TY - JOUR A1 - Hardt, Arno A1 - Köhler, M. A1 - Müller, K. D. A1 - Stoff, H. T1 - A two-dimensional position sensitive charged-particle detector for the magnetic spectrograph "BIG KARL" of the Jülich Cyclotron "JULIC". M. Köhler, K. D. Müller, H. Stoff, M. Teske, G. P. A. Berg, A. Hardt, S. Martin, C. Mayer-Böricke , J. Meißburger JF - Nuclear Instruments and Methods. 75 (1980), H. 2-3 Y1 - 1980 SN - 0029-554X SP - 357 EP - 362 ER - TY - JOUR A1 - Bansal, N. K. A1 - Müller, C. A1 - Vieira, M. E. A1 - Faber, Christian A1 - Schwarzer, Klemens T1 - Thermal performance of a rock bed storage system JF - Proceedings : University of Stuttgart, Germany, August 28th until September 1st, 2000 / Terrastock 2000, 8th International Conference on Thermal Energy Storage. Ed.: M. Benner ... - Vol. 1 Y1 - 2000 SN - 3-9805274-1-7 N1 - Terrastock <2000, Stuttgart> ; Institut für Thermodynamik und Wärmetechnik SP - 433 EP - 439 PB - Inst. für Thermodynamik und Wärmetechnik CY - Stuttgart ER - TY - JOUR A1 - Streun, M. A1 - Chavan, U. A1 - Lame, H. A1 - Parl, C. A1 - Müller-Veggian, Mattea A1 - Ziemons, Karl T1 - Treating the Gain Non-Uniformity of Multi Channel PMTs by Channel-Specific Trigger Levels JF - 2006 IEEE Nuclear Science Symposium Conference Record, Vol. 2. Y1 - 2006 SN - 1082-3654 SP - 1301 EP - 1304 CY - San Diego, CA ER - TY - JOUR A1 - Taylor, J. G. A1 - Schmitz, N. A1 - Ziemons, Karl A1 - Grosse-Ruyken, M.-L. A1 - Gruber, O. A1 - Müller-Gärtner, H.-W. A1 - Shah, N. J. T1 - The network of brain areas involved in the motion aftereffect JF - Neuroimage N2 - A network of brain areas is expected to be involved in supporting the motion aftereffect. The most active components of this network were determined by means of an fMRI study of nine subjects exposed to a visual stimulus of moving bars producing the effect. Across the subjects, common areas were identified during various stages of the effect, as well as networks of areas specific to a single stage. In addition to the well-known motion-sensitive area MT the prefrontal brain areas BA44 and 47 and the cingulate gyrus, as well as posterior sites such as BA37 and BA40, were important components during the period of the motion aftereffect experience. They appear to be involved in control circuitry for selecting which of a number of processing styles is appropriate. The experimental fMRI results of the activation levels and their time courses for the various areas are explored. Correlation analysis shows that there are effectively two separate and weakly coupled networks involved in the total process. Implications of the results for awareness of the effect itself are briefly considered in the final discussion. Y1 - 2000 SN - 1053-8119 VL - 11 IS - 4 SP - 257 EP - 270 ER - TY - JOUR A1 - Kirstein, Simon A1 - Müller, Karsten A1 - Walecki-Mingers, Mark A1 - Deserno, Thomas M. T1 - Robust adaptive flow line detection in sewer pipes JF - Automation in construction N2 - As part of a novel approach to automatic sewer inspection, this paper presents a robust algorithm for automatic flow line detection. A large image repository is obtained from about 50,000 m sewers to represent the high variability of real world sewer systems. Automatic image processing combines Canny edge detection, Hough transform for straight lines and cost minimization using Dijkstra's shortest path algorithm. Assuming that flow lines are mostly smoothly connected horizontal structures, piecewise flow line delineation is reduced to a process of selecting adjacent line candidates. Costs are derived from the gap between adjacent candidates and their reliability. A single parameter α enables simple control of the algorithm. The detected flow line may precisely follow the segmented edges (α = 0.0) or minimize gaps at joints (α = 1.0). Both, manual and ground truth-based analysis indicate that α = 0.8 is optimal and independent of the sewer's material. The algorithm forms an essential step to further automation of sewer inspection. Y1 - 2012 U6 - http://dx.doi.org/10.1016/j.autcon.2011.05.009 SN - 1872-7891 (E-Journal) ; 0926-5805 (Print) IS - 21 SP - 24 EP - 31 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Huber, M. A1 - Streblow, R. A1 - Müller, D. A1 - Lange, S. A1 - Joneleit, R. A1 - Sefker, T. A1 - Rau, Sebastian A1 - Wollert, Jörg T1 - Funksignalübertragung in Luftleitungen JF - HLH : Lüftung, Klima, Heizung, Sanitär, Gebäudetechnik Y1 - 2014 SN - 1436-5103 VL - Bd. 65 IS - H. 7/8 SP - 36 EP - 40 ER - TY - JOUR A1 - Hackl, M. A1 - Andermahr, J. A1 - Staat, Manfred A1 - Bremer, I. A1 - Borggrefe, J. A1 - Prescher, A. A1 - Müller, L. P. A1 - Wegmann, K. T1 - Suture button reconstruction of the central band of the interosseous membrane in Essex-Lopresti lesions: a comparative biomechanical investigation JF - The Journal of Hand Surgery (European Volume) Y1 - 2017 U6 - http://dx.doi.org/10.1177/1753193416665943 SN - 2043-6289 (Online) SN - 1753-1934 (Print) VL - 42 IS - 4 SP - 370 EP - 376 PB - Sage CY - London ER - TY - JOUR A1 - Müller, Tim M. A1 - Leise, Philipp A1 - Lorenz, Imke-Sophie A1 - Altherr, Lena A1 - Pelz, Peter F. T1 - Optimization and validation of pumping system design and operation for water supply in high-rise buildings JF - Optimization and Engineering N2 - The application of mathematical optimization methods for water supply system design and operation provides the capacity to increase the energy efficiency and to lower the investment costs considerably. We present a system approach for the optimal design and operation of pumping systems in real-world high-rise buildings that is based on the usage of mixed-integer nonlinear and mixed-integer linear modeling approaches. In addition, we consider different booster station topologies, i.e. parallel and series-parallel central booster stations as well as decentral booster stations. To confirm the validity of the underlying optimization models with real-world system behavior, we additionally present validation results based on experiments conducted on a modularly constructed pumping test rig. Within the models we consider layout and control decisions for different load scenarios, leading to a Deterministic Equivalent of a two-stage stochastic optimization program. We use a piecewise linearization as well as a piecewise relaxation of the pumps’ characteristics to derive mixed-integer linear models. Besides the solution with off-the-shelf solvers, we present a problem specific exact solving algorithm to improve the computation time. Focusing on the efficient exploration of the solution space, we divide the problem into smaller subproblems, which partly can be cut off in the solution process. Furthermore, we discuss the performance and applicability of the solution approaches for real buildings and analyze the technical aspects of the solutions from an engineer’s point of view, keeping in mind the economically important trade-off between investment and operation costs. KW - Technical Operations Research KW - MINLP KW - MILP KW - Experimental validation KW - Pumping systems Y1 - 2020 U6 - http://dx.doi.org/10.1007/s11081-020-09553-4 SN - 1573-2924 VL - 2021 IS - 22 SP - 643 EP - 686 PB - Springer ER -