TY - CHAP A1 - Schlenkhoff, Andreas A1 - Bung, Daniel Bernhard T1 - Prediction of oxygen transfer in self-aerated skimming flow on embankment stepped spillways T2 - Water engineering for sustainable environment : 33rd IAHR congress ; 9 - 14 August 2009, Vancouver, British Columbia, Canada Y1 - 2009 SN - 9789078046080 SP - 1 CD-ROM ER - TY - CHAP A1 - Kretschmann, Lars T1 - Planung und Bauleitung Buschtunnel Aachen N2 - In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 16-17 Der Umbau des Aachener Buschtunnels im Rahmen des europäischen Hochgeschwindigkeitsschienennetzes wird im sogenannten "Neuen Österreichischen Tunnelbauverfahren (NOeT)", also ein Ausbau in Kalotte, Strosse und Sohle durchgeführt. KW - Bauplanung KW - Bauführung KW - Bauleitung KW - Tunnelbau Y1 - 2006 ER - TY - CHAP A1 - Gobbelé, Dirk T1 - Planung der Umbaumaßnahme Hauptbahnhof Aachen N2 - In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 13-15. Bericht über die infrastrukturellen Maßnahmen zum Umbau des Hauptbahnhofs Aachen. KW - Bauplanung KW - Umbauplanung KW - Verkehrsbau KW - Hauptbahnhof Aachen Y1 - 2006 ER - TY - CHAP A1 - Himmerich, Jörg T1 - Pipeline Integrity Management System - Probabilistische Bewertung von Bauwerken am Beispiel von Hochdruckleitungen N2 - In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 21-22. Zusammenfassung des Vortrags. KW - Hochdruckleitung KW - PIMS KW - Pipeline Integrity Management System Y1 - 2006 ER - TY - CHAP A1 - Kerpen, N. B. A1 - Bung, Daniel Bernhard A1 - Schlurmann, Torsten ED - Janssen, Robert T1 - Physical model investigations of ships passing through a lock T2 - Hydraulic structures: useful water harvesting systems or relics? : Third International Junior Researcher and Engineer Workshop on Hydraulic Structures (IJREWHS'10) : Edinburgh, Scotland, U.K., 2-3 May 2010 Y1 - 2010 SN - 9781742720159 SP - 93 EP - 100 PB - School of Civil Engineeering, The University of Queensland CY - Brisbane ER - TY - CHAP A1 - Kerpen, N. B. A1 - Bung, Daniel Bernhard A1 - Schlurmann, Torsten T1 - Physical model investigations of pressure distributions next to ships passing through a lock T2 - 5th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : CG JOINT 2010 Y1 - 2010 SN - 978-7-5618-3671-2 SP - 514 EP - 519 PB - Univ. Press CY - Tianjin ER - TY - CHAP A1 - Wellmann, Judith T1 - Perspektiven eines Bauingenieurs im konstruktiven Ingenieurbau N2 - In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 7-12 Die Berufsperspektiven im konstruktiven Ingenieurbau werden trotz sinkendem Bedarf an Statikern positiv bewertet. KW - Ingenieurbau KW - Konstruktiver Ingenieurbau KW - Statiker KW - Berufsperspektiven Y1 - 2006 ER - TY - CHAP A1 - Andorfer, Johann T1 - Parallelisierung und verteiltes Rechnen - Chancen für die Langzeitsimulation N2 - Dipl.Ing. Johann Andorfer , Tandler.com GmbH, Buch a. Erlbach. Abstract zum 1. Aachener Softwaretag in der Wasserwirtschaft <1,2007, Aachen>. 2 S. (S. 136-137) Eine nachhaltige Sicherung der Funktionalität und der ökologischen Verträglichkeit eines mittleren bis großen Kanalnetzes erfordert eine umfassende und detaillierte Modellierung in Raum und Zeit. Um den in den Richtlinien geforderten statistischen Anforderungen gerecht zu werden und die jährlichen Häufigkeiten, Mengen und Zeiträume der Belastungen erwartungstreu abschätzen zu können, ist es zielführend und notwendig, lange Zeiträume und die Gesamtheit der Einzugsgebiete möglichst detailliert zu betrachten. Die hydraulische Funktionalität und Sicherheit soll meistens mit Hilfe zeitsymmetrischer (hydrodynamischer) Verfahren nur durch Betrachtung von Modellregen, allenfalls Regenserien, sichergestellt werden. Für die Abschätzung der jährlich zu erwartenden Emissionen in unsere natürlichen Gewässer mit ihren Mengen, Frequenzen und Dauern werden normalerweise Langzeitsimulationen natürlicher Regenreihen über möglichst große Zeiträume mit zeitasymmetrischen (hydrologischen) Verfahren durchgeführt. Die betrachteten Kanalnetze werden zumeist vereinfacht (Grobnetze), um die Rechenzeiten erträglicher zu gestalten. Wünschenswert wäre jedoch eine allen Anforderungen gerecht werdende wirklichkeitsnahe Modellierung des gesamten Kanalnetzes in all seinen Details, Vermaschungen und Wechselwirkungen (Feinnetz) und dessen zeitsymmetrische und damit verlässliche Simulation mit langjährigen Regenreihen. Bereits vor 15 Jahren wurde im Hause Tandler begonnen, die Berechnungssoftware durch Parallelisierung auf symmetrische Multiprozessortechnologien auszurichten. In neuerer Zeit hält diese Technik durch die Mehrkernprozessoren in normalen Notebooks und PCs