TY - CHAP A1 - Schuh, G. A1 - Gottschalk, S. A1 - Höhne, Tim A1 - Cloots, M. ED - Wenzel, Sigrid T1 - Parametrierung einer Schlupfregelung in der simulativen Produktionsplanung T2 - Simulation in Produktion und Logistik 2006 : Tagungsband zur 12. Fachtagung, Kassel, 26. - 27. September 2006 Y1 - 2006 SN - 3-936150-48-6 N1 - ASIM-Mitteilung ; 104 SP - 233 EP - 243 ER - TY - JOUR A1 - Schuh, G. A1 - Kampker, A. A1 - Höhne, Tim T1 - Adaptive Logistik – Selbststeuerung in Fertigung und Montage JF - wt Werkstattstechnik online Y1 - 2006 SN - 1436-4980 VL - 96 IS - 5 SP - 321 EP - 324 ER - TY - JOUR A1 - Bialonski, Stephan A1 - Wellmer, Jörg A1 - Elger, Christian E. A1 - Lehnertz, Klaus T1 - Interictal focus localization in neocortical lesional epilepsies with synchronization cluster analysis JF - Epilepsia Y1 - 2006 SN - 0013-9580 VL - 47 SP - 36 ER - TY - JOUR A1 - Bialonski, Stephan A1 - Lehnertz, Klaus T1 - Identifying phase synchronization clusters in spatially extended dynamical systems JF - Physical Review E Y1 - 2006 U6 - http://dx.doi.org/10.1103/PhysRevE.74.051909 SN - 2470-0053 VL - 74 IS - 5 SP - 051909 ER - TY - JOUR A1 - Dethloff, Nina A1 - Kroll-Ludwigs, Kathrin T1 - The Constitutional Court as Driver of Reforms in German Family Law JF - International Survey of Family Law Y1 - 2018 SP - 217 EP - 234 ER - TY - CHAP A1 - Kroll-Ludwigs, Kathrin ED - Staake, Marco T1 - Selbstverantwortung oder Vertrauenshaftung? – Anwendung von § 311 II Nr. 1 BGB (c.i.c.) auf Eheverträge und Angehörigenbürgschaften T2 - Verantwortung und Haftung : Leipziger Tagung, 6. bis 9. September 2006 ; Jahrbuch Junger Zivilrechtswissenschaftler 2006 ; [17. Tagung der Gesellschaft Junger Zivilrechtswissenschaftler e.V.] Y1 - 2006 SP - 118 EP - 145 ER - TY - CHAP A1 - Drumm, Christian A1 - Lemcke, Jens A1 - Oberle, Daniel T1 - Integrating Semantic Web Services and Business Process Management: A Real Use Case T2 - Proceedings of the ESWC 2006 Workshop Semantics for Business Process Management 2006 (SBPM 2006), June 2006 Y1 - 2006 ER - TY - JOUR A1 - Stanley, Lesley A. A1 - Horsburgh, Brian C. A1 - Ross, Jillian A1 - Scheer, Nico A1 - Wolf, C. Roland T1 - Nuclear Receptors which play a pivotal role in drug disposition and chemical toxicity JF - Drug Metabolism Reviews Y1 - 2006 U6 - http://dx.doi.org/10.1080/03602530600786232 SN - 1097-9883 VL - 38 IS - 3 SP - 515 EP - 597 ER - TY - JOUR A1 - Reugels, Alexander M. A1 - Boggetti, Barbara A1 - Scheer, Nico A1 - Campos-Ortega, José A. T1 - Asymmetric localization of Numb:EGFP in dividing neuroepithelial cells during neurulation in Danio rerio JF - Developmental Dynamics Y1 - 2006 U6 - http://dx.doi.org/10.1002/dvdy.20699 SN - 1097-0177 VL - 235 IS - 4 SP - 934 EP - 948 ER - TY - CHAP A1 - Loeb, Horst W. A1 - Schartner, Karl-Heinz A1 - Seboldt, Wolfgang A1 - Dachwald, Bernd A1 - Streppel, Joern A1 - Meusemann, Hans A1 - Schülke, Peter T1 - SEP for a lander mission to the jovian moon europa T2 - 57th International Astronautical Congress N2 - Under DLR-contract, Giessen University and DLR Cologne are studying solar-electric propulsion missions (SEP) to the outer regions of the solar system. The most challenging reference mission concerns the transport of a 1.35-tons chemical lander spacecraft into an 80-RJ circular orbit around Jupiter, which would enable to place a 375 kg lander with 50 kg of scientific instruments on the surface of the icy moon "Europa". Thorough analyses show that the best solution in terms of SEP launch mass times thrusting time would be a two-stage EP module and a triple-junction solar array with concentrators which would be deployed step by step. Mission performance optimizations suggest to propel the spacecraft in the first EP stage by 6 gridded ion thrusters, running at 4.0 kV of beam voltage, which would save launch mass, and in the second stage by 4 thrusters with 1.25 to 1.5 kV of positive high voltage saving thrusting time. In this way, the launch mass of the spacecraft would be kept within 5.3 tons. Without a launcher's C3 and interplanetary gravity assists, Jupiter might be reached within about 4 yrs. The spiraling-down into the parking orbit would need another 1.8 yrs. This "large mission" can be scaled down to a smaller one, e.g., by halving all masses, the solar array power, and the number of thrusters. Due to their reliability, long lifetime and easy control, RIT-22 engines have been chosen for mission analysis. Based on precise tests, the thruster performance has been modeled. Y1 - 2006 U6 - http://dx.doi.org/10.2514/6.IAC-06-C4.4.04 N1 - 57th International Astronautical Congress, 02 October 2006 - 06 October 2006, Valencia, Spain. SP - 1 EP - 12 ER -