TY - JOUR A1 - Röth, Thilo A1 - Nowack, N. A1 - Baumeister, E. T1 - Numerische Lösungsansätze zur Auslegung von Stahl-Leichtmetall-Hybriden aus Verbundguss für zukünftige Fahrzeugstrukturen / Nowack, N. ; Röth, T. ; Baumeister, E. JF - Berechnung und Simulation im Fahrzeugbau. Bd. 1 : Tagung Würzburg, 27. und 28. September 2006 = Numerical analysis and simulation in vehicle engineering / VDI-Gesellschaft Fahrzeug- und Verkehrstechnik Y1 - 2006 SN - 3-18-091967-1 N1 - VDI-Berichte ; 1967 SP - 363 EP - 368 PB - VDI-Verl. CY - Düsseldorf ER - TY - CHAP A1 - Reimer, Lars A1 - Braun, Carsten A1 - Ballmann, Josef T1 - Analysis of the static and dynamic aero-structural response of an elastic swept wing model by direct aeroelastic simulation T2 - ICAS 2006 proceedings : 25th Congress of the International Council of the Aeronautical Sciences ; Hamburg, Germany, 3 - 8 September, 2006 : 25th International Congress of Aeronautical Sciences Y1 - 2006 SN - 0-9533991-7-6 SP - Paper No. 2006-10.3.3 PB - Optimage CY - Edinburgh ER - TY - PAT A1 - Rainer, Nähle A1 - Röstel, Reinhard A1 - Wahle, Michael T1 - Lagerungssystem in einem Raumfahrzeug : Patentschrift T1 - Storage system for use inside a spacecraft has damping elements consisting of at least one permanent magnet and vortex flow plate : patent of invention Y1 - 2006 PB - Deutsches Patent- und Markenamt CY - München ER - TY - PAT A1 - Pischinger, Martin A1 - Esch, Thomas A1 - Duesmann, Klaus T1 - Elektromagnetischer Aktuator mit gelenkig abgestützter Rückstellfeder N2 - Die Erfindung betrifft einen elektromagnetischen Aktuator zur Betätigung eines Stellgliedes (7) mit wenigstens einem gesteuert bestrombaren Elektromagneten (1, 2) und einem mit dem Stellglied (7) in Wirkverbindung stehenden Anker (5), der bei Bestromung des Elektromagneten (1, 2) gegen die Kraft wenigstens einer an einem Gehäuse (12) abgestützten Rückstellfeder (10) an der Polfläche (3, 4) des Elektromagneten (1, 2) zur Anlage kommt, und daß zumindest der Anker (5) über eine sphärische Gelenkanordnung (11) auf der Rückstellfeder (10) abgestützt ist. Y1 - 2023 N1 - Patent DE000019822907B4 2006.07.27 ER - TY - PAT A1 - Mertens, Josef A1 - Velden, Alexander van der A1 - Kelm, Roland T1 - Flugzeug mit Flügeln, deren maximaler Auftrieb durch steuerbare Flügelkomponenten veränderbar ist : Offenlegungsschrift DE102004045732 ; Offenlegungstag: 30.03.2006 = Aircraft with wings whose maximum lift can be altered by controllable wing components Y1 - 2006 N1 - Zugleich EP1791755A1. - Volltext über Datenbank: http://publikationen.dpma.de/ PB - Deutsches Patent- und Markenamt CY - München ER - TY - JOUR A1 - Mertens, Josef T1 - Luft hat keine Balken, aber enorme Kräfte : Aerodynamik - die unsichtbare Kraft JF - HEmagazin : das Hocheffizienz-Magazin von Wilo. 2006 (2006), H. 1 Y1 - 2006 SP - 4 EP - 9 PB - - ER - TY - CHAP A1 - Loeb, Horst W. A1 - Schartner, Karl-Heinz A1 - Seboldt, Wolfgang A1 - Dachwald, Bernd A1 - Streppel, Joern A1 - Meusemann, Hans A1 - Schülke, Peter T1 - SEP for a lander mission to the jovian moon europa T2 - 57th International Astronautical Congress N2 - Under DLR-contract, Giessen University and DLR Cologne are studying solar-electric propulsion missions (SEP) to the outer regions of the solar system. The most challenging reference mission concerns the transport of a 1.35-tons chemical lander spacecraft into an 80-RJ circular orbit around Jupiter, which would enable to place a 375 kg lander with 50 kg of scientific instruments on the surface of the icy moon "Europa". Thorough analyses show that the best solution in terms of SEP launch mass times thrusting time would be a two-stage EP module and a triple-junction solar array with concentrators which would be deployed step by step. Mission performance optimizations suggest to propel the spacecraft in the first EP stage by 6 gridded ion thrusters, running at 4.0 kV of beam voltage, which would save launch mass, and in the second stage by 4 thrusters with 1.25 to 1.5 kV of positive high voltage saving thrusting time. In this way, the launch mass of the spacecraft would be kept within 5.3 tons. Without a launcher's C3 and interplanetary gravity assists, Jupiter might be reached within about 4 yrs. The spiraling-down into the parking orbit would need another 1.8 yrs. This "large mission" can be scaled down to a smaller one, e.g., by halving all masses, the solar array power, and the number of thrusters. Due to their reliability, long lifetime and easy control, RIT-22 engines have been chosen for mission analysis. Based on precise tests, the thruster performance has been modeled. Y1 - 2006 U6 - http://dx.doi.org/10.2514/6.IAC-06-C4.4.04 N1 - 57th International Astronautical Congress, 02 October 2006 - 06 October 2006, Valencia, Spain. SP - 1 EP - 12 ER - TY - JOUR A1 - Leipold, M. A1 - Fichtner, H. A1 - Heber, B. A1 - Groepper, P. A1 - Lascar, S. A1 - Burger, F. A1 - Eiden, M. A1 - Niederstadt, T. A1 - Sickinger, C. A1 - Herbeck, L. A1 - Dachwald, Bernd A1 - Seboldt, W. T1 - Heliopause Explorer - A Sailcraft Mission to the Outer Boundaries of the Solar System JF - Acta Astronautica. 59 (2006), H. 8-11 Y1 - 2006 SN - 0094-5765 N1 - International Conference on Low Cost Planetary Missions <5, 2003, Noordwijk> ; Selected Proceedings SP - 786 EP - 796 ER - TY - CHAP A1 - Kowalski, Julia A1 - McArdell, B. W. A1 - Bartelt, Perry T1 - A comparison of two approaches to modeling multiphase gravity currents T2 - Geophysical Research Abstracts Y1 - 2006 N1 - A-08738 VL - 8 ER - TY - CHAP A1 - Kowalski, Julia T1 - Numerical Debris Flow Simulation T2 - Schweizer Numerik Kolloquium : Book of Abstracts 12. April 2006 Y1 - 2006 ER -