TY - CHAP A1 - Kraft, Bodo T1 - Conceptual design tools for civil engineering N2 - Applications of Graph Transformations with Industrial Relevance Lecture Notes in Computer Science, 2004, Volume 3062/2004, 434-439, DOI: http://dx.doi.org/10.1007/978-3-540-25959-6_33 This paper gives a brief overview of the tools we have developed to support conceptual design in civil engineering. Based on the UPGRADE framework, two applications, one for the knowledge engineer and another for architects allow to store domain specific knowledge and to use this knowledge during conceptual design. Consistency analyses check the design against the defined knowledge and inform the architect if rules are violated. KW - CAD KW - CAD KW - Bauingenieurwesen KW - CAD KW - civil engineering Y1 - 2004 ER - TY - CHAP A1 - Kraft, Bodo A1 - Nagl, Manfred T1 - Parameterized specification of conceptual design tools in civil engineering N2 - Applications of Graph Transformations with Industrial Relevance Lecture Notes in Computer Science, 2004, Volume 3062/2004, 90-105, DOI: 10.1007/978-3-540-25959-6_7 In this paper we discuss how tools for conceptual design in civil engineering can be developed using graph transformation specifications. These tools consist of three parts: (a) for elaborating specific conceptual knowledge (knowledge engineer), (b) for working out conceptual design results (architect), and (c) automatic consistency analyses which guarantee that design results are consistent with the underlying specific conceptual knowledge. For the realization of such tools we use a machinery based on graph transformations. In a traditional PROGRES tool specification the conceptual knowledge for a class of buildings is hard-wired within the specification. This is not appropriate for the experimentation platform approach we present in this paper, as objects and relations for conceptual knowledge are due to many changes, implied by evaluation of their use and corresponding improvements. Therefore, we introduce a parametric specification method with the following characteristics: (1) The underlying specific knowledge for a class of buildings is not fixed. Instead, it is built up as a data base by using the knowledge tools. (2) The specification for the architect tools also does not incorporate specific conceptual knowledge. (3) An incremental checker guarantees whether a design result is consistent with the current state of the underlying conceptual knowledge (data base). KW - CAD KW - CAD KW - Bauingenieurwesen KW - CAD KW - civil engineering Y1 - 2004 ER - TY - CHAP A1 - Kraft, Bodo A1 - Nagl, Manfred T1 - Support of Conceptual Design in Civil Engineering by Graph-based Tools N2 - WS GTaD-2003 - The 1st Workshop on Graph Transformations and Design ed Grabska, E., Seite 6-7, Jagiellonian University Krakow. 2 pages KW - CAD KW - CAD KW - Bauingenieurwesen KW - CAD KW - civil engineering Y1 - 2003 ER - TY - CHAP A1 - Kraft, Bodo A1 - Meyer, Oliver A1 - Nagl, Manfred T1 - Graph technology support for conceptual design in civil engineering N2 - In: Advances in intelligent computing in engineering : proceedings of the 9.International EG-ICE Workshop ; Darmstadt, (01 - 03 August) 2002 / Martina Schnellenbach-Held ... (eds.) . - Düsseldorf: VDI-Verl., 2002 .