TY - CHAP A1 - Timme, Michael T1 - Kommentierung zu §§ 705 - 740 T2 - Handbuch der Beweislast - Band 2, §§ 1 - 811 BGB / Baumgärtel, Gottfried ; Laumen, Hans-Willi ; Prütting, Hanns (Hrsg.). 4., völlig überarbeitete und aktualisierte Auflage Y1 - 2019 SN - 978-3-452-29003-8 SP - 1637 EP - 1664 PB - Carl Heymanns CY - Köln ER - TY - CHAP A1 - Tippkötter, Nils A1 - Möhring, Sophie A1 - Roth, Jasmine A1 - Wulfhorst, Helene T1 - Logistics of lignocellulosic feedstocks: preprocessing as a preferable option T2 - Biorefineries N2 - In comparison to crude oil, biorefinery raw materials are challenging in concerns of transport and storage. The plant raw materials are more voluminous, so that shredding and compacting usually are necessary before transport. These mechanical processes can have a negative influence on the subsequent biotechnological processing and shelf life of the raw materials. Various approaches and their effects on renewable raw materials are shown. In addition, aspects of decentralized pretreatment steps are discussed. Another important aspect of pretreatment is the varying composition of the raw materials depending on the growth conditions. This problem can be solved with advanced on-site spectrometric analysis of the material. KW - Analytics KW - Decentral KW - Mechanical KW - On-site KW - Pre-treatment Y1 - 2019 SN - 978-3-319-97117-9 SN - 978-3-319-97119-3 U6 - https://doi.org/10.1007/10_2017_58 N1 - Advances in biochemical engineering/biotechnology ; Vol. 166 SP - 43 EP - 68 PB - Springer CY - Cham ER - TY - RPRT A1 - Tippkötter, Nils A1 - Wagner, Sebastian T1 - Biomimetischer Klebstoff aus ligninhaltigen Pflanzenresten (Teilvorhaben 1 und 2) : Schlussbericht zum Vorhaben : Laufzeit: 01.01.2016 bis 31.03.2019 Y1 - 2019 U6 - https://doi.org/10.2314/KXP:169732777X N1 - Förderkennzeichen BMEL 22030514 - 22004615 PB - FH Aachen CY - Jülich ER - TY - THES A1 - Tran, Ngoc Trinh T1 - Limit and Shakedown analysis of structures under stochastic conditions Y1 - 2019 U6 - https://doi.org/10.24355/dbbs.084-201902121135-0 PB - Technische Universität Braunschweig CY - Braunschweig ER - TY - CHAP A1 - Tullis, Blake P. A1 - Crookston, Brian M. A1 - Bung, Daniel Bernhard T1 - Weir head-discharge relationships: A multi-lab exercise T2 - Proceedings of the 38th IAHR World Congress (Panama, 2019) N2 - Though weir flow has been studied for centuries, there still remains some nuances of weir flow that are not well understood. Therefore, an international study was conducted in which 20 different hydraulics laboratories from around the world built and tested two linear weirs (quarter-round and half-round crested weirs) of common geometry. The only unconstrained dimension was the weir length, which could be adjusted to match the width of the test flume. Participating laboratories used the instrumentation and data collection methodologies of their choosing for head and discharge measurements. The experimental results found significant variability in the discharge coefficients as a function of dimensionless upstream head, as well as in the head-discharge relationships (as much as 50% in some cases). Potential sources contributing to the scatter may have included head meter instrumentation, flow meter instrumentation, approach flow length (flume length upstream of weir), head measurement location, nappe behavior, laboratory measurement methods and experimental setup, and the care and skill of the investigator (human error). Analyzing the data as a function of instrumentation types, approach length, and head measurement location did not provide any insight regarding the variations. Nappe behavior (e.g., aeration), which could be influenced by laboratory-specific conditions, varied among the datasets primarily for the half-round crested weir (about 20%). Y1 - 2019 U6 - https://doi.org/10.3850/38WC092019-0806 SN - 2521-716X (Online) N1 - 38TH IAHR World Congress – IAHR 2019 Panamá, República de Panamá, 1 – 6 September, 2019 PB - IAHR CY - Madrid ER - TY - JOUR A1 - Turlybekuly, Amanzhol A1 - Pogrebnjak, Alexander A1 - Sukhodub, L. F. A1 - Sukhodub, Liudmyla B. A1 - Kistaubayeva, A. S. A1 - Savitskaya, Irina A1 - Shokatayeva, D. H. A1 - Bondar, Oleksandr V. A1 - Shaimardanov, Z. K. A1 - Plotnikov, Sergey V. A1 - Shaimardanova, B. H. A1 - Digel, Ilya T1 - Synthesis, characterization, in vitro biocompatibility and antibacterial properties study of nanocomposite materials based on hydroxyapatite-biphasic ZnO micro- and nanoparticles embedded in Alginate matrix JF - Materials Science and Engineering C Y1 - 2019 U6 - https://doi.org/10.1016/j.msec.2019.109965 VL - 104 IS - Article number 109965 PB - Elsevier CY - Amsterdam ER - TY - BOOK A1 - Tünnemann, Thomas T1 - Formine 2019 : In Cima Y1 - 2019 SN - 978-3-9820159-1-0 PB - FH Aachen, Fachbereich Architektur CY - Aachen ER - TY - BOOK A1 - Uibel, Thomas A1 - Peterson, Leif Arne ED - Uibel, Thomas ED - Peterson, Leif Arne T1 - Tagungsband Aachener Holzbautagung 2019 Y1 - 2019 SN - 2197-4489 PB - FH Aachen CY - Aachen ER - TY - CHAP A1 - Ulke, Bernd T1 - Der baurechtliche Vertrag T2 - Übungsaufgaben und Berechnungen für den Baubetrieb N2 - Anhand von kurzen theoretischen Einführungen werden anhand von Beispielen die wesentlichen Aspekte des baurechtlichen Vertrages erläutert. Nach einer Einführung über das Zustandekommen von (Bau-) Verträgen wird die für Streitfälle unerlässliche Dokumentation auf Baustellen erläutert. Hierbei werden Hinweise zur Erstellung von Protokollen, zum E-Mail bei Großprojekten und zur Dokumentation von Stundenlohnarbeiten gegeben. Des Weiteren wird eine Schriftverkehrsliste vorgestellt, die zur Nachverfolgung des Schriftverkehrs bei Großprojekten unerlässlich ist. Anschließend werden die typischen Vertragsarten vorgestellt, die bei der Abwicklung von Großprojekten zu beachten sind und die Unterschiede werden durch Fallbeispiele erläutert. Einen Schwerpunkt des Kapitels bilden auftragsnehmerseitige Verzüge sowie mangelbehaftete Leistungen. Hier werden Hinweise gegeben, wie in den entsprechenden Situationen zu reagieren ist. Y1 - 2019 SN - 978-3-658-23127-9 SP - 63 EP - 87 PB - Springer Vieweg CY - Wiesbaden ER - TY - CHAP A1 - Ulke, Bernd T1 - Baukosten und Finanzierung T2 - Übungsaufgaben und Berechnungen für den Baubetrieb Y1 - 2019 SN - 978-3-658-23127-9 U6 - https://doi.org/10.1007/978-3-658-23127-9_4 SP - 89 EP - 100 PB - Springer Vieweg CY - Wiesbaden ER -