TY - CHAP A1 - Bung, Daniel B. A1 - Tullis, Blake T1 - Hydraulic Structures - ISHS2018 in Perspective T2 - 7th IAHR International Symposium on Hydraulic Structures, Aachen, Germany, 15-18 May Y1 - 2018 SN - 978-0-692-13277-7 U6 - http://dx.doi.org/10.15142/T3WH2B ER - TY - CHAP A1 - Valero, Daniel A1 - Vogel, Jochen A1 - Schmidt, Daniel A1 - Bung, Daniel B. T1 - Three-dimensional flow structure inside the cavity of a non-aerated stepped chute T2 - 7th IAHR International Symposium on Hydraulic Structures, Aachen, Germany, 15-18 May Y1 - 2018 SN - 978-0-692-13277-7 U6 - http://dx.doi.org/10.15142/T3GH17 ER - TY - CHAP A1 - Jockwer, R. A1 - Kleiber, M. A1 - Uibel, Thomas ED - Görlacher, Rainer T1 - Criteria for Evaluating the Simplification of Design Rules for Dowel-type Fasteners T2 - International Network on Timber Engineering Research, INTER : proceedings, meeting 51, 10 - 13 August 2016, Tallinn, Estonia Y1 - 2018 SP - 461 EP - 466 PB - Timber Scientific Publishing, KIT Holzbau und Baukonstruktionen CY - Karlsruhe ER - TY - CHAP A1 - Merkens, Torsten A1 - Hebel, Christoph T1 - Sharing mobility concepts – flexible, sustainable, smart T2 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG) KW - Sharing mobility KW - electro mobility KW - business models KW - mobility behaviour Y1 - 2021 SN - 978-3-902103-94-9 N1 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG), International Conference, International Collaboration towards Sustainable and Green, Automotive Technology, 21-22 April 2021 Chulalongkorn University, Thailand SP - 43 EP - 44 ER - TY - CHAP A1 - Valero, Daniel A1 - Kramer, Matthias A1 - Bung, Daniel B. A1 - Chanson, Hubert T1 - A stochastic bubble generator for air-water flow research T2 - E-proceedings of the 38th IAHR World Congress, September 1-6, 2019, Panama City, Panama Y1 - 2019 U6 - http://dx.doi.org/10.3850/38WC092019-0909 SP - 5714 EP - 5721 ER - TY - CHAP A1 - Tullis, Blake P. A1 - Crookston, Brian M. A1 - Bung, Daniel B. T1 - Weir head-discharge relationships: A multi-lab exercise T2 - E-proceedings of the 38th IAHR World Congress September 1-6, 2019, Panama City, Panama Y1 - 2019 SP - 1 EP - 15 ER - TY - CHAP A1 - Bung, Daniel B. A1 - Oertel, Mario T1 - Wave breaking over a submerged horizontal plate: Optical Flow, LES and RANS T2 - E-proceedings of the 38th IAHR World Congress September 1-6, 2019, Panama City, Panama Y1 - 2019 U6 - http://dx.doi.org/10.3850/38WC092019-0509 SP - 3690 EP - 3698 ER - TY - CHAP A1 - Blanke, Tobias A1 - Schmidt, Katharina S. A1 - Göttsche, Joachim A1 - Döring, Bernd A1 - Frisch, Jérôme A1 - van Treeck, Christoph ED - Weidlich, Anke ED - Neumann, Dirk ED - Gust, Gunther ED - Staudt, Philipp ED - Schäfer, Mirko T1 - Time series aggregation for energy system design: review and extension of modelling seasonal storages T2 - Energy Informatics N2 - Using optimization to design a renewable energy system has become a computationally demanding task as the high temporal fluctuations of demand and supply arise within the considered time series. The aggregation of typical operation periods has become a popular method to reduce effort. These operation periods are modelled independently and cannot interact in most cases. Consequently, seasonal storage is not reproducible. This inability can lead to a significant error, especially for energy systems with a high share of fluctuating renewable energy. The previous paper, “Time series aggregation for energy system design: Modeling seasonal storage”, has developed a seasonal storage model to address this issue. Simultaneously, the paper “Optimal design of multi-energy systems with seasonal storage” has developed a different approach. This paper aims to review these models and extend the first model. The extension is a mathematical reformulation to decrease the number of variables and constraints. Furthermore, it aims to reduce the calculation time while achieving the same results. KW - Energy system KW - Renewable energy KW - Mixed integer linear programming (MILP) KW - Typical periods KW - Time-series aggregation Y1 - 2022 U6 - http://dx.doi.org/10.1186/s42162-022-00208-5 SN - 2520-8942 N1 - Proceedings of the 11th DACH+ Conference on Energy Informatics, 15-16 September 2022, Freiburg, Germany. VL - 5 IS - 1, Article number: 17 SP - 1 EP - 14 PB - Springer Nature ER - TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz T1 - Miniature urban farming plant: a complex educational “Toy” for engineering students T2 - The Future of Education 11th Edition 2021 N2 - Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way. KW - urban farming KW - food production KW - smart engineering KW - 3D printing KW - sustainability Y1 - 2021 N1 - FOE 2021 : The Future of Education International Conference – Fully Virtual Edition; 01.07.2021-02.07.2021; Florence, Italy ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - http://dx.doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER -