TY - CHAP A1 - Blanke, Tobias A1 - Schmidt, Katharina S. A1 - Göttsche, Joachim A1 - Döring, Bernd A1 - Frisch, Jérôme A1 - van Treeck, Christoph ED - Weidlich, Anke ED - Neumann, Dirk ED - Gust, Gunther ED - Staudt, Philipp ED - Schäfer, Mirko T1 - Time series aggregation for energy system design: review and extension of modelling seasonal storages T2 - Energy Informatics N2 - Using optimization to design a renewable energy system has become a computationally demanding task as the high temporal fluctuations of demand and supply arise within the considered time series. The aggregation of typical operation periods has become a popular method to reduce effort. These operation periods are modelled independently and cannot interact in most cases. Consequently, seasonal storage is not reproducible. This inability can lead to a significant error, especially for energy systems with a high share of fluctuating renewable energy. The previous paper, “Time series aggregation for energy system design: Modeling seasonal storage”, has developed a seasonal storage model to address this issue. Simultaneously, the paper “Optimal design of multi-energy systems with seasonal storage” has developed a different approach. This paper aims to review these models and extend the first model. The extension is a mathematical reformulation to decrease the number of variables and constraints. Furthermore, it aims to reduce the calculation time while achieving the same results. KW - Energy system KW - Renewable energy KW - Mixed integer linear programming (MILP) KW - Typical periods KW - Time-series aggregation Y1 - 2022 U6 - http://dx.doi.org/10.1186/s42162-022-00208-5 SN - 2520-8942 N1 - Proceedings of the 11th DACH+ Conference on Energy Informatics, 15-16 September 2022, Freiburg, Germany. VL - 5 IS - 1, Article number: 17 SP - 1 EP - 14 PB - Springer Nature ER - TY - BOOK A1 - Uibel, Thomas A1 - Peterson, Leif Arne ED - Uibel, Thomas ED - Peterson, Leif Arne T1 - Tagungsband Aachener Holzbautagung 2023 Y1 - 2023 SN - 2197-4489 PB - FH Aachen CY - Aachen ER - TY - CHAP A1 - Moorkamp, Wilfried A1 - Peterson, Leif Arne A1 - Uibel, Thomas ED - Wehren, Cedric T1 - Standardholzbrücken für kommunale Geh- und Radwege T2 - Strukturen, Formen und Prinzipien : Festschrift zum 60. Geburtstag von Univ.-Prof. Dr.-Ing. Martin Trautz Y1 - 2023 SN - 978-3-95886-500-6 SP - 140 EP - 165 PB - RWTH Aachen CY - Aachen ER - TY - CHAP A1 - Duffner, Markus A1 - Uibel, Thomas A1 - Peterson, Leif Arne A1 - Moorkamp, Wilfried ED - Fouad, Nabil A. T1 - Cross Layers Light – Ein ressourceneffizientes und recyclebares Holz-Wandsystem T2 - Bauphysik Kalender 2023: Nachhaltigkeit N2 - Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht. Y1 - 2023 SN - 9783433033890 (Print) SN - 9783433611289 (Online) U6 - http://dx.doi.org/10.1002/9783433611289.ch13 SP - 483 EP - 501 PB - Ernst & Sohn CY - Berlin ER - TY - JOUR A1 - Cheenakula, Dheeraja A1 - Griebel, Kai A1 - Montag, David A1 - Grömping, Markus ED - Huang, Xiaowu T1 - Concept development of a mainstream deammonification and comparison with conventional process in terms of energy, performance and economical construction perspectives JF - Frontiers in Microbiology N2 - Deammonification for nitrogen removal in municipal wastewater in temperate and cold climate zones is currently limited to the side stream of municipal wastewater treatment plants (MWWTP). This study developed a conceptual model of a mainstream deammonification plant, designed for 30,000 P.E., considering possible solutions corresponding to the challenging mainstream conditions in Germany. In addition, the energy-saving potential, nitrogen elimination performance and construction-related costs of mainstream deammonification were compared to a conventional plant model, having a single-stage activated sludge process with upstream denitrification. The results revealed that an additional treatment step by combining chemical precipitation and ultra-fine screening is advantageous prior the mainstream deammonification. Hereby chemical oxygen demand (COD) can be reduced by 80% so that the COD:N ratio can be reduced from 12 to 2.5. Laboratory experiments testing mainstream conditions of temperature (8–20°C), pH (6–9) and COD:N ratio (1–6) showed an achievable volumetric nitrogen removal rate (VNRR) of at least 50 gN/(m3∙d) for various deammonifying sludges from side stream deammonification systems in the state of North Rhine-Westphalia, Germany, where m3 denotes reactor volume. Assuming a retained Norganic content of 0.0035 kgNorg./(P.E.∙d) from the daily loads of N at carbon removal stage and a VNRR of 50 gN/(m3∙d) under mainstream conditions, a resident-specific reactor volume of 0.115 m3/(P.E.) is required for mainstream deammonification. This is in the same order of magnitude as the conventional activated sludge process, i.e., 0.173 m3/(P.E.) for an MWWTP of size class of 4. The conventional plant model yielded a total specific electricity demand of 35 kWh/(P.E.∙a) for the operation of the whole MWWTP and an energy recovery potential of 15.8 kWh/(P.E.∙a) through anaerobic digestion. In contrast, the developed mainstream deammonification model plant would require only a 21.5 kWh/(P.E.∙a) energy demand and result in 24 kWh/(P.E.∙a) energy recovery potential, enabling the mainstream deammonification model plant to be self-sufficient. The retrofitting costs for the implementation of mainstream deammonification in existing conventional MWWTPs are nearly negligible as the existing units like activated sludge reactors, aerators and monitoring technology are reusable. However, the mainstream deammonification must meet the performance requirement of VNRR of about 50 gN/(m3∙d) in this case. KW - anammox KW - energy efficiency KW - mainstream deammonification KW - nitrogen elimination KW - wastewater Y1 - 2023 U6 - http://dx.doi.org/10.3389/fmicb.2023.1155235 SN - 1664-302X VL - 14 IS - 11155235 SP - 1 EP - 15 PB - Frontiers ER - TY - CHAP A1 - Ulke, Bernd ED - Krause, Thomas ED - Ulke, Bernd ED - Ferger, Martin T1 - Bauwirtschaft T2 - Zahlentafeln für den Baubetrieb N2 - Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen. Y1 - 2024 SN - 978-3-658-41329-3 (Print) SN - 978-3-658-41330-9 (eBook) U6 - http://dx.doi.org/10.1007/978-3-658-41330-9_4 SP - 17 EP - 261 PB - Springer Vieweg CY - Wiesbaden ER - TY - CHAP A1 - Ulke, Bernd ED - Krause, Thomas ED - Ulke, Bernd ED - Ferger, Martin T1 - Öffentliches Baurecht, Ausschreibung und Vergabe T2 - Zahlentafeln für den Baubetrieb N2 - Durch das öffentliche Baurecht werden die Zulässigkeit, die Grenzen, die Ordnung und die Förderung der baulichen Nutzung des Bodens geregelt. Die Ausschreibung und die Vergabe sind von essenzieller Bedeutung für ein Bauvorhaben und werden deshalb in der HOAI mit zwei Leistungsphasen abgebildet: nämlich mit der Leistungsphase 6 Vorbereitung der Vergabe sowie der Leistungsphase 7 Mitwirkung bei der Vergabe. Im Zuge der Ausschreibung und der Vergabe werden die für den AG anfallenden Kosten festgelegt und bilden somit die letzte größere Stellschraube für Preiseinsparungen. Y1 - 2024 SN - 978-3-658-41329-3 (Print) SN - 978-3-658-41330-9 (eBook) U6 - http://dx.doi.org/10.1007/978-3-658-41330-9_5 SP - 263 EP - 297 PB - Springer Vieweg CY - Wiesbaden ER - TY - CHAP A1 - Krause, Thomas A1 - Ulke, Bernd ED - Krause, Thomas ED - Ulke, Bernd ED - Ferger, Martin T1 - Bauabrechnung und Mengenermittlung T2 - Zahlentafeln für den Baubetrieb N2 - n diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen. Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau. Y1 - 2024 SN - 978-3-658-41329-3 (Print) SN - 978-3-658-41330-9 (eBook) U6 - http://dx.doi.org/10.1007/978-3-658-41330-9_7 SP - 333 EP - 397 PB - Springer Vieweg CY - Wiesbaden ER - TY - CHAP A1 - Ulke, Bernd ED - Krause, Thomas ED - Ulke, Bernd ED - Ferger, Martin T1 - Boden, Baugrube, Verbau T2 - Zahlentafeln für den Baubetrieb N2 - Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt. Y1 - 2024 SN - 978-3-658-41329-3 (Print) SN - 978-3-658-41330-9 (eBook) U6 - http://dx.doi.org/10.1007/978-3-658-41330-9_9 SP - 499 EP - 658 PB - Springer Vieweg CY - Wiesbaden ER - TY - CHAP A1 - Ferger, Martin ED - Krause, Thomas ED - Ulke, Bernd ED - Ferger, Martin T1 - Arbeitsvorbereitung und Ablaufplanung T2 - Zahlentafeln für den Baubetrieb N2 - Die Arbeitsvorbereitung, als ein wesentliches Aufgabengebiet des Baubetriebswesens, ist von enormer Bedeutung für den Erfolg eines Bauprojektes. Die Arbeitsvorbereitung lässt sich zeitlich sowohl in der Angebotsphase (kalkulationsbegleitende Arbeitsvorbereitung), in der Vorbereitungsphase der Baustelle (von Auftragsvergabe bis Baubeginn) als auch baubegleitend einordnen. Y1 - 2024 SN - 978-3-658-41329-3 (Print) SN - 978-3-658-41330-9 (eBook) U6 - http://dx.doi.org/10.1007/978-3-658-41330-9_6 SP - 299 EP - 332 PB - Springer Vieweg CY - Wiesbaden ER -