TY - JOUR A1 - Sun, Hui A1 - Altherr, Lena A1 - Pei, Ji A1 - Pelz, Peter F. A1 - Yuan, Shouqi T1 - Optimal booster station design and operation under uncertain load JF - Applied Mechanics and Materials N2 - Given industrial applications, the costs for the operation and maintenance of a pump system typically far exceed its purchase price. For finding an optimal pump configuration which minimizes not only investment, but life-cycle costs, methods like Technical Operations Research which is based on Mixed-Integer Programming can be applied. However, during the planning phase, the designer is often faced with uncertain input data, e.g. future load demands can only be estimated. In this work, we deal with this uncertainty by developing a chance-constrained two-stage (CCTS) stochastic program. The design and operation of a booster station working under uncertain load demand are optimized to minimize total cost including purchase price, operation cost incurred by energy consumption and penalty cost resulting from water shortage. We find optimized system layouts using a sample average approximation (SAA) algorithm, and analyze the results for different risk levels of water shortage. By adjusting the risk level, the costs and performance range of the system can be balanced, and thus the system’s resilience can be engineered KW - Stochastic Programming KW - Chance Constraint KW - Engineering Application KW - Pump System KW - Water Distribution Y1 - 2018 U6 - http://dx.doi.org/10.4028/www.scientific.net/AMM.885.102 SN - 1662-7482 VL - 885 SP - 102 EP - 115 PB - Trans Tech Publications CY - Bäch ER -