TY - JOUR A1 - Roesner, Andreas A1 - Scheik, Sven A1 - Olowinsky, Alexander A1 - Gillner, Arnold A1 - Reisgen, Uwe A1 - Schleser, Markus T1 - Laser assisted joining of plastic metal hybrids JF - Lasers in manufacturing 2011 : proceedings of the sixth International WLT Conference on Lasers in Manufacturing, Munich, May 23 - 26 2011. (Physics procedia ; Vol. 12 (2011), Part B) Y1 - 2011 SN - 1875-3892 (E-Journal); 1875-3884 (Print) SP - 370 EP - 377 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Reisgen, Uwe A1 - Schleser, Markus A1 - Mokrov, Oleg A1 - Zabirov, Alexander T1 - Virtual welding equipment for simulation of GMAW processes with integration of power source regulation JF - Frontiers of materials science Y1 - 2011 SN - 2095-0268 (E-Journal); 2095-025X (Print) VL - Vol. 5 IS - Iss. 2 SP - 79 EP - 89 PB - Springer CY - Berlin ER - TY - JOUR A1 - Hegger, Josef A1 - Claßen, Martin A1 - Feldmann, Markus A1 - Döring, Bernd A1 - Schaumann, Peter A1 - Sothmann, Jörg A1 - Bohne, Dirk A1 - Hargus, Steen A1 - Barben, Daniel A1 - Aarden, Erik A1 - Schielke, Sabine T1 - Integrierte und nachhaltigkeitsorientierte Deckensysteme im Stahl- und Verbundbau JF - Stahlbau Y1 - 2011 SN - 1437-1049 (E-Journal); 0038-9145 (Print) VL - Vol. 80 IS - Iss. 10 SP - 728 EP - 733 PB - Wiley CY - Weinheim ER - TY - JOUR A1 - Döring, Bernd A1 - Feldmann, Markus A1 - Kuhnhenne, Markus A1 - Müller, Dirk T1 - Phasenwechselmaterial im Metallleichtbau zur Optimierung von Energieeffizienz und sommerlicher Raumtemperatur JF - Stahlbau Y1 - 2011 SN - 1437-1049 (E-Journal); 0038-9145 (Print) VL - Vol. 80 IS - Iss. 9 SP - 666 EP - 672 PB - Wiley CY - Weinheim ER - TY - JOUR A1 - Kirschner-Hermanns, Ruth A1 - Klementz, T. A1 - Haselhuhn, Angelika A1 - Jakse, Gerhard A1 - Heidenreich, A. A1 - Brehmer, Bernhard T1 - Drangsymptomatik nach onkologisch erfolgreicher Prostatakarzinomtherapie : prospektive Studie zum Einfluss von Therapiemodalität, Morbidität und epidemiologischen Faktoren auf die Lebensqualität JF - Der Urologe Y1 - 2011 SN - 1433-0563 VL - Vol. 50 IS - Iss. 11 SP - 1412 EP - 1419 PB - Springer CY - Berlin ER - TY - JOUR A1 - Alt, Helmut T1 - Die Sonne bestimmt zunehmend die Spannung in der Steckdose : Lastflussberechnung einer Photovoltaikeinspeisung JF - EW : das Magazin für die Energie-Wirtschaft Y1 - 2011 SN - 0013-5496 N1 - Printausg. in der Bibliothek vorhanden: 23 Z 585 VL - Bd. 110 IS - H. 17/18 SP - 24 EP - 29 PB - VWEW-Energieverlag CY - Frankfurt, M. ER - TY - JOUR A1 - Niehaus, F. A1 - Gabor, E. A1 - Wieland, S. A1 - Siegert, Petra A1 - Maurer, Karl-Heinz A1 - Eck, J. T1 - Enzymes for the laundry industries: tapping the vast metagenomic pool of alkaline proteases JF - Microbial biotechnology Y1 - 2011 SN - 1432-0614 (E-Journal); 0171-1741 (Print); 0175-7598 (Print); 0340-2118 (Print) VL - Vol. 4 IS - Iss. 6 SP - 767 EP - 776 PB - Springer CY - Berlin ER - TY - JOUR A1 - Ribitsch, D. A1 - Heumann, S. A1 - Trotscha, E. A1 - Herrero Acero, E. A1 - Greimel, K. A1 - Leber, R. A1 - Birger-Gruenberger, R. A1 - Deller, S. A1 - Eiteljoerg, I. A1 - Remler, P. A1 - Weber, Th. A1 - Siegert, Petra A1 - Maurer, Karl-Heinz A1 - Donelli, I. A1 - Freddi, G. A1 - Schwab, H. A1 - Guebitz, G. M. T1 - Hydrolysis of polyethyleneterephthalate by p-nitrobenzylesterase from Bacillus subtilis JF - Biotechnology progress Y1 - 2011 SN - 1520-6033 (E-Journal); 8756-7938 (Print) VL - Vol. 27 IS - Iss. 4 SP - 951 EP - 960 PB - Wiley