TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - http://dx.doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Duran Paredes, Ludwin A1 - Mottaghy, Darius A1 - Herrmann, Ulf A1 - Groß, Rolf Fritz T1 - Online ground temperature and soil moisture monitoring of a shallow geothermal system with non-conventional components T2 - EGU General Assembly 2020 N2 - We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation. Y1 - 2020 N1 - Online 4–8 May 2020 [Session ERE2.8] EGU2020-19052 ER - TY - CHAP A1 - Müller, Karsten A1 - Fischer, B. T1 - Objective condition assessment of sewer systems T2 - Strategic asset management of water supply and wastewater infrastructures : invited papers from the 2nd IWA Leading Edge Conference on Strategic Asset Management (LESAM), Lisbon, October [17 - 19] 2007 / ed. by Helene Alegre and Maria do Céu Almeida Y1 - 2009 SN - 9781843391869 SP - 521 EP - 534 PB - IWA Publ. CY - London ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Numerische Strömungssimulation von Fließgewässern - Wo stehen wir und was werden wir im Laufe der nächsten Jahre erreichen? T2 - Simulationsverfahren und Modelle für Wasserbau und Wasserwirtschaft = Simulation techniques and models for hydraulic engineering and water management / 37. Dresdner Wasserbaukolloquium 2014, 13. - 14. März 2014. (Dresdner wasserbauliche Mitteilungen ; H. 50) Y1 - 2014 SN - 978-3-86780-349-6 SP - 19 EP - 30 ER - TY - CHAP A1 - Valero, Daniel A1 - Bung, Daniel B. A1 - Erpicum, Sebastien A1 - Dewals, Benjamin T1 - Numerical study of turbulent oscillations around a cylinder: RANS capabilities and sensitivity analysis T2 - Proceedings of the 37th IAHR World Congress August 13 – 18, 2017, Kuala Lumpur, Malaysia Y1 - 2017 SN - 2521-716X SP - 3126 EP - 3135 ER - TY - CHAP A1 - Oertel, Mario A1 - Balmes, Jan P. A1 - Bung, Daniel B. T1 - Numerical simulation of erosion processes on crossbar block ramps T2 - E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 8 ER - TY - CHAP A1 - Kirsch, Ansgar A1 - Marcher, Thomas T1 - Numerical prediction of time-dependent rock swelling based on an example of a major tunnel project in Ontario/Canada T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 297 EP - 302 PB - Taylor and Francis CY - London ER - TY - CHAP A1 - Valero, Daniel A1 - Bung, Daniel B. A1 - Crookston, B. M. A1 - Matos, J. ED - Crookston, B. ED - Tullis, B. T1 - Numerical investigation of USBR type III stilling basin performance downstream of smooth and stepped spillways BT - Session 1: Hydraulic structures T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - http://dx.doi.org/10.15142/T340628160853 SP - 635 EP - 646 ER - TY - CHAP A1 - Kirsch, Ansgar T1 - Numerical investigation of the face stability of shallow tunnels in sand T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 779 EP - 784 PB - Taylor and Francis CY - London ER - TY - CHAP A1 - Bung, Daniel B. T1 - Non-intrusive measuring of air-water flow properties in self-aerated stepped spillway flow T2 - Balance and uncertainty - water in a changing world : proceedings of the 34th IAHR world congress ; 33rd Hydrology and Water Resources Symposium ; 10th Conference on Hydraulics in Water Engineering ; 26 June - 1 July 2011, Brisbane, Australia Y1 - 2011 SN - 978-0-85825-868-6 SP - 2380 EP - 2387 ER -