TY - JOUR A1 - Samm, Doris A1 - Faissner, H. A1 - Moers, T. A1 - Priem, R. T1 - Modular wall-less drift chamber for muon detection at the LHC / H. Faissner, Th. Moers, R. Priem, ... , D. Samm [u.a.] JF - Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment. 330 (1993), H. 1-2 Y1 - 1993 SP - 76 EP - 82 ER - TY - JOUR A1 - Samm, Doris T1 - DUMAND and the search for high energy neutrino point sources / Samm, Doris [u.a.] JF - Trends in astroparticle physics / ed. by Peter Christian Bosetti Y1 - 1994 SN - 3-8154-3017-8 N1 - (Teubner-Texte zur Physik; Bd. 28); International Conference on Trends in Astroparticle-Physics ; (2 : ; SP - 9 EP - 20 PB - Teubner CY - Stuttgart ER - TY - JOUR A1 - Heuermann, Holger T1 - A Synthesis Technique for Mono- and Mixed-Mode Symmetrical Filter JF - Conference proceedings : Tuesday 12th, Wednesday 13th and Thursday 14th October, [RAI International Exhibition and Congress Centre, Amsterdam ; part of European Microwave Week 2004] / EuMA, European Microwave Association . Vol. 1 Y1 - 2004 SN - 1-580-53992-0 N1 - European Microwave Conference ; (34, 2004, Amsterdam) ; European Microwave Week ; (7, 2004, Amsterdam) SP - 309 EP - 312 PB - Horizon House Publ CY - London ER - TY - JOUR A1 - Fredebeul-Krein, Markus T1 - The case for a more binding WTO agreement on regulatory principles in telecommunication markets JF - Telecommunications policy. vol. 23 (1999), H. afl. 9 Y1 - 1999 SN - 0308-5961 SP - 625 EP - 644 ER - TY - JOUR A1 - Fredebeul-Krein, Markus T1 - Telecommunications and WTO discipline : an assessment of the WTO agreement on telecommunication services JF - Telecommunications policy. 21 (1997), H. 6 Y1 - 1997 SN - 0308-5961 SP - 477 EP - 491 ER - TY - CHAP A1 - Staat, Manfred A1 - Heitzer, Michael T1 - Limit and shakedown analysis for plastic design N2 - Limit and shakedown theorems are exact theories of classical plasticity for the direct computation of safety factors or of the load carrying capacity under constant and varying loads. Simple versions of limit and shakedown analysis are the basis of all design codes for pressure vessels and pipings. Using Finite Element Methods more realistic modeling can be used for a more rational design. The methods can be extended to yield optimum plastic design. In this paper we present a first implementation in FE of limit and shakedown analyses for perfectly plastic material. Limit and shakedown analyses are done of a pipe–junction and a interaction diagram is calculated. The results are in good correspondence with the analytic solution we give in the appendix. KW - Einspielen KW - Traglast KW - Finite-Elemente-Methode KW - Traglastanalyse KW - Einspielanalyse KW - FEM KW - limit analysis KW - shakedown analysis Y1 - 1997 ER - TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank A1 - Müller, Klaus-Peter T1 - Lightning protection design of a renewable energy hybrid-system without power mains connection N2 - In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Lightning protection KW - Renewable energy KW - hybrid-system Y1 - 2001 ER - TY - CHAP A1 - Zischank, Wolfgang J. A1 - Kern, Alexander A1 - Frentzel, Ralf A1 - Heidler, Fridolin A1 - Seevers, M. T1 - Assessment of the lightning transient coupling to control cables interconnecting structures in large industrial facilities and power plants N2 - Large industrial facilities and power plants often require a huge number fo information and control cables between the differnet structures. These I&C-cables can be routed in reinforced concrete cable ducts or in isolated buried cable runs. KTA 2206 is the German lightning protection standard for nuclear power plants. During the last several years considerable effort has been made to revise this standard. Despite the well established principles and design guidelines for the construction of the lightning protection system, this standard puts special emphasis on the coupling of transient overvoltages to I&C-cables. KW - Blitzschutz KW - Elektromagnetische Kopplung KW - Überspannung KW - Kraftwerke KW - Industrieanlagen KW - Lightning KW - current distribution KW - electromagnetic coupling KW - overvoltages Y1 - 2000 ER - TY - CHAP A1 - Fredebeul-Krein, Markus T1 - Time for revision: The regulation of Germany's next generation networks in the light of new economic and technological challenges on telecom markets : Presentation for the 18th Biennial conference of the International Telecommunications Society, June 24–27, 2008 Montreal, Canada N2 - On 1st January 1998, the German telecom market was fully liberalised. Since then genuine competition between market participants has developed, based on a comprehensive legal and regulatory framework that provides for safeguards against unfair competition and market power by Deutsche Telekom. Today, about 10 years after the liberalisation of the telecommunications sector a revision of this regulatory approach has become necessary because at least on three dimensions the situation is quite different from the one 10 years ago: First, with numerous established alternative operators in the market monopolies have been successfully challenged and competition introduced. Second, not only is Cable TV becoming in large parts of Germany a viable alternative for the provision of broadband services but also mobile services are becoming increasingly a substitute for fixed services. Last but not least there are important technological changes under way, requiring huge investments in infrastructure upgrades for next generation networks. In the light of these new developments the question is to which extent the current regulatory approach of severe ex-ante regulatory intervention is still appropriate. Is any part of the network of the former incumbent still a bottleneck? A more light handed regulatory approach might be the right response to this new situation. The paper is organised as follows: The first section will briefly examine the economic rationale for regulating network access. Based on the assumption that regulation is always necessary when bottlenecks exist regulatory principles for an efficient network access regime will be derived. The second section compares the situation of the German market in early 1998 with the one of today. Thereby three dimensions will be considered: the degree of competition, the potential for substitution and technological developments. The third section will define some requirements for the future regulation of telecom markets. Proposals will be elaborated how to ensure competitive telecom markets in the light of new economic and technological challenges. KW - Telekommunikationsmarkt KW - Telekommunikationsmarkt Y1 - 2008 ER - TY - CHAP A1 - Fredebeul-Krein, Markus A1 - Haunert, Martina T1 - Assessing the effectiveness of price cap regimes for the regulation of fixed telephony markets: has it been successful in achieving competition? : preliminary draft / by Markus Fredebeul-Krein and Martina Haunert. 19th European Regional ITS Conference of the International Telecommunications Society, September 17–19, 2008 Rome, Italy N2 - 1. Introduction 2. Tariff regulation, rebalancing and price caps 3. Price cap regimes in selected European countries 4. Has price cap regulation been successful? 5. Regulatory implications for other countries KW - Telekommunikationsmarkt KW - Telekommunikationsmarkt Y1 - 2008 ER -