 - Energiehandel in Europa Y1 - 2009 SN - 978-3-406-58373-5 SP - 239 EP - 247 PB - Beck CY - München ET - 2. Aufl. ER - TY - CHAP A1 - Borchert, Jörg A1 - Michels, A. ED - Zenke, ines T1 - Beschaffungsstrategien an der Schnittstelle Energiehandel / Vertrieb T2 - Energiehandel in Europa Y1 - 2012 SN - 978-3-406-63237-2 SP - 508 EP - 522 PB - Beck CY - München ET - 3. Aufl. ER - TY - CHAP A1 - Borchert, Jörg ED - Zenke, Ines T1 - Aufbau von Handelseinheiten T2 - Energiehandel in Europa Y1 - 2012 SN - 978-3-406-63237-2 SP - 467 EP - 479 PB - Beck CY - München ET - 3. Aufl. ER - TY - CHAP A1 - Borchert, Jörg A1 - Lintzel, P. ED - Zenke, Ines T1 - Risiken des Handels T2 - Energiehandel in Europa Y1 - 2012 SN - 978-3-9813142-9-8 SP - 303 EP - 312 PB - Beck CY - München ET - 3. Aufl. ER - TY - CHAP A1 - Borchert, Jörg A1 - Bremen, Frank T1 - Geschäfts- und Organisationsmodelle für ein Strom- und Gas-Portfoliomanagement T2 - Optimierte Strom- und Gasbeschaffung in der Energiewirtschaftsbranche Y1 - 2014 SN - 978-3-9813142-9-8 SP - 11 EP - 28 PB - KS-Energy-Verl. CY - Berlin ER - TY - JOUR A1 - Walter, G. A1 - Borchert, Jörg T1 - Der Einsatz von Realoptionen in der Elektrizitätswirtschaft JF - M & A Review Y1 - 2002 SN - 1616-0878 IS - 4 SP - 198 ER - TY - JOUR A1 - Jungbluth, Christian A1 - Borchert, Jörg T1 - Möglichkeiten der Strompreisbeeinflussung im oligopolistischen Markt JF - ZNER Zeitschrift für Neues Energierecht Y1 - 2008 IS - 4 SP - 314 EP - 323 ER - TY - JOUR A1 - Borchert, Jörg A1 - Schemm, R. T1 - Einsatz der Portfoliotheorie im Asset Allokations-Prozess am Beispiel eines fiktiven Anlageraumes von Windkraftstandorten JF - Zeitschrift für Energiewirtschaft Y1 - 2007 SN - 0343-5377 VL - 31 IS - 4 SP - 311 ER - TY - JOUR A1 - Borchert, Jörg A1 - Hasenbeck, Marc T1 - Bewertung und Steuerung von Kraftwerksscheiben JF - Zeitschrift für Energiewirtschaft Y1 - 2009 U6 - http://dx.doi.org/10.1007/s12398-009-0014-0 SN - 1866-2765 VL - 33 IS - 2 SP - 115 EP - 126 PB - Vieweg CY - Wiesbaden ER - TY - JOUR A1 - Borchert, Jörg A1 - Hasenbeck, Marc A1 - Jungbluth, Christian A1 - Schemm, Ralf T1 - Bewertung und Steuerung von Gasspeichern bzw. Gasspeicherscheiben JF - Zeitschrift für Energiewirtschaft N2 - In diesem Artikel werden zunächst einleitend der Gasmarkt Deutschland und der sich daraus ergebende Speicherbedarf skizziert. Folgend wird auf verschiedene Speichernutzen aus betriebswirtschaftlicher Perspektive eingegangen und die in diesem Artikel vorgestellten Bewertungsverfahren einleitend beschrieben. In diesem Artikel werden stochastische Optimierungsmethoden aufgegriffen, die sowohl eine Bewertung der Speicher gegenüber einem Spotpreis, als auch gegenüber einer gesamten Forwardcurve ermöglichen. Hierzu werden zunächst Modelle zur Beschreibung der Marktpreise vorgestellt und anhand empirischer Daten kalibriert. Dann wird eine beispielhafte Speicherscheibe zunächst auf Basis der LeastSquareMonteCarloTechnik gegenüber dem stochastischen mehrfaktoriellen Spotpreismodell bewertet. Hieran schließt sich die Vorstellung der Bewertung sowie des Hedgings gegenüber der Forwardcurve an. Abschließend erfolgt eine vergleichende Gegenüberstellung beider Verfahren. Y1 - 2009 U6 - http://dx.doi.org/10.1007/s12398-009-0033-x SN - 1866-2765 VL - 33 IS - 4 SP - 279 EP - 293 PB - Springer CY - Berlin ER - TY - THES A1 - Borchert, Jörg T1 - Analyse von Determinanten der Großhandelspreise für Elektrizität anhand einer Systemstudie des deutschen Marktes Y1 - 2003 N1 - Berlin, Techn. Univ., Diss., 2003 ER - TY - BOOK A1 - Borchert, Jörg A1 - Schemm, Ralf A1 - Korth, Swen T1 - Stromhandel: Institutionen, Marktmodelle, Pricing und Risikomanagement Y1 - 2006 SN - 978-3-7910-2542-1 PB - Schäffer-Poeschel CY - Stuttgart ER - TY - JOUR A1 - Jildeh, Zaid B. A1 - Wagner, Torsten A1 - Schöning, Michael Josef A1 - Pieper, Martin T1 - Simulating the electromagnetic‐thermal treatment of thin aluminium layers for adhesion improvement JF - Physica status solidi (a) N2 - A composite layer material used in packaging industry is made from joining layers of different materials