TY - CHAP A1 - Olaru, Alexandra Maria A1 - Kowalski, Julia A1 - Sethi, Vaishali A1 - Blümich, Bernhard T1 - Fluid Transport in Porous Media probed by Relaxation-Exchange NMR T2 - 2011 Fall Meeting, AGU, San Francisco, Calif., 5-9 Dec. Y1 - 2011 N1 - H12B-07; American Geophysical Union ER - TY - CHAP A1 - Ohndorf, Andreas A1 - Dachwald, Bernd A1 - Seboldt, Wolfgang A1 - Schartner, Karl-Heinz T1 - Flight times to the heliopause using a combination of solar and radioisotope electric propulsion T2 - 32nd International Electric Propulsion Conference N2 - We investigate the interplanetary flight of a low-thrust space probe to the heliopause,located at a distance of about 200 AU from the Sun. Our goal was to reach this distance within the 25 years postulated by ESA for such a mission (which is less ambitious than the 15-year goal set by NASA). Contrary to solar sail concepts and combinations of allistic and electrically propelled flight legs, we have investigated whether the set flight time limit could also be kept with a combination of solar-electric propulsion and a second, RTG-powered upper stage. The used ion engine type was the RIT-22 for the first stage and the RIT-10 for the second stage. Trajectory optimization was carried out with the low-thrust optimization program InTrance, which implements the method of Evolutionary Neurocontrol,using Artificial Neural Networks for spacecraft steering and Evolutionary Algorithms to optimize the Neural Networks’ parameter set. Based on a parameter space study, in which the number of thrust units, the unit’s specific impulse, and the relative size of the solar power generator were varied, we have chosen one configuration as reference. The transfer time of this reference configuration was 29.6 years and the fastest one, which is technically more challenging, still required 28.3 years. As all flight times of this parameter study were longer than 25 years, we further shortened the transfer time by applying a launcher-provided hyperbolic excess energy up to 49 km2/s2. The resulting minimal flight time for the reference configuration was then 27.8 years. The following, more precise optimization to a launch with the European Ariane 5 ECA rocket reduced the transfer time to 27.5 years. This is the fastest mission design of our study that is flexible enough to allow a launch every year. The inclusion of a fly-by at Jupiter finally resulted in a flight time of 23.8 years,which is below the set transfer-time limit. However, compared to the 27.5-year transfer,this mission design has a significantly reduced launch window and mission flexibility if the escape direction is restricted to the heliosphere’s “nose". KW - low-thrust trajectory optimization KW - heliosphere KW - ion propulsion Y1 - 2011 N1 - IEPC-2011-051 32nd International Electric Propulsion Conference,September 11–15, 2011 Wiesbaden, Germany SP - 1 EP - 12 ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Characteristics of cross-bar block ramp flows T2 - Hydraulic structures into the 21st century : 4th IAHR International Symposium on Hydraulic Structures : 9.-11.2.2012, Porto Y1 - 2012 SN - 978-989-8509-01-7 ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Comparison of 2D dam-break waves with VOF and SPH method T2 - Proceedings of the 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A11113 PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Oertel, Mario A1 - Balmes, Jan P. A1 - Bung, Daniel B. T1 - Numerical simulation of erosion processes on crossbar block ramps T2 - E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 8 ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel B. A1 - Schlenkhoff, Andreas T1 - Flash flood awareness and prevention T2 - Water engineering for sustainable environment : 33rd IAHR congress ; 9 - 14 August 2009, Vancouver, British Columbia, Canada Y1 - 2009 SN - 9789078046080 SP - 1 CD-ROM ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel B. ED - Crookston, B. ED - Tullis, B. T1 - Scouring processes downstream a crossbar block ramp BT - Session 3: Scour, erosion, sedimentation T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - http://dx.doi.org/10.15142/T3340628160853 SP - 549 EP - 559 ER - TY - CHAP A1 - Oberländer, Jan A1 - Kirchner, Patrick A1 - Keusgen, M. A1 - Schöning, Michael Josef T1 - Flexible polyimide-based calorimetric gas sensors for monitoring hy-drogen peroxide in sterilisation processes of aseptic filling machines T2 - Sensoren und Messsysteme 2014 ; Beiträge der 17. GMA/ITG-Fachtagung vom 3. bis 4. Juni 2014 in Nürnberg. (ITG-Fachbericht ; 250) Y1 - 2014 SN - 978-3-8007-3622-5 SP - 1 EP - 4 PB - VDE-Verl. CY - Düsseldorf ER - TY - CHAP A1 - Oberländer, Jan A1 - Jildeh, Zaid B. A1 - Kirchner, Patrick A1 - Wendeler, Luisa A1 - Bromm, Alexander A1 - Iken, Heiko A1 - Wagner, Patrick A1 - Keusgen, Michael A1 - Schöning, Michael Josef T1 - Experimental and numerical evaluation of interdigitated electrode array for monitoring gaseous sterilization processes T2 - 12. Dresdner Sensor-Symposium 2015 Y1 - 2015 U6 - http://dx.doi.org/10.5162/12dss2015/P3.11 SP - 163 EP - 168 ER - TY - CHAP A1 - Oberländer, Jan A1 - Arreola, Julio A1 - Hansen, Christina A1 - Greeff, Anton A1 - Mayer, Marlena A1 - Keusgen, Michael A1 - Schöning, Michael Josef T1 - Impedimetric Biosensor to Enable Fast Evaluation of Gaseous Sterilization Processes T2 - MDPI Proceedings Y1 - 2017 U6 - http://dx.doi.org/10.3390/proceedings1040435 N1 - Eurosensors 2017 Conference, Paris, France, 3–6 September 2017 VL - 1 IS - 4 ER -