TY - CHAP A1 - Becker, Jörg A1 - Bergener, Philipp A1 - Breuker, Dominic A1 - Delfmann, Patrick A1 - Eggert, Mathias T1 - An Efficient Business Process Compliance Checking Approach T2 - Governance and Sustainability in Information Systems. Managing the Transfer and Diffusion of IT : IFIP WG 8.6 International Working Conference, Hamburg, Germany, September 22-24, 2011. Proceedings Y1 - 2011 U6 - https://doi.org/10.1007/978-3-642-24148-2_19 SP - 282 EP - 287 PB - Springer CY - Berlin, Heidelberg ER - TY - CHAP A1 - Becker, Jörg A1 - Bergener, Philipp A1 - Delfmann, Patrick A1 - Eggert, Mathias A1 - Weiss, Burkhard T1 - Supporting Business Process Compliance in Financial Institutions - A Model-Driven Approach T2 - Proceedings of the 10th International Conference on Wirtschaftsinformatik : 16 - 18 February 2011, Zurich, Switzerland Y1 - 2011 N1 - Wirtschaftsinformatik Proceedings 2011. 75. SP - 355 EP - 364 ER - TY - CHAP A1 - Becker, Jörg A1 - Eggert, Mathias A1 - Winkelmann, Axel A1 - Knackstedt, Ralf T1 - Towards a Contingency Theory based Model of the Influence of Regulation on MIS T2 - Proceedings of the Seventeenth Americas Conference on Information Systems, Detroit, Michigan August 4th -7 th 2011 Y1 - 2011 ER - TY - CHAP A1 - Loeb, Horst W. A1 - Schartner, Karl-Heinz A1 - Dachwald, Bernd A1 - Ohndorf, Andreas A1 - Seboldt, Wolfgang T1 - An Interstellar – Heliopause mission using a combination of solar/radioisotope electric propulsion T2 - Presented at the 32nd International Electric Propulsion Conference N2 - There is common agreement within the scientific community that in order to understand our local galactic environment it will be necessary to send a spacecraft into the region beyond the solar wind termination shock. Considering distances of 200 AU for a new mission, one needs a spacecraft travelling at a speed of close to 10 AU/yr in order to keep the mission duration in the range of less than 25 yrs, a transfer time postulated by ESA.Two propulsion options for the mission have been proposed and discussed so far: the solar sail propulsion and the ballistic/radioisotope electric propulsion. As a further alternative, we here investigate a combination of solar-electric propulsion and radioisotope-electric propulsion. The solar-electric propulsion stage consists of six 22 cm diameter “RIT-22”ion thrusters working with a high specific impulse of 7377 s corresponding to a positive grid voltage of 5 kV. Solar power of 53 kW BOM is provided by a light-weight solar array. The REP-stage consists of four space-proven 10 cm diameter “RIT-10” ion thrusters that will be operating one after the other for 9 yrs in total. Four advanced radioisotope generators provide 648 W at BOM. The scientific instrument package is oriented at earlier studies. For its mass and electric power requirement 35 kg and 35 W are assessed, respectively. Optimized trajectory calculations, treated in a separate contribution, are based on our “InTrance” method.The program yields a burn out of the REP stage in a distance of 79.6 AU for a usage of 154 kg of Xe propellant. With a C3 = 45,1 (km/s)2 a heliocentric probe velocity of 10 AU/yr is reached at this distance, provided a close Jupiter gravity assist adds a velocity increment of 2.7 AU/yr. A transfer time of 23.8 yrs results for this scenario requiring about 450 kg Xe for the SEP stage, jettisoned at 3 AU. We interpret the SEP/REP propulsion as a competing alternative to solar sail and ballistic/REP propulsion. Omiting a Jupiter fly-by even allows more launch flexibility, leaving the mission duration in the range of the ESA specification. Y1 - 2011 N1 - 32nd International Electric Propulsion Conference, 11-15 September. Wiesbaden, Germany SP - 1 EP - 7 ER - TY - CHAP A1 - Dachwald, Bernd A1 - Xu, Changsheng A1 - Feldmann, Marco A1 - Plescher, Engelbert T1 - IceMole : Development of a novel subsurface ice probe and testing of the first prototype on the Morteratsch Glacier T2 - EGU General Assembly 2011 Vienna | Austria | 03 – 08 April 2011 N2 - We present the novel concept of a combined drilling and melting probe for subsurface ice research. This probe, named “IceMole”, is currently developed, built, and tested at the FH Aachen University of Applied Sciences’ Astronautical Laboratory. Here, we describe its first prototype design and report the results of its field tests on the Swiss Morteratsch glacier. Although the IceMole design is currently adapted to terrestrial glaciers and ice shields, it may later be modified for the subsurface in-situ investigation of extraterrestrial ice, e.g., on Mars, Europa, and Enceladus. If life exists on those bodies, it may be present in the ice (as life can also be found in the deep ice of Earth). Y1 - 2011 ER - TY - CHAP A1 - Elsen, Ingo A1 - Schmalzbauer, Michael ED - Reussner, Ralf ED - Grund, Matthias ED - Andreas, Oberweis ED - Tichy, Walter T1 - Messsystematik zur Steuerung der Produkt- und Prozessqualität in Systemintegrationsprojekten – ein Erfahrungsbericht T2 - Software Engineering 2011 - Fachtagung des GI-Fachbereichs Softwaretechnik, 21. - 25. Februar 2011 in Karlsruhe N2 - Der Erfolg eines Softwarenentwicklungsprojektes insbesondere eines Systemintegrationsprojektes wird mit der Erfüllung des „Teufelsdreiecks“, „In-Time“, „In-Budget“, „In-Quality“ gemessen. Hierzu ist die Kenntnis der Software- und Prozessqualität essenziell, um die Einhaltung der Qualitätskriterien festzustellen, aber auch, um eine Vorhersage hinsichtlich Termin- und Budgettreue zu treffen. Zu diesem Zweck wurde in der T-Systems Systems Integration ein System aus verschiedenen Key Performance Indikatoren entworfen und in der Organisation implementiert, das genau das leistet und die Kriterien für CMMI Level 3 erfüllt. Y1 - 2011 SN - 9783885792772 SN - 1617-5468 PB - Gesellschaft für Informatik eV CY - Bonn ER -