TY - JOUR A1 - Ulmer, Jessica A1 - Braun, Sebastian A1 - Cheng, Chi-Tsun A1 - Dowey, Steve A1 - Wollert, Jörg T1 - Human-Centered Gamification Framework for Manufacturing Systems JF - Procedia CIRP N2 - While bringing new opportunities, the Industry 4.0 movement also imposes new challenges to the manufacturing industry and all its stakeholders. In this competitive environment, a skilled and engaged workforce is a key to success. Gamification can generate valuable feedbacks for improving employees’ engagement and performance. Currently, Gamification in workspaces focuses on computer-based assignments and training, while tasks that require manual labor are rarely considered. This research provides an overview of Enterprise Gamification approaches and evaluates the challenges. Based on that, a skill-based Gamification framework for manual tasks is proposed, and a case study in the Industry 4.0 model factory is shown. Y1 - 2020 U6 - http://dx.doi.org/10.1016/j.procir.2020.04.076 SN - 2212-8271 VL - 93 SP - 670 EP - 675 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Wollbrink, Moritz A1 - Maslo, Semir A1 - Zimmer, Daniel A1 - Abbas, Karim A1 - Arntz, Kristian A1 - Bergs, Thomas T1 - Clamping and substrate plate system for continuous additive build-up and post-processing of metal parts JF - Procedia CIRP N2 - The manufacturing share of laser powder bed fusion (L-PBF) increases in industrial application, but still many process steps are manually operated. Additionally, it is not possible to achieve tight dimensional tolerances or low surfaces roughness. Hence, a process chain has to be set up to combine additive manufacturing (AM) with further machining technologies. To achieve a continuous workpiece flow as basis for further industrialization of L-PBF, the paper presents a novel substrate system and its application on L-PBF machines and post-processing. The substrate system consists of a zero-point clamping system and a matrix-like interface of contact pins to be substantially connected to the workpiece within the L-PBF process. Y1 - 2020 U6 - http://dx.doi.org/10.1016/j.procir.2020.04.015 SN - 2212-8271 VL - 93 SP - 108 EP - 113 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Pfaff, Raphael A1 - Gidaszewski, Lars A1 - Schmidt, Bernd T1 - Berücksichtigung von No Fault Found im Diagnose- und Instandhaltungssystem von Schienenfahrzeugen JF - ETR - Eisenbahntechnische Rundschau N2 - Intermittierende und nicht reproduzierbare Fehler, auch als No Fault Found bezeichnet, treten in praktisch allen Bereichen auf und sorgen für hohe Kosten. Diese sind häufig auf unpräzise Fehlerbeschreibungen zurückzuführen. Im vorliegenden Beitrag werden Anpassungen der Vorgehensweise bei der Entwicklung und Anpassungen des Diagnosesystems vorgeschlagen. Y1 - 2020 SN - 0013-2845 IS - 5 SP - 56 EP - 59 PB - DVV Media Group CY - Hamburg ER - TY - JOUR A1 - Franko, Josef A1 - Du, Shengzhi A1 - Kallweit, Stephan A1 - Duelberg, Enno Sebastian A1 - Engemann, Heiko T1 - Design of a Multi-Robot System for Wind Turbine Maintenance JF - Energies N2 - The maintenance of wind turbines is of growing importance considering the transition to renewable energy. This paper presents a multi-robot-approach for automated wind turbine maintenance including a novel climbing robot. Currently, wind turbine maintenance remains a manual task, which is monotonous, dangerous, and also physically demanding due to the large scale of wind turbines. Technical climbers are required to work at significant heights, even in bad weather conditions. Furthermore, a skilled labor force with sufficient knowledge in repairing fiber composite material is rare. Autonomous mobile systems enable the digitization of the maintenance process. They can be designed for weather-independent operations. This work contributes to the development and experimental validation of a maintenance system consisting of multiple robotic platforms for a variety of tasks, such as wind turbine tower and rotor blade service. In this work, multicopters with vision and LiDAR sensors for global inspection are used to guide slower climbing robots. Light-weight magnetic climbers with surface contact were used to analyze structure