- Fortschritt-Berichte VDI, Reihe 4, Bauingenieurwesen ; 180 ; S. 1-35 The paper describes a novel way to support conceptual design in civil engineering. The designer uses semantical tools guaranteeing certain internal structures of the design result but also the fulfillment of various constraints. Two different approaches and corresponding tools are discussed: (a) Visually specified tools with automatic code generation to determine a design structure as well as fixing various constraints a design has to obey. These tools are also valuable for design knowledge specialist. (b) Extensions of existing CAD tools to provide semantical knowledge to be used by an architect. It is sketched how these different tools can be combined in the future. The main part of the paper discusses the concepts and realization of two prototypes following the two above approaches. The paper especially discusses that specific graphs and the specification of their structure are useful for both tool realization projects. KW - CAD KW - CAD ; KW - CAD KW - civil engineering Y1 - 2002 SN - 3-18-318004-9 ER - TY - CHAP A1 - Fredebeul-Krein, Markus T1 - Encouraging competition and investment into next generation access networks: The case of long term risk sharing contracts N2 - Working paper distributed at 2nd Annual Next Generation Telecommunications Conference 2009, 13th – 14th October 2009, Brussels 14 pages Abstract Governments all over Europe are in the process of adopting new broadband strategies. The objective is to create modern telecommunications networks based on powerful broadband infrastructures". In doing so, they aim for innovative and investment-friendly concepts. For instance, in a recently published consultation paper on the subject the German regulator BNetzA declared that it will take “greater account of … reducing risks, securing the investment and innovation power, providing planning certainty and transparency – in order to support and advance broadband rollout in Germany”. It further states that when regulating wholesale rates it has to be ensured that “… adequate incentives for network rollout are provided on the one hand, while sustainable and fair competition is ensured on the other”. Also an EC draft recommendation on regulated network access is about to set new standards for the regulation of next generation access networks. According to the recommendation the prices of new assets shall be based on costs plus a projectspecific risk premium to be included in the costs of capital for the investment risk incurred by the operator. This approach has been criticised from various sides. In particular it has been questioned whether such an approach is adequate to meet the objectives of encouraging both competition and investment into next generation access networks. Against this background, the concept of “long term risk sharing contracts” has been proposed recently as an approach which does not only incorporate the various additional risks involved in the deployment of NGA infrastructure, but has several other advantages. This paper will demonstrate that the concept allows for competition to evolve at both the retail and wholesale level on fair, objective, non-discriminatory and transparent terms and conditions. Moreover, it ensures the highest possible investment incentive in line with socially desirable outcome. The paper is organised as follows: The next section will briefly outline the importance of encouraging competition and investment in an NGA-environment. The third section will specify the design of long term risk sharing contracts in view of achieving these objectives. The fourth section will examine potential problems associated with the concept. In doing so a way of how to deal with them will be elaborated. The last section will look at arguments against long term risk sharing contracts. It will be shown that these arguments are not strong enough to build a case against introducing such contracts. KW - Electronic Commerce KW - Breitband Markt KW - Regulierung KW - Internet KW - Bundesnetzagentur KW - broadband market KW - regulation KW - Internet KW - next generation access networks KW - risk sharing Y1 - 2009 ER - TY - CHAP A1 - Groebel, Simone A1 - Kowollik, Silvia A1 - Crummenerl, Silvia A1 - Schöning, Michael Josef T1 - 2. Graduiertentagung : 5. November 2009 / [Hrsg.: S. Groebel ; S. Kowollik ; S. Crummenerl ; M. J. Schöning] T1 - 2nd Graduate Symposium N2 - Tagungsband der Graduiertentagung der FH Aachen, in dem Doktorandinnen und Doktoranden und ihre Forschungsbereiche vorgestellt werden T3 - Graduiertentagung / FH Aachen - 2 KW - Aachen / Fachhochschule Aachen ; Graduierter ; Promotionsstudium KW - Graduiertentagung KW - Graduate symposium Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:hbz:a96-opus-3131 ER - TY - CHAP A1 - Roderburg, Katharina A1 - Schöning, Michael Josef T1 - 1. Graduierten-Tagung : 9. September 2008 / [Hrsg.: K. Roderburg ; M. J. Schöning] T1 - 1st Graduate Symposium N2 - Tagungsband der Graduiertentagung der FH Aachen, in dem Doktorandinnen und Doktoranden und ihre Forschungsbereiche vorgestellt werden T3 - Graduiertentagung / FH Aachen - 1 KW - Aachen / Fachhochschule Aachen KW - Graduierter KW - Promotionsstudium KW - Graduiertentagung KW - Graduate symposium Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:hbz:a96-opus-3125 ER - TY - CHAP A1 - Schöning, Michael Josef A1 - Abdelghani, Adnane T1 - Advancements in Nanotechnology and Microelectronics (ANM '09) <2009, Tunisia>: Proceedings book ; Tunisia, November, 13 & 14, 2009 / Humboldt Kolleg. Ed. by Michael J. Schöning ; Adnane Abdelghani N2 - The ANM’09 multi-disciplinary scientific program includes topics in the fields of "Nanotechnology and Microelectronics" ranging from "Bio/Micro/Nano Materials and Interfacing" aspects, "Chemical and Bio-Sensors", "Magnetic and Superconducting Devices", "MEMS and Microfluidics" over "Theoretical Aspects, Methods and Modelling" up to the important bridging "Academics meet Industry". KW - Nanopartikel KW - Biosensor KW - Supraleiter KW - MEMS KW - Biophoton KW - Nanotechnology ; Microelectronics ; Biosensors ; Superconductor ; MEMS Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:hbz:a96-opus-3113 ER - TY - CHAP A1 - Behrens, Jörg A1 - Frentzel, Ralf A1 - Kern, Alexander T1 - Simulation der transienten Spannungsverläufe im Eigenbedarfsnetz eines Großkraftwerks bei einem kraftwerksnahen Blitzeinschlag in die Hochspannungs-Freileitung T1 - Simulation of transient voltage curve of a house-load operation net-work of large power plant by a lightning strike in a high-voltage over-head line closed to the power plant N2 - 8. VDE/ABB-Blitzschutztagung, 29. - 30. Oktober 2009 in Neu-Ulm. Blitzschutztagung <8, 2009, Neu-Ulm> Berlin : VDE Verl. 2009 Großkraftwerke können durch Blitzentladungen mit potentiellen Auswirkungen auf deren Verfügbarkeit und Sicherheit gefährdet werden. Ein sehr spezielles Szenario, welches aus aktuellem Anlass zu untersuchen war, betrifft den kraftwerksnahen Blitzeinschlag in die Hochspannungs-Freileitung am Netzanschluss der Anlage. Wird nun noch ein sogenannter Schirmfehler unterstellt, d.h. der direkte Blitzeinschlag erfolgt in ein Leiterseil des Hoch- bzw. Höchstspannungsnetzes und nicht in das darüber gespannte Erdseil, so bedeutet dies eine extreme elektromagnetische Einwirkung. Der vorliegende Beitrag befasst sich mit der Simulation eines solchen Blitzeinschlages und dessen Auswirkungen auf den Netzanschluss und die Komponenten der elektrischen Eigenbedarfsanlagen eines Kraftwerks auf den unterlagerten Spannungsebenen. Die dabei gewonnenen Erkenntnisse lassen sich ohne Einschränkungen auf Industrieanlagen mit Mittelspannungs-Netzanschluss und ohne eigener Stromversorgung übertragen. N2 - Lightning discharge can endanger large power plants with potential influence on their availability and reliability. A very special scenario, which was currently to analyse, is the lightning strike close to the high-voltage overhead line at the grid of the power plant. Supposing a failure of shielding and that the lightning strike goes directly into the line then the elec-tromagnetic effect is extremely high. The following article gives attention to the simulation