TY - CHAP A1 - Kerpen, N. B. A1 - Bung, Daniel Bernhard A1 - Schlurmann, Torsten T1 - Physical model investigations of pressure distributions next to ships passing through a lock T2 - 5th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : CG JOINT 2010 Y1 - 2010 SN - 978-7-5618-3671-2 SP - 514 EP - 519 PB - Univ. Press CY - Tianjin ER - TY - CHAP A1 - Gogolin, C. A1 - Carvalho, R. A1 - Bung, Daniel Bernhard A1 - Matos, J. T1 - Experimental and numerical investigation of steady and unsteady flows in roughened channels with cross beams T2 - 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A10837C PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Characteristics of cross-bar block ramp flows T2 - Hydraulic structures into the 21st century : 4th IAHR International Symposium on Hydraulic Structures : 9.-11.2.2012, Porto Y1 - 2012 SN - 978-989-8509-01-7 ER - TY - CHAP A1 - Schlurmann, Torsten A1 - Bung, Daniel Bernhard T1 - Experimental investigation of flow-induced radial gate vibrations at Lower Subansiri dam T2 - Sixth Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : JOINT 2012 : 23.-29.9.2012, Keelung Y1 - 2012 SP - 7 EP - 14 ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Comparison of 2D dam-break waves with VOF and SPH method T2 - Proceedings of the 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A11113 PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Bung, Daniel Bernhard T1 - Air-water surface roughness in self-aerated stepped spillway flows T2 - 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A11045 PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Bung, Daniel Bernhard A1 - Oertel, Mario T1 - Wave breaking over a submerged horizontal plate: Optical Flow, LES and RANS T2 - E-proceedings of the 38th IAHR World Congress September 1-6, 2019, Panama City, Panama Y1 - 2019 U6 - https://doi.org/10.3850/38WC092019-0509 SP - 3690 EP - 3698 ER - TY - CHAP A1 - Bung, Daniel Bernhard A1 - Tullis, Blake T1 - Hydraulic Structures - ISHS2018 in Perspective T2 - 7th IAHR International Symposium on Hydraulic Structures, Aachen, Germany, 15-18 May Y1 - 2018 SN - 978-0-692-13277-7 U6 - https://doi.org/10.15142/T3WH2B ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - JOUR A1 - Cheenakula, Dheeraja A1 - Paulsen, Svea A1 - Ott, Fabian A1 - Grömping, Markus T1 - Operational window of a deammonifying sludge for mainstream application in a municipal wastewater treatment plant JF - Water and Environment Journal N2 - The present work aimed to study the mainstream feasibility of the deammonifying sludge of side stream of municipal wastewater treatment plant (MWWTP) in Kaster, Germany. For this purpose, the deammonifying sludge available at the side stream was investigated for nitrogen (N) removal with respect to the operational factors temperature (15–30°C), pH value (6.0–8.0) and chemical oxygen demand (COD)/N ratio (≤1.5–6.0). The highest and lowest N-removal rates of 0.13 and 0.045 kg/(m³ d) are achieved at 30 and 15°C, respectively. Different conditions of pH and COD/N ratios in the SBRs of Partial nitritation/anammox (PN/A) significantly influenced both the metabolic processes and associated N-removal rates. The scientific insights gained from the current work signifies the possibility of mainstream PN/A at WWTPs. The current study forms a solid basis of operational window for the upcoming semi-technical trails to be conducted prior to the full-scale mainstream PN/A at WWTP Kaster and WWTPs globally. KW - Anammox KW - Mainstream KW - Nitrogen removal KW - Partial nitritation KW - Wastewater Y1 - 2023 U6 - https://doi.org/10.1111/wej.12898 SN - 1747-6593 N1 - Corresponding author: Dheeraja Cheenakula VL - 38 IS - 1 SP - 59 EP - 70 PB - Wiley CY - Chichester ER -