using an adhesive. An important processing step in the production of aluminium-containing composites is the surface treatment and consequent coating of adhesive material on the aluminium surface. To increase adhesion strength between aluminium layer and the adhesive material, the foil is heat treated. For efficient heating, induction heating was considered as state-of-the-art treatment process. Due to the complexity of the heating process and the unpredictable nature of the heating source, the control of the process is not yet optimised. In this work, a finite element analysis of the process was established and various process parameters were studied. The process was simplified and modelled in 3D. The numerical model contains an air domain, an aluminium layer and a copper coil fitted with a magnetic field concentrating material. The effect of changing the speed of the aluminium foil (or rolling speed) was studied with the change of the coil current. Statistical analysis was used for generating a general control equation of coil current with changing rolling speed. Y1 - 2015 U6 - http://dx.doi.org/10.1002/pssa.201431893 SN - 1862-6319 VL - Vol. 212 IS - 6 SP - 1234 EP - 1241 PB - Wiley CY - Weinheim ER - TY - CHAP A1 - Goldbach, Daniel ED - Wahl, Michael T1 - Diagnosemaßnahmen im Umfeld der Funktionalen Sicherheit T2 - AmE 2014 - Automotive meets electronics [Elektronische Ressource] : Beiträge der 5. GMM-Fachtagung vom 18. bis 19. Februar 2014 in Dortmund / Veranst.: VDE/VDI-Gesellschaft Mikroelektronik, Mikrosystem- und Feinwerktechnik (GMM) Y1 - 2014 SN - 978-3-8007-3580-8 N1 - GMM-Fachbericht ; 78 SP - 172 EP - 179 PB - VDE-Verl. CY - Berlin ER - TY - CHAP A1 - Kern, Alexander A1 - Braun, Christian T1 - Risk management according to IEC 62305-2 edition 2: 2010–12 assessment of structures with a risk of explosion T2 - 2014 International Conference on Lightning Protection (ICLP), Shanghai, China N2 - Risk management for structures with a risk of explosion should be considered very carefully when performing a risk analysis according to IEC 62305-2. In contrast to the 2006 edition of the standard, the 2010 edition describes the topic “Structures with a risk of explosion” in more detail. Moreover, in Germany separate procedures and parameters are defined for the risk analysis of structures with a risk of explosion (Supplement 3 of the German DIN EN 62305-2 standard). This paper describes the contents and the relevant calculations of this Supplement 3, together with a numerical example. Y1 - 2014 SP - 1237 EP - 1242 ER - TY - CHAP A1 - Rousseau, Alain A1 - Kern, Alexander T1 - How to deal with environmental risk in IEC 62305-2 T2 - 2014 International Conference on Lightning Protection (ICLP), Shanghai, China N2 - The 2nd edition of the lightning risk management standard (IEC 62305-2) considers structures, which may endanger environment. In these cases, the loss is not limited to the structure itself, which is valid for usual structures. In the past (Edition 1) this danger was simply taken into account by a special hazard factor, multiplying the existing risk for the structure with a number. Now, in the edition 2, we add to the risk for the structure itself a “second risk” due to the losses outside the structure. The losses outside can be treated independently from what occurs inside. This is a major advantage to analyze the risk for sensitive structures, like chemical plants, nuclear plants, or structures containing explosives, etc. In this paper, the existing procedure given by the European version EN 62305-2 Ed.2 is further developed and applied to a few structures. Y1 - 2014 SP - 521 EP - 527 ER - TY - CHAP A1 - Hellmanns, Mark A1 - Fischer, F. A1 - Dilger, K. A1 - Wittor, B. A1 - Hildebrand, J. A1 - Werner, F. T1 - Applikation und Einsatz von faserverstärkten Klebstoffen im Bauwesen abgeschlossenes IGF-Projekt Nr. 16956 B (DVS 08.072, Laufzeit 01.02.2011 - 31.01.2013) T2 - Tagungsband / 14. Kolloquium Gemeinsame Forschung in der Klebtechnik : 18. und 19. Februar 2014, DECHEMA-Haus, Frankfurt am Main Y1 - 2014 SP - 26 EP - 27 ER -