TY - JOUR A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Initial stage of two-dimensional dam-break waves: laboratory versus VOF JF - Journal of hydraulic research N2 - Since several decades, dam-break waves have been of main research interest. Mathematical approaches have been developed by analytical, physical and numerical models within the past 120 years. During the past 10 years, the number of research investigations has increased due to improved measurement techniques as well as significantly increased computer memories and performances. In this context, the present research deals with the initial stage of two-dimensional dam-break waves by comparing physical and numerical model results as well as analytical approaches. High-speed images and resulting particle image velocimetry calculations are thereby compared with the numerical volume-of-fluid (VOF) method, included in the commercial code FLOW-3D. Wave profiles and drag forces on placed obstacles are analysed in detail. Generally, a good agreement between the laboratory and VOF results is found. KW - VOF KW - PIV KW - physical model KW - numerical model KW - drag force KW - dam-break Y1 - 2012 U6 - https://doi.org/10.1080/00221686.2011.639981 SN - 1814-2079 (E-Journal); 0022-1686 (Print) VL - 50 IS - 1 SP - 89 EP - 97 PB - Taylor & Francis CY - London ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Characteristics of cross-bar block ramp flows T2 - Hydraulic structures into the 21st century : 4th IAHR International Symposium on Hydraulic Structures : 9.-11.2.2012, Porto Y1 - 2012 SN - 978-989-8509-01-7 ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel Bernhard T1 - Comparison of 2D dam-break waves with VOF and SPH method T2 - Proceedings of the 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A11113 PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Oertel, Mario A1 - Balmes, Jan P. A1 - Bung, Daniel Bernhard T1 - Numerical simulation of erosion processes on crossbar block ramps T2 - E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 8 ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel Bernhard A1 - Schlenkhoff, Andreas T1 - Flash flood awareness and prevention T2 - Water engineering for sustainable environment : 33rd IAHR congress ; 9 - 14 August 2009, Vancouver, British Columbia, Canada Y1 - 2009 SN - 9789078046080 SP - 1 CD-ROM ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel Bernhard ED - Crookston, B. ED - Tullis, B. T1 - Scouring processes downstream a crossbar block ramp BT - Session 3: Scour, erosion, sedimentation T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - https://doi.org/10.15142/T3340628160853 SP - 549 EP - 559 ER - TY - CHAP A1 - Müller, Karsten A1 - Hüben, Susanne T1 - From rehabilitation strategy up to formation of lots : implementation of a computer-aided decision support system T2 - 11th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 31st August to 5th September 2008 Y1 - 2008 ER - TY - CHAP A1 - Müller, Karsten A1 - Fischer, B. T1 - Objective condition assessment of sewer systems T2 - Strategic asset management of water supply and wastewater infrastructures : invited papers from the 2nd IWA Leading Edge Conference on Strategic Asset Management (LESAM), Lisbon, October [17 - 19] 2007 / ed. by Helene Alegre and Maria do Céu Almeida Y1 - 2009 SN - 9781843391869 SP - 521 EP - 534 PB - IWA Publ. CY - London ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Merkens, Torsten A1 - Hebel, Christoph T1 - Sharing mobility concepts – flexible, sustainable, smart T2 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG) International Conference KW - Sharing mobility KW - electro mobility KW - business models KW - mobility behaviour Y1 - 2021 SN - 978-3-902103-94-9 N1 - 1st UNITED-SAIG International Conference, 21-22 APR 2021, Chulalongkorn University, Thailand SP - 43 EP - 44 ER -