TY - CHAP A1 - Duran Paredes, Ludwin A1 - Mottaghy, Darius A1 - Herrmann, Ulf A1 - Groß, Rolf Fritz T1 - Online ground temperature and soil moisture monitoring of a shallow geothermal system with non-conventional components T2 - EGU General Assembly 2020 N2 - We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation. Y1 - 2020 N1 - Online 4–8 May 2020 [Session ERE2.8] EGU2020-19052 ER - TY - CHAP A1 - Sattler, Johannes, Christoph A1 - Caminos, Ricardo Alexander Chico A1 - Ürlings, Nicolas A1 - Dutta, Siddharth A1 - Ruiz, Victor A1 - Kalogirou, Soteris A1 - Ktistis, Panayiotis A1 - Agathokleous, Rafaela A1 - Jung, Christian A1 - Alexopoulos, Spiros A1 - Atti, Vikrama Nagababu A1 - Teixeira Boura, Cristiano José A1 - Herrmann, Ulf T1 - Operational experience and behaviour of a parabolic trough collector system with concrete thermal energy storage for process steam generation in Cyprus T2 - AIP Conference Proceedings Y1 - 2020 U6 - http://dx.doi.org/10.1063/5.0029278 IS - 2303 SP - 140004-1 EP - 140004-10 ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - http://dx.doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Hoffschmidt, Bernhard A1 - Telle, R. A1 - Sauerborn, Markus A1 - Wagner, M. T1 - Optical measurement system for high temperature absorbers T2 - SolarPACES 2011 : concentrating solar power and chemical energy systems : 20 - 23 September, 2011, Granada, Spain Y1 - 2011 CY - Granada ER - TY - CHAP A1 - Alexopoulos, Spiros A1 - Breitbach, Gerd A1 - Hoffschmidt, Bernhard T1 - Optimization of the channel form geometry of porous ReSiC ceramic membrane modules T2 - Proceedings / International Conference & Exhibition for Filtration and Separation Technology, FILTECH 2009 : October 13 - 15, 2009, Wiesbaden, Germany. Vol. 2 Y1 - 2009 SN - 978-3-941655-36-2 SP - 686 EP - 693 PB - Filtech Exhibitions Germany CY - Meerbusch ER - TY - CHAP A1 - Kelly, Bruce A1 - Herrmann, Ulf A1 - Hale, M.-J. T1 - Optimization Studies for Integrated Solar Combined Cycle Systems T2 - Solar engineering 2001 : proceedings of the International Solar Energy Conference ; presented at the 2001 International Solar Energy Conference, a part of Forum 2001 - Solar energy: the power to choose, April 21 - 25, 2001, Washington, D.C. Y1 - 2001 SN - 0-7918-1670-2 N1 - International Solar Energy Conference SP - 393 EP - 398 PB - ASME CY - New York, NY ER - TY - CHAP A1 - Gall, J. A1 - Abel, D. A1 - Ahlbrink, N. A1 - Andersson, J. A1 - Diehl, M. A1 - Pitz-Paal, R. A1 - Schmitz, M. A1 - Teixeira Boura, Cristiano José T1 - Optimized control of hot-gas cycle for solar thermal power plants T2 - Proceedings of the 7th International Modelica Conference : Como, Italy, 20-22 September 2009 / Francesco Casella, ed. Y1 - 2009 SN - 978-91-7393-513-5 SP - 490 EP - 495 PB - The Modelica Association ER - TY - CHAP A1 - Anthrakidis, Anette A1 - Herrmann, Ulf A1 - Mirza, M. F. A1 - Schorn, Christian A1 - Schwarzer, Klemens A1 - Wedding, Philipp A1 - Weis, Fabian T1 - Parabolrinnenentwicklung und Qualifizierung am Solar-Institut Jülich T2 - Thermische Solarenergie : 24. Symposium ; 7. bis 9. Mai 2014, Kloster Banz, Bad Staffelstein Y1 - 2014 SN - 978-3-943891-35-5 SP - 242 EP - 243 PB - OTTI CY - Regensburg ER - TY - CHAP A1 - Backes, Klaus A1 - Faber, Christian A1 - Hafner, Bernd A1 - Schwarzer, Klemens T1 - Parameteridentifikation an thermischen Speichern T2 - 8. Symposium Thermische Solarenergie : Ort: Bildungszentrum der Hanns-Seidel-Stiftung, Kloster Banz, Staffelstein. Termin: 13. - 15. Mai 1998 / OTTI, Technologie-Kolleg Y1 - 1998 SP - 293 EP - 297 PB - OTTI CY - Regensburg ER - TY - CHAP A1 - Warerkar, S. A1 - Schmitz, S. A1 - Göttsche, Joachim A1 - Hoffschmidt, Bernhard A1 - Tamme, R. T1 - Performance analysis of an air-sand heat exchanger prototype for high-temperature storage T2 - EuroSun 2008 : 1st International Conference on Solar Heating, Cooling and Buildings ; 7th - 10th October 2008, Lisbon, Portugal : key lectures / ISES, International Solar Energy Society. Vol. 1 Y1 - 2008 SN - 978-1-61782-228-5 SP - 2215 EP - 2222 PB - Sociedade Portuguesa De Energia Solar (SPES) CY - Lissabon ER -