of lightning strike and their effects to the connection with the grid and the components of the house-load operation of a large power plant especially to the lower voltage level sections. These results are transferable to industrial plants which have no own power supply. KW - Blitzschutz KW - Blitzeinschlag KW - lightning strike Y1 - 2009 SN - 978-3-8007-3197-8 ER - TY - CHAP A1 - Kern, Alexander A1 - Beierl, Ottmar A1 - Zischank, Wolfgang T1 - Calculation of the separation distance according to IEC 62305-3: 2006-10 - Remarks for the application and simplified methods N2 - [Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate. KW - Blitzschutz KW - Lightning protection Y1 - 2009 N1 - Paper in: [10. International Symposium on Lightning Protection 9. 13. November 2009, Curitiba, Brasilien. 6 Seiten] ER - TY - CHAP A1 - Ballmann, J. A1 - Raatschen, Hans-Jürgen A1 - Staat, Manfred T1 - High stress intensities in focussing zones of waves N2 - The propagation of mechanical waves in plates of isotropic elastic material is investigated. After a short introduction to the understanding of focussing of stress waves in a plate with a curved boundary the method of characteristics is applied to a plate of hyperelastic material. Using this method the propagation of acceleration waves is discussed. Based on this a numerical difference scheme is developed for solving initial-boundary-value problems and applied to two examples: propagation of a point disturbance in a homogeneously finitely strained non-linear elastic plate and geometrical focussing in al linear elastic plate. KW - Technische Mechanik KW - Wellen KW - mechanical waves Y1 - 1985 U6 - http://dx.doi.org/10.1016/B978-0-444-42520-1.50015-3 ER - TY - CHAP A1 - Kern, Alexander A1 - Dikta, Gerhard T1 - Probability of damage of electrical and electronic systems due to indirect lightning flashes - investigation of data from German insurance companies N2 - In the presented paper data collected from the field related to damage statistics of electrical and electronic apparatus in household are reported and investigated. These damages (total number approx. 74000 cases), registered by five German insurance companies in 2005 and 2006, were adviced by customers as caused by lightning overvoltages. With the use of stochastical methods it is possible, to reasses the collected data and to distinguish between cases, which are with high probability caused by lightning overvoltages, and those, which are not. If there was an indication for a direct strike, this case was excluded, so the focus was only on indirect lightning flashes, i.e. only flashes to ground near the structure and flashes to or nearby an incoming service line were investigated. The data from the field contain the location of damaged apparatus (residence of the policy holder) and the distances of the nearest cloud-to-ground stroke to the location of the damage registered by the German lightning location network BLIDS at the date of damage. The statistical data along with some complementary numerical simulations allow to verify the correspondence of the Standards rules used for IEC 62305-2 with the field data and to define some correction needs. The results could lead to a better understanding whether a damage reported to an insurance company is really caused by indirect lightning, or not. KW - Blitzschutz KW - lightning flash Y1 - 2009 ER - TY - CHAP T1 - Alfha.net / Sektion Bauingenieurwesen: 2. [Zweiter] Erfahrungsaustausch am Fachbereich Bauingenieurwesen : Absolventen berichten aus der Praxis N2 - Inhaltsverzeichnis: Kettern, Jürgen : Grußwort des Dekans Kleiker, Walter : Grußwort des Sektionsleiters Bau des alpha.net Wijnhoven, Ralf : Bauausführung von 14 Brunnenanlagen und 4 km Rohrleitung zur Regelung des Grundwasserstandes und der Vorflut in Voerde-Mehrum. S. 10-11 