TY - CHAP A1 - Alexopoulos, Spiros A1 - Hoffschmidt, Bernhard A1 - Rau, Christoph A1 - Sattler, Johannes Christoph T1 - Simulation of hybrid solar tower power plants T2 - 30th ISES Biennial Solar World Congress 2011 : Kassel, Germany, 28 August - 2 September 2011. Vol. 5 Y1 - 2012 SP - 4044 EP - 4050 PB - Curran CY - Red Hook, NY ER - TY - JOUR A1 - Göttsche, Joachim A1 - Hove, T. T1 - Mapping global, diffuse and beam solar radiation over Zimbabwe / T. Hove ; J. Göttsche JF - Renewable energy. 18 (1999), H. 4 Y1 - 1999 SN - 1879-0682 SP - 535 EP - 556 ER - TY - BOOK A1 - Göttsche, Joachim T1 - Eine Maximum-Likelihood-Methode zur Charakterisierung fraktaler Mengen und chaotischer dynamische Prozesse/ vorgelegt von Joachim Göttsche Y1 - 1989 N1 - Univ., Diplomarbeit--Kiel, 1989 PB - Inst. für Theoretische Physik und Sternwarte der Christian-Albrechts-Univ. CY - Kiel ER - TY - JOUR A1 - Göttsche, Joachim T1 - Eldorado summer schools JF - Progress in solar energy education. 3 (1994) Y1 - 1994 SN - 1018-5607 SP - 31 EP - 33 ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Gorzalka, Philip A1 - Dahlke, Dennis A1 - Göttsche, Joachim A1 - Israel, Martin A1 - Patel, Dhruvkumar A1 - Prahl, Christoph A1 - Schmiedt, Jacob Estevam A1 - Frommholz, Dirk A1 - Hoffschmidt, Bernhard A1 - Linkiewicz, Magdalena T1 - Building Tomograph–From Remote Sensing Data of Existing Buildings to Building Energy Simulation Input T2 - EBC, Annex 71, Fifth expert meeting, October 17-19, 2018, Innsbruck, Austria Y1 - 2018 ER - TY - CHAP A1 - Dersch, Jürgen A1 - Geyer, Michael A1 - Herrmann, Ulf A1 - Jones, Scott A. A1 - Kelly, Bruce A1 - Kistner, Rainer A1 - Ortmanns, Winfried A1 - Pitz-Paal, Robert A1 - Price, Henry ED - Steinfeld, Aldo T1 - Trough integration into power plants : a study on the performance and economy of integrated solar combined cycle systems T2 - Proceedings of the 11th SolarPACES International Symposium on Concentrated Solar Power and Chemical Energy Technologies : September 4 - 6, 2002, Zurich, Switzerland / Paul Scherrer Institut, PSI; ETH, Eidgenössische Technische Hochschule Zürich Y1 - 2002 SN - 3-9521409-3-7 SP - 661 EP - 671 PB - Paul Scherrer Inst. CY - Villingen ER - TY - CHAP A1 - Hahne, E. A1 - Herrmann, Ulf A1 - Rheinländer, J. ED - Girot, Michel T1 - The Effect of Tilt on Flow Pattern of Water/Steam Flow Through Heated Tubes T2 - Experimental heat transfer, fluid mechanics and thermodynamics 1997 : proceedings of the 4th World Conference on Experimental Heat Transfer, Fluid Mechanics and Thermodynamics, Brussels, June 2 - 6, 1997. - Vol. 2 Y1 - 1997 SN - 88-467-0014-7 SP - 925 EP - 934 PB - Ed. ETS CY - Pisa ER - TY - BOOK A1 - Anthrakidis, Anette A1 - Jahn, Roland A1 - Ritz, Thomas A1 - Schöttler, Mirjam A1 - Wallenborn, Ramona A1 - Warmke, Gisela T1 - Urbanes eCarSharing in einer vernetzten Gesellschaft Y1 - 2013 SN - 978-3-943356-70-0 PB - Steinbeis-Edition CY - Stuttgart ET - 1. Aufl. ER - TY - CHAP A1 - Dersch, Jürgen A1 - Geyer, Michael A1 - Herrmann, Ulf A1 - Jones, Scott A. A1 - Kelly, Bruce A1 - Kistner, Rainer A1 - Ortmanns, Winfried A1 - Pitz-Paal, Robert A1 - Price, Henry ED - Pearson, J. Boise T1 - Solar Trough Integration Into Combined Cycle Systems T2 - Solar engineering 2002 : proceedings of the International Solar Energy Conference ; presented at the 2002 International Solar Energy Conference, a part of Solar 2002 - Sunrise on the Reliable Energy Economy, June 15 - 20, 2002, Reno, Nevada Y1 - 2002 SN - 0-7918-1689-3 U6 - https://doi.org/doi:10.1115/SED2002-1072 SP - 351 EP - 359 PB - ASME ER -