Einzug in die Ingenieurbüros und Abwasserbetriebe und sorgt schon für wesentliche Einsparungen an Rechenzeit. Doch erst durch die Kombination der Parallelisierung mit dem Prinzip des verteilten Rechnens (d.h. die Einbeziehung mehrerer PCs eines Netzwerkes in die Berechnung) erhält man die Chance ausreichend Rechenkapazität zur Verfügung zu stellen, um nicht nur eine einzelne Langzeitsimulation eines Feinnetzes durchzuführen, sondern sogar mehrere Sanierungsalternativen zu überprüfen. Die zukunftsweisenden Arbeiten von Dipl. Math. R. Tandler auf diesem Gebiet sind Thema dieses Vortrags. KW - Kanalisation KW - Parallelisierung KW - verteiltes Rechnen KW - Kanalnetzberechnung Y1 - 2007 ER - TY - CHAP A1 - Bung, Daniel Bernhard A1 - Schlenkhoff, Andreas ED - Pagliara, Stefano T1 - Optimization of the reaeration potential on embankment stepped spillways in skimming flow regime T2 - Hydraulic structures : proceedings of the second International Junior Researcher and Engineer Workshop on Hydraulic Structures, Pisa, Italy, 30 July-1 August 2008 Y1 - 2008 SN - 978-88-8492-568-8 SP - 97 EP - 106 ER - TY - CHAP A1 - Bung, Daniel Bernhard ED - Theobald, S. T1 - Optimierung des potentiellen Sauerstoffeintrags auf Treppenschussrinnen mit gemäßigter Neigung T2 - 9. JuWi-Treffen : Beiträge zum Treffen junger Wissenschaftlerinnen und junger Wissenschaftler deutschsprachiger Wasserbauinstitute Y1 - 2009 SP - 73 EP - 78 PB - Universität Kassel CY - Kassel ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Duran Paredes, Ludwin A1 - Mottaghy, Darius A1 - Herrmann, Ulf A1 - Groß, Rolf Fritz T1 - Online ground temperature and soil moisture monitoring of a shallow geothermal system with non-conventional components T2 - EGU General Assembly 2020 N2 - We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation. Y1 - 2020 N1 - EGU General Assembly 2020, Online, 4–8 May 2020 ER - TY - CHAP A1 - Bung, Daniel Bernhard T1 - Observations on non-aerated flow and air entrainment on moderately sloped stepped spillways T2 - 7th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : 8. - 12. Sept. 2014, Hannover Y1 - 2014 N1 - Kennwortgeschützter Zugang. Passwort bei Prof. Bung, Fachbereich Bauingenieurwesen SP - 1 EP - 8 ER - TY - CHAP A1 - Müller, Karsten A1 - Fischer, B. T1 - Objective condition assessment of sewer systems T2 - Strategic asset management of water supply and wastewater infrastructures : invited papers from the 2nd IWA Leading Edge Conference on Strategic Asset Management (LESAM), Lisbon, October [17 - 19] 2007 / ed. by Helene Alegre and Maria do Céu Almeida Y1 - 2009 SN - 9781843391869 SP - 521 EP - 534 PB - IWA Publ. CY - London ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Numerische Strömungssimulation von Fließgewässern - Wo stehen wir und was werden wir im Laufe der nächsten Jahre erreichen? T2 - Simulationsverfahren und Modelle für Wasserbau und Wasserwirtschaft = Simulation techniques and models for hydraulic engineering and water management / 37. Dresdner Wasserbaukolloquium 2014, 13. - 14. März 2014. (Dresdner wasserbauliche Mitteilungen ; H. 50) Y1 - 2014 SN - 978-3-86780-349-6 SP - 19 EP - 30 ER - TY - CHAP A1 - Valero, Daniel A1 - Bung, Daniel Bernhard A1 - Erpicum, Sebastien A1 - Dewals, Benjamin T1 - Numerical study of turbulent oscillations around a cylinder: RANS capabilities and sensitivity analysis T2 - Proceedings of the 37th IAHR World Congress August 13 – 18, 2017, Kuala Lumpur, Malaysia Y1 - 2017 SN - 2521-716X SP - 3126 EP - 3135 ER - TY - CHAP A1 - Oertel, Mario A1 - Balmes, Jan P. A1 - Bung, Daniel Bernhard T1 - Numerical simulation of erosion processes on crossbar block ramps T2 - E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 8 ER - TY - CHAP A1 - Kirsch, Ansgar A1 - Marcher, Thomas T1 - Numerical prediction of time-dependent rock swelling based on an example of a major tunnel project in Ontario/Canada T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 297 EP - 302 PB - Taylor and Francis CY - London ER - TY - CHAP A1 - Valero, Daniel A1 - Bung, Daniel Bernhard A1 - Crookston, B. M. A1 - Matos, J. ED - Crookston, B. ED - Tullis, B. T1 - Numerical investigation of USBR type III stilling basin performance downstream of smooth and stepped spillways BT - Session 1: Hydraulic structures T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - https://doi.org/10.15142/T340628160853 SP - 635 EP - 646 ER - TY - CHAP A1 - Kirsch, Ansgar T1 - Numerical investigation of the face stability of shallow tunnels in sand T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 779 EP - 784 PB - Taylor and Francis CY - London ER -