Ruwisch, Thomas : Spurplanänderung im Bahnhof Düsseldorf-Gerresheim : Wusch, Planung, Planrecht und die Umwelt. S. 12-13. Rickes, Tanja : Bauablaufsteuerung einer Linienbaustelle am Beispiel des Fahrbahnbaus der "HSL-Zuid". S. 14-15. Plum, Andreas : Brandschutzingenieurwesen - Eine Ingenieurdisziplim hat die Akzeptanzschwelle überschritten. Teil 1: Brandsimulationsberechnung. S. 18-19 Flesch, Tobias : Brandschutzingenieurwesen - Eine Ingenieurdisziplin hat die Akzeptanzschwelle überschritten. Teil 2: Tragwerksbemessung im Brandfall. S. 20-21. Müller, Bert : Neubau für die Mediengruppe RTL-Deutschland - High-Tech in dankmalgeschützter Fassade. S. 24-25. Hermens, Gereon : Erhöhung der Akzeptanz von Wasserkraft durch den Bau von Fischaufstiegsanlagen: Umweltschonende Energie für Natur und Klima. S. 26-27 Klitzing, Bastian : Kläranlagenoptimierung : Zukunftsweisende Planungen im Bereich Abwasserreinigung und Energiegewinnung. S. 28-29. Ginster, Marco : Die neue Rheinbrücke Wesel. S. 32-33 Tilke, Hermann ; Wersch, Ralf van : Bauen für einen schnellen Sport. S. 34-35. KW - Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen KW - Alfha.net KW - Alumni KW - Absolvententreffen Y1 - 2008 ER - TY - CHAP A1 - Platzbecker, Frank T1 - Rückbau von drei Indewehren bei Eschweiler/Weisweiler – Renaturierung unter schwierigen Bedingungen N2 - Dipl.-Ing. Frank Platzbecker - Ingenieurbüro H. Berg & Partner GmbH, Aachen. 17 Folien (S. 92-108). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Praxisbericht zum Rückbau von drei Wehren an der Inde in Eschweiler-Weisweiler. KW - Renaturierung <Ökologie> KW - Stauanlage Y1 - 2009 ER - TY - CHAP A1 - Stein, Dieter T1 - Die ökologische Umgestaltung der Dhünn in Leverkusen – Ein Beispiel für die praktische Planung N2 - Dipl.-Ing. (FH) Dieter Stein M.Sc (Environmental Engineering) - Landschaftsarchitekt AKNW, Grevenbroich. 14 Seiten ( S. 78-91). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Zusammenfassung [des Autors] Unter Berücksichtigung vorhandener örtlicher Gegebenheiten und technischer Einrichtungen (wie z.B. Verkehrstrassen, Versorgungsleitungen, Einlaufbauwerke etc.) hat die Dhünn innerhalb der Deiche mehr Bewegungsfreiheit erhalten. Der Hochwasserschutz bleibt dabei weiterhin gewährleistet. Die Gehölzstrukturen im Uferbereich wurden weitgehend erhalten. Dort, wo die Bauarbeiten eine Entfernung von Gehölzen erforderlich machten, wurden die Flächen bewusst einer eigenständigen Entwicklung überlassen. In diesen Bereichen werden sich im Laufe der Zeit von selbst neue Pflanzen und Gehölze ansiedeln. Mit der naturnahen Umgestaltung der Dhünn als "Starthilfe" kann die Natur die weitere Entwicklung übernehmen: Tier- und Pflanzenarten können sich das ehemals kanalartig ausgebaute Gewässer "zurückerobern", Fische und Kleintiere finden Nahrung und Ruheplätze. Für die Menschen entsteht ein wertvoller Erholungsraum mitten in der Stadt. Trotz zahlreicher Akteure und erheblicher Restriktionen konnte das Projekt in relativ kurzer Zeit realisiert werden. Dem Wupperverband (Untere Lichtenplatzer Str. 100; 42289 Wuppertal) und hier vor allem den Projektleitern Herrn Arnim Lützenberger und Herrn Andreas Oberborbeck sei an dieser Stelle besonders für eine hervorragende Zusammenarbeit gedankt. KW - Renaturierung <Ökologie> KW - Fließgewässer Y1 - 2009 ER - TY - CHAP A1 - Hoevel, Hartmut T1 - Die Zukunft der Erft – Perspektiven für ein erheblich verändertes Gewässer N2 - Dipl.-Ing. Hartmut Hoevel - Erftverband, Bergheim. 3 Seiten (S. 75-77). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Die Erft ist ein linker Nebenfluss des Rheins. Der Fluss ist durch eingeleitetes Sümpfungswasser aus dem rheinischen Braunkohletagebau hinsichtlich der Wassermenge und der Temperatur stark belastet. Die vorgestellten Überlegungen betreffen die Fragen: 1. Wie soll die Erft im Jahr 2045, also nach dem voraussichtlichen Ende der Tagebauaktivitäten im Rheinischen Braunkohlerevier und damit einhergehender Beenigung der Sümpfungswassereinleitung, aussehen? 