TY - CHAP A1 - Teixeira Boura, Cristiano José A1 - Eckstein, J. A1 - Felinks, J. A1 - Göttsche, Joachim A1 - Hoffschmidt, Bernhard A1 - Schmitz, S. T1 - 3-D CFD simulation of an air-sand heat exchanger T2 - SolarPACES 2011 : concentrating solar power and chemical energy systems : 20 - 23 September, 2011, Granada, Spain Y1 - 2011 CY - Granada ER - TY - CHAP A1 - Park, Jin A1 - El-Daib, Khaled A1 - Butenweg, Christoph A1 - Gellert, Christoph T1 - A novel macroelement approach for masonry walls T2 - Proceedings of the 8th International Conference on Structural Dynamics, EURODYN 2011 : Leuven, Belgium, 4 - 6 July 2011 / Katholieke Universiteit Leuven, ... G. De Roeck ... (eds) Y1 - 2011 SN - 978-90-76019-31-4 SP - 3281 EP - 3286 PB - K. U. Leuven, Dep. of Civil Engineering CY - Leuven ER - TY - CHAP A1 - Damm, Sebastian A1 - Ritz, Thomas A1 - Strauch, Jakob T1 - Adaption of archetype patterns for mobile cloud-based business apps T2 - 2011 IEEE International Conference on Pervasive Computing and Communications workshops (PerCom workshops 2011) : Seattle, Washington, USA, 21 - 25 March 2011 Y1 - 2011 SN - 978-1-61284-938-6 (Print) SN - 978-1-61284-936-2 (E-Book) U6 - https://doi.org/10.1109/PERCOMW.2011.5766849 SP - 100 EP - 105 PB - IEEE Service Center CY - Piscataway, NJ ER - TY - CHAP A1 - Siekmann, Thomas A1 - Müller, Karsten T1 - Adaptive potential of the stormwater management in urban areas faced by the climate change T2 - 12th International Conference on Urban Drainage, Porto Alegre/Brazil, 11-16 September 2011 Y1 - 2011 ER - TY - CHAP A1 - Baumann, Torsten A1 - Teixeira Boura, Cristiano José A1 - Göttsche, Joachim A1 - Hoffschmidt, Bernhard A1 - Schmitz, Stefan A1 - Zunft, Stefan T1 - Air-sand heat exchanger: materials and flow properties T2 - SolarPACES 2011 : concentrating solar power and chemical energy systems : 20 - 23 September, 2011, Granada, Spain Y1 - 2011 CY - Granada ER - TY - CHAP A1 - Pfaff, Raphael A1 - Larkowski, Tomasz A1 - Burnham, Keith J. T1 - An application of adaptive control in the behavioural framework T2 - 21st International Conference on Systems Engineering (ICSEng) : 16 - 18 Aug. 2011, Las Vegas, Nevada ; proceedings Y1 - 2011 SN - 978-1-4577-1078-0 ; 978-0-7695-4495-3 SP - 49 EP - 54 PB - IEEE CY - Piscataway, NJ ER - TY - CHAP A1 - Becker, Jörg A1 - Bergener, Philipp A1 - Breuker, Dominic A1 - Delfmann, Patrick A1 - Eggert, Mathias T1 - An Efficient Business Process Compliance Checking Approach T2 - Governance and Sustainability in Information Systems. Managing the Transfer and Diffusion of IT : IFIP WG 8.6 International Working Conference, Hamburg, Germany, September 22-24, 2011. Proceedings Y1 - 2011 U6 - https://doi.org/10.1007/978-3-642-24148-2_19 SP - 282 EP - 287 PB - Springer CY - Berlin, Heidelberg ER - TY - CHAP A1 - Loeb, Horst W. A1 - Schartner, Karl-Heinz A1 - Dachwald, Bernd A1 - Ohndorf, Andreas A1 - Seboldt, Wolfgang T1 - An Interstellar – Heliopause mission using a combination of solar/radioisotope electric propulsion T2 - Presented at the 32nd International Electric Propulsion Conference N2 - There is common agreement within the scientific community that in order to understand our local galactic environment it will be necessary to send a spacecraft into the region beyond the solar wind termination shock. Considering distances of 200 AU for a new mission, one needs a spacecraft travelling at a speed of close to 10 AU/yr in order to keep the mission duration in the range of less than 25 yrs, a transfer time postulated by ESA.Two propulsion options for the mission have been proposed and discussed so far: the solar sail propulsion and the ballistic/radioisotope electric propulsion. As a further alternative, we here investigate a combination of solar-electric propulsion and radioisotope-electric propulsion. The solar-electric propulsion stage consists of six 22 cm diameter “RIT-22”ion thrusters working with a high specific impulse of 7377 s corresponding to a positive grid voltage of 5 kV. Solar power of 53 kW BOM is provided by a light-weight solar array. The REP-stage consists of four space-proven 10 cm diameter “RIT-10” ion thrusters that will be operating one after the other for 9 yrs in total. Four advanced radioisotope generators provide 648 W at BOM. The scientific instrument package is oriented at earlier studies. For its mass and electric power requirement 35 kg and 35 W are assessed, respectively. Optimized trajectory calculations, treated in a separate contribution, are based on our “InTrance” method.The program yields a burn out of the REP stage in a distance of 79.6 AU for a usage of 154 kg of Xe propellant. With a C3 = 45,1 (km/s)2 a heliocentric probe velocity of 10 AU/yr is reached at this distance, provided a close Jupiter gravity assist adds a velocity increment of 2.7 AU/yr. A transfer time of 23.8 yrs results for this scenario requiring about 450 kg Xe for the SEP stage, jettisoned at 3 AU. We interpret the SEP/REP propulsion as a competing alternative to solar sail and ballistic/REP propulsion. Omiting a Jupiter fly-by even allows more launch flexibility, leaving the mission duration in the range of the ESA specification. Y1 - 2011 N1 - 32nd International Electric Propulsion Conference, 11-15 September. Wiesbaden, Germany SP - 1 EP - 7 ER - TY - CHAP A1 - Stieglitz, Kristian A1 - Wollert, Jörg T1 - Approach of using ultra-wideband-radio in industrial real-time ethernet networks T2 - The 4th International Multi-Conference on Engineering and Technological Innovation : IMETI : July 19th - July 22nd, 2011, Orlando, Florida, USA Y1 - 2011 SP - 1 EP - 6 ER - TY - CHAP A1 - Fuchs, Britta A1 - Ritz, Thomas A1 - Halbach, Bastian A1 - Hartl, Florian ED - Marca, David A. T1 - Blended shopping : interactivity and individualization T2 - Proceedings of the International Conference on e-Business : Seville, Spain, 18 - 21 July 2011 ; [... integrated in the ICETE (International Conference on e-Business and Telecommunications) joint conference] Y1 - 2011 SN - 978-989-8425-70-6 SP - 47 EP - 52 PB - SciTePress CY - [Lissabon] ER -