parts with non-destructive inspection methods and to locally repair smaller defects. Localization was enabled by adapting odometry for conical-shaped surfaces considering additional navigation sensors. Magnets were suitable for steel towers to clamp onto the surface. A friction-based climbing ring robot (SMART— Scanning, Monitoring, Analyzing, Repair and Transportation) completed the set-up for higher payload. The maintenance period could be extended by using weather-proofed maintenance robots. The multi-robot-system was running the Robot Operating System (ROS). Additionally, first steps towards machine learning would enable maintenance staff to use pattern classification for fault diagnosis in order to operate safely from the ground in the future. Y1 - 2020 U6 - http://dx.doi.org/10.3390/en13102552 SN - 1996-1073 VL - 13 IS - 10 SP - Article 2552 PB - MDPI CY - Basel ER - TY - JOUR A1 - Raffeis, Iris A1 - Adjei-Kyeremeh, Frank A1 - Vroomen, Uwe A1 - Westhoff, Elmar A1 - Bremen, Sebastian A1 - Hohoi, Alexandru A1 - Bührig-Polaczek, Andreas T1 - Qualification of a Ni-Cu alloy for the laser powder bed fusion process (LPBF): Its microstructure and mechanical properties JF - Applied Sciences N2 - As researchers continue to seek the expansion of the material base for additive manufacturing, there is a need to focus attention on the Ni–Cu group of alloys which conventionally has wide industrial applications. In this work, the G-NiCu30Nb casting alloy, a variant of the Monel family of alloys with Nb and high Si content is, for the first time, processed via the laser powder bed fusion process (LPBF). Being novel to the LPBF processes, optimum LPBF parameters were determined, and hardness and tensile tests were performed in as-built conditions and after heat treatment at 1000 °C. Microstructures of the as-cast and the as-built condition were compared. Highly dense samples (99.8% density) were achieved after varying hatch distance (80 µm and 140 µm) with scanning speed (550 mm/s–1500 mm/s). There was no significant difference in microhardness between varied hatch distance print sets. Microhardness of the as-built condition (247 HV0.2) exceeded the as-cast microhardness (179 HV0.2.). Tensile specimens built in vertical (V) and horizontal (H) orientations revealed degrees of anisotropy and were superior to conventionally reported figures. Post heat treatment increased ductility from 20% to 31% (V), as well as from 16% to 25% (H), while ultimate tensile strength (UTS) and yield strength (YS) were considerably reduced. Y1 - 2020 U6 - http://dx.doi.org/10.3390/app10103401 SN - 2076-3417 N1 - Special Issue Materials Development by Additive Manufacturing Techniques VL - 10 IS - Art. 3401 SP - 1 EP - 15 PB - MDPI CY - Basel ER - TY - JOUR A1 - Kunkel, Maximilian Hugo A1 - Gebhardt, Andreas A1 - Mpofu, Khumbulani A1 - Kallweit, Stephan T1 - Quality assurance in metal powder bed fusion via deep-learning-based image classification JF - Rapid Prototyping Journal Y1 - 2019 U6 - http://dx.doi.org/10.1108/RPJ-03-2019-0066 SN - 1355-2546 VL - 26 IS - 2 SP - 259 EP - 266 ER - TY - JOUR A1 - Zabirov, Alexander A1 - Schleser, Markus A1 - Bucherer, Sebastian T1 - Füge- und Dichtkonzept für einen Leichtbauverbrennungsmotor JF - adhäsion KLEBEN & DICHTEN Y1 - 2021 U6 - http://dx.doi.org/10.1007/s35145-021-0531-5 SN - 2192-8681 VL - 65 IS - 11 SP - 12 EP - 19 PB - Springer Nature CY - Cham ER - TY - JOUR A1 - Braun, Sebastian A1 - Cheng, Chi-Tsun A1 - Dowey, Steve A1 - Wollert, Jörg T1 - Performance evaluation of skill-based order-assignment in production environments with multi-agent systems JF - IEEE Journal of Emerging and Selected Topics in Industrial Electronics N2 - The fourth industrial revolution introduces disruptive technologies to production environments. One of these technologies are multi-agent systems (MASs), where agents virtualize machines. However, the agent's actual performances in production environments can hardly be estimated as most research has been focusing on isolated projects and specific scenarios. We address this gap by implementing a highly connected and configurable reference model with quantifiable key performance indicators (KPIs) for production