TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz T1 - Interdisciplinary Course Smart Building Engineering: A new approach of teaching freshmen in remote teamwork project under pandemic restrictions T2 - New Perspectives in Science Education -International Conference (virtual event, 18-19 March 2021) N2 - In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future. KW - Freshmen KW - roleplay KW - Smart Building Engineering KW - BIM KW - remote teamwork Y1 - 2021 N1 - New Perspectives in Science Education - 10th Edition 18-19 March 2021 Fully Virtual Conference PB - Filodiritto CY - Bologna ER - TY - CHAP A1 - Schulze-Buxloh, Lina A1 - Groß, Rolf Fritz A1 - Ulbrich, Michelle T1 - Digital planning using building information modelling and virtual reality: new approach for students’ remote practical training under lockdown conditions in the course of smart building engineering T2 - Proceedings of International Conference on Education in Mathematics, Science and Technology 2021 N2 - The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions. KW - smart building engineering KW - building information modelling KW - virtual reality KW - lockdown conditions KW - emote practical training Y1 - 2021 SN - 978-1-952092-17-6 N1 - April 1-4, 2021 in Antalya, Turkey. SP - 118 EP - 