2. Wie schnell und auf welche Weise soll die Umgestaltung der Erft vonstatten gehen? KW - Fließgewässer KW - Braunkohlenbergbau KW - Sümpfungswassereinleitung Y1 - 2009 ER - TY - CHAP A1 - Huber, Brigitte A1 - Demny, Gerd T1 - Mischwassereinleitungen in Gewässer nach BWK Merkblatt M3 - Vorteile des detaillierten Nachweises N2 - Dipl.-Ing. Brigitte Huber und Dr.-Ing. Gerd Demny - Wasserverband Eifel Rur, Düren. 16 Seiten ( S. 59-74). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Zusammenfassung [der Autoren] Für das städtisch geprägte Einzugsgebiet des Broicher Baches sind ein vereinfachter und ein detaillierter Nachweis nach BWK-M3 durchgeführt worden. Dabei zeigt sich, dass die Methodik des vereinfachten Nachweises nicht geeignet ist, um eine realitätsnahe Abbildung der einleitungsgeprägten Abflüsse des Gewässers zu erhalten. Dies ist insbesondere auf die Vernachlässigung von Wellentranslation und -retention im Gerinne zurückzuführen. Die dadurch entstehende Fehleinschätzung der Abflussverhältnisse versperrt den Blick auf eine situationsgerechte Maßnahmenplanung. Der mit Hilfe eines NA-Modells geführte detaillierte Nachweis ist zwar in der Erstellung aufwändiger, zeichnet aber ein reales Bild der Abflusserhöhung durch Einleitungen. Mit Hilfe des Modells können die wesentlichen Einflüsse schnell lokalisiert und zielführende Maßnahmenvarianten identifiziert werden. In dem hier vorgestellten Beispiel des Broicher Baches können die ursprünglich identifizierten acht Maßnahmen auf eine reduziert werden. Das Gesamtvolumen der erforderlichen Rückhaltungen wird um die Hälfte verringert. Der Vergleich beider Nachweismethoden legt nach Ansicht der Autoren nahe, den vereinfachten Nachweis höchstens für eine erste Einschätzung des Maßnahmenbedarfs anzuwenden. Die Maßnahmenidentifikation und -dimensionierung sollte grundsätzlich mit der detaillierten Nachweismethode durchgeführt werden, die auf einem entsprechenden NA-Modell basiert. Dies gilt insbesondere für Gewässerstrecken, deren Abfluss durch mehrere, hintereinander liegende Einleitungsstellen geprägt ist. KW - Fließgewässer KW - Mischwasser KW - Mischwassereinleitung Y1 - 2009 ER - TY - CHAP A1 - Stoschek, Oliver A1 - Potthoff, Michael A1 - Petersen, Ole Svenstrup A1 - Larsen, Ole A1 - Engels, Ralf T1 - Ökologische Modellierung von Gewässergüteparametern an der Tide-Elbe N2 - Dr.-Ing. Oliver Stoschek [u.a.] DHI Wasser und Umwelt GmbH, Syke. 14 S. (S. 45-58). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Ökologische Modelle zur Berechnung der Temperaturveränderung und den Einfluss von Kühlwasser auf die Wassertemperatur der Elbe. Die vorgelegte Arbeit wurde beauftragt und unterstützt von der ARGE Elbe im Zuge der Neuauflage des Wärmelastplans Elbe. KW - Wassergüte KW - Wasserwirtschaft KW - Wärmelastplan Y1 - 2009 ER - TY - CHAP A1 - Hoffmann, Marc T1 - Analyse und Visualisierung von zeitbezogenen Daten im Raum – Beispiele aus Hydrologie und Wasserwirtschaft N2 - Dipl.-Ing Marc Hoffmann - Kisters AG, Aachen. 13 S. (S. 32-44). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Zahlreiche Folien, Grafiken und Praxisbeispiele KW - Visualisierung KW - Hydrologie KW - Wasserwirtschaft Y1 - 2009 ER - TY - CHAP A1 - Heisterkamp, Reinhold T1 - Vom Desktop-GIS zur mobilen 3D-Lösung N2 - Dipl.-Ing. Reinhold Heisterkamp - GDS Geo Daten Service GmbH, Borken (Westf.). 8 S. (S. 24-31). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Einleitung Web-GIS Leistungsmerkmale von aktuellen Web-GIS Mobile GIS-Lösungen Dreidimensionale GIS-Lösungen KW - Geoinformationssystem KW - Geodatenbank KW - Geodatenhaltung KW - Geoinformationen Y1 - 2009 ER -