CY - Hoboken ER - TY - JOUR A1 - Mottaghy, Darius A1 - Pechnig, Renate A1 - Vogt, Christian T1 - The geothermal project Den Haag: 3D numerical models for temperature prediction and reservoir simulation JF - Geothermics N2 - The proposed Den Haag Zuidwest district heating system of the city of The Hague consists of a deep doublet in a Jurassic sandstone layer that is designed for a production temperature of 75 °C and a reinjection temperature of 40 °C at a flow rate of 150 m3 h−1. The prediction of reservoir temperature and production behavior is crucial for success of the proposed geothermal doublet. This work presents the results of a study of the important geothermal and geohydrological issues for the doublet design. In the first phase of the study, the influences of the three-dimensional (3D) structures of anticlines and synclines on the temperature field were examined. A comprehensive petrophysical investigation was performed to build a large scale 3D-model of the reservoir. Several bottomhole temperatures (BHTs), as well as petrophysical logs were used to calibrate the model using thermal conductivity measurements on 50 samples from boreholes in different lithological units in the study area. Profiles and cross sections extracted from the calculated temperature field were used to study the temperature in the surrounding areas of the planned doublet. In the second phase of the project, a detailed 3D numerical reservoir model was set up, with the aim of predicting the evolution of the producer and injector temperatures, and the extent of the cooled area around the injector. The temperature model from the first phase provided the boundary conditions for the reservoir model. Hydraulic parameters for the target horizons, such as porosity and permeability, were taken from data available from the nearby exploration wells. The simulation results are encouraging as no significant thermal breakthrough is predicted. For the originally planned location of the producer, the extracted water temperature is predicted to be around 79 °C, with an almost negligible cooling in the first 50 years of production. When the producer is located shallower parts of the reservoir, the yield water temperatures is lower, starting at ≈76 °C and decreasing to ≈74 °C after 50 years of operation. This comparatively larger decrease in temperature with time is caused by the structural feature of the reservoir, namely a higher dip causes the cooler water to easily move downward. In view of the poor reservoir data, the reservoir simulation model is constructed to allow iterative updates using data assimilation during planned drilling, testing, and production phases. Measurements during an 8 h pumping test carried out in late 2010 suggest that a flow rate of 150 m3 h−1 is achievable. Fluid temperatures of 76.5 °C were measured, which is very close to the predicted value. Y1 - 2011 U6 - https://doi.org/10.1016/j.geothermics.2011.07.001 SN - 0375-6505 VL - 40 IS - 3 SP - 199 EP - 210 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Lind, Thorsten Patric T1 - Handelndenhaftung bei Vorrats- oder Mantel-GmbH nur für vor Offenlegung der wirtschaftlichen Neugründung ohne Zustimmung aller Gesellschafter vorgenommene Geschäfte : BGH, Urteil vom 12.07.2011 - II ZR 71/11 : Anmerkung JF - Fachdienst Zivilrecht - LMK - Kommentierte BGH-Rechtsprechung, Lindenmaier-Möhring Y1 - 2011 SN - 1611-1095 IS - 11 PB - Beck CY - München ER -