scheduling and routing in single-piece workflows. Furthermore, we propose an algorithm to optimize the search of extrema in highly connected distributed systems. The benefits, limits, and drawbacks of MASs and their performances are evaluated extensively by event-based simulations against the introduced model, which acts as a benchmark. Even though the performance of the proposed MAS is, on average, slightly lower than the reference system, the increased flexibility allows it to find new solutions and deliver improved factory-planning outcomes. Our MAS shows an emerging behavior by using flexible production techniques to correct errors and compensate for bottlenecks. This increased flexibility offers substantial improvement potential. The general model in this paper allows the transfer of the results to estimate real systems or other models. KW - cyber-physical production systems KW - event-based simulation KW - multi-agent systems KW - digital factory KW - industrial agents Y1 - 2021 U6 - http://dx.doi.org/10.1109/JESTIE.2021.3108524 SN - 2687-9735 IS - Early Access PB - IEEE CY - New York ER - TY - JOUR A1 - Abbas, Karim A1 - Balc, Nicolae A1 - Bremen, Sebastian A1 - Skupin, Marco T1 - Crystallization and aging behavior of polyetheretherketone PEEK within rapid tooling and rubber molding JF - Journal of Manufacturing and Materials Processing N2 - In times of short product life cycles, additive manufacturing and rapid tooling are important methods to make tool development and manufacturing more efficient. High-performance polymers are the key to mold production for prototypes and small series. However, the high temperatures during vulcanization injection molding cause thermal aging and can impair service life. The extent to which the thermal stress over the entire process chain stresses the material and whether it leads to irreversible material aging is evaluated. To this end, a mold made of PEEK is fabricated using fused filament fabrication and examined for its potential application. The mold is heated to 200 ◦C, filled with rubber, and cured. A differential scanning calorimetry analysis of each process step illustrates the crystallization behavior and first indicates the material resistance. It shows distinct cold crystallization regions at a build chamber temperature of 90 ◦C. At an ambient temperature above Tg, crystallization of 30% is achieved, and cold crystallization no longer occurs. Additional tensile tests show a decrease in tensile strength after ten days of thermal aging. The steady decrease in recrystallization temperature indicates degradation of the additives. However, the tensile tests reveal steady embrittlement of the material due to increasing crosslinking. KW - additive manufacturing KW - fused filament fabrication KW - crystallization KW - polyetheretherketone KW - rapid tooling Y1 - 2022 U6 - http://dx.doi.org/10.3390/jmmp6050093 SN - 2504-4494 N1 - The article belongs to the Special Issue Advances in Injection Molding: Process, Materials and Applications VL - 6 IS - 5 SP - 1 EP - 12 PB - MDPI CY - Basel ER - TY - JOUR A1 - Ulmer, Jessica A1 - Gröninger, Marc A1 - Braun, Sebastian A1 - Wollert, Jörg T1 - AR Arbeitsplätze: Für hochflexible und skalierbare Produktionsumgebungen JF - atp Magazin N2 - Trotz fortschreitender Automatisierung bleiben manuelle Tätigkeiten ein wichtiger Baustein der Fertigung kundenindividueller Produkte. Um die Mitarbeiter(innen) zu unterstützen und um eine effiziente Arbeit zu ermöglichen, werden zunehmend auf Augmented Reality (AR) basierende Systeme eingesetzt. Die vorgestellte Arbeit konzentriert sich auf die Entwicklung ganzheitlicher AR-Arbeitsplätze für den Einsatz in kleinen und mittleren Unternehmen (KMU). Das entwickelte AR- Handarbeitskonzept beinhaltet eine Just-in-time-Darstellung der Arbeitsaufgaben auf Werkstücken mit automatisierter Fertigungskontrolle. Als Reaktion auf kurze Produktlebenszyklen und hohe Produktvielfalten sind alle Komponenten auf maximale Flexibilität ausgelegt. Ein Umrüsten auf neue Produkte kann innerhalb von Minuten erfolgen. Y1 - 2020 U6 - http://dx.doi.org/10.17560/atp.v62i10.2495 SN - 2364-3137 VL - 62 IS - 10 PB - Vulkan-Verlag CY - Essen ER -