TY - CHAP A1 - Staat, Manfred T1 - Problems and chances for probabilistic fracture mechanics in the analysis of steel pressure boundary reliability. - Überarb. Ausg. N2 - In: Technical feasibility and reliability of passive safety systems for nuclear power plants. Proceedings of an Advisory Group Meeting held in Jülich, 21-24 November 1994. - Vienna , 1996. - Seite: 43 - 55 IAEA-TECDOC-920 Abstract: It is shown that the difficulty for probabilistic fracture mechanics (PFM) is the general problem of the high reliability of a small population. There is no way around the problem as yet. Therefore what PFM can contribute to the reliability of steel pressure boundaries is demon­strated with the example of a typical reactor pressure vessel and critically discussed. Although no method is distinguishable that could give exact failure probabilities, PFM has several addi­tional chances. Upper limits for failure probability may be obtained together with trends for design and operating conditions. Further, PFM can identify the most sensitive parameters, improved control of which would increase reliability. Thus PFM should play a vital role in the analysis of steel pressure boundaries despite all shortcomings. KW - Bruchmechanik KW - probabilistic fracture mechanics KW - PFM Y1 - 2006 ER - TY - CHAP A1 - Schuh, G. A1 - Gottschalk, S. A1 - Höhne, Tim A1 - Cloots, M. ED - Wenzel, Sigrid T1 - Parametrierung einer Schlupfregelung in der simulativen Produktionsplanung T2 - Simulation in Produktion und Logistik 2006 : Tagungsband zur 12. Fachtagung, Kassel, 26. - 27. September 2006 Y1 - 2006 SN - 3-936150-48-6 N1 - ASIM-Mitteilung ; 104 SP - 233 EP - 243 ER - TY - CHAP A1 - Drumm, Christian A1 - Lemcke, Jens A1 - Oberle, Daniel T1 - Integrating Semantic Web Services and Business Process Management: A Real Use Case T2 - Proceedings of the ESWC 2006 Workshop Semantics for Business Process Management 2006 (SBPM 2006), June 2006 Y1 - 2006 ER - TY - CHAP A1 - Kob, Malte A1 - Gömmel, Andreas A1 - Butenweg, Christoph A1 - Niendorf, Thoralf T1 - Training of a combined model of larynx and vocal folds with data from MRI measurements T2 - The 5th International Conference on Voice Physiology and Biomechanics: Variations across Cultures and Species, July 12-14, 2006, Tokyo, Japan. Proceedings Y1 - 2006 SP - 45 EP - 46 ER - TY - CHAP A1 - Butenweg, Christoph A1 - Mistler, Michael T1 - Seismic resistance of unreinforced masonry buildings T2 - Proceedings of the Eighth International Conference on Computational Structures Technology : [Las Palmas de Cran Canaria, 12-15 September 2006] / ed. by B. H. V. Topping ... Y1 - 2006 SN - 1-905088-06-X U6 - https://doi.org/10.4203/ccp.83.9 SP - Paper 9 PB - Civil-Comp Press CY - Stirling ER - TY - CHAP A1 - Renault, Philippe A1 - Butenweg, Christoph A1 - Meskouris, Konstantin T1 - Baudynamische Untersuchung von Brückenbauwerken im Kölner Raum T2 - Baudynamik : Tagung Kassel, 17. und 18. Mai 2006 / VDI-Gesellschaft Entwicklung, Konstruktion, Vertrieb. (VDI-Berichte ; 1941) Y1 - 2006 SN - 3-18-091941-8 SP - 121 EP - 140 PB - VDI-Verlag CY - Düsseldorf ER - TY - CHAP A1 - Meskouris, Konstantin A1 - Mistler, Michael A1 - Butenweg, Christoph T1 - Mauerwerksbauten unter Erdbebenbelastung T2 - Numerische Methoden zur Problemlösung im konstruktiven Bauwesen : 34. Aachener Baustofftag ; 02. Februar 2006 Y1 - 2006 PB - IBAC CY - Aachen ER - TY - CHAP A1 - Loeb, Horst W. A1 - Schartner, Karl-Heinz A1 - Seboldt, Wolfgang A1 - Dachwald, Bernd A1 - Streppel, Joern A1 - Meusemann, Hans A1 - Schülke, Peter T1 - SEP for a lander mission to the jovian moon europa T2 - 57th International Astronautical Congress N2 - Under DLR-contract, Giessen University and DLR Cologne are studying solar-electric propulsion missions (SEP) to the outer regions of the solar system. The most challenging reference mission concerns the transport of a 1.35-tons chemical lander spacecraft into an 80-RJ circular orbit around Jupiter, which would enable to place a 375 kg lander with 50 kg of scientific instruments on the surface of the icy moon "Europa". Thorough analyses show that the best solution in terms of SEP launch mass times thrusting time would be a two-stage EP module and a triple-junction solar array with concentrators which would be deployed step by step. Mission performance optimizations suggest to propel the spacecraft in the first EP stage by 6 gridded ion thrusters, running at 4.0 kV of beam voltage, which would save launch mass, and in the second stage by 4 thrusters with 1.25 to 1.5 kV of positive high voltage saving thrusting time. In this way, the launch mass of the spacecraft would be kept within 5.3 tons. Without a launcher's C3 and interplanetary gravity assists, Jupiter might be reached within about 4 yrs. The spiraling-down into the parking orbit would need another 1.8 yrs. This "large mission" can be scaled down to a smaller one, e.g., by halving all masses, the solar array power, and the number of thrusters. Due to their reliability, long lifetime and easy control, RIT-22 engines have been chosen for mission analysis. Based on precise tests, the thruster performance has been modeled. Y1 - 2006 U6 - https://doi.org/10.2514/6.IAC-06-C4.4.04 N1 - 57th International Astronautical Congress, 02 October 2006 - 06 October 2006, Valencia, Spain. SP - 1 EP - 12 ER - TY - CHAP A1 - Ferrein, Alexander A1 - Lakemeyer, Gerhard A1 - Schiffer, Stefan T1 - AllemaniACs@ home 2006 team description Y1 - 2006 SP - 1 EP - 6 ER - TY - CHAP A1 - Schöning, Michael Josef A1 - Abouzar, Maryam H. A1 - Wagner, Torsten A1 - Näther, Niko A1 - Rolka, David A1 - Yoshinobu, Tatsuo A1 - Kloock, Joachim P. A1 - Turek, Monika A1 - Ingebrandt, Sven A1 - Poghossian, Arshak T1 - A semiconductor-based field-effect platform for (bio-)chemical and physical sensors: From capacitive EIS sensors and LAPS over ISFETs to nano-scale devices T2 - MRS Proceedings Y1 - 2006 U6 - https://doi.org/10.1557/PROC-0952-F08-02 N1 - Vol. 952 - Symposium F - Integrated Nanosensors SP - 1 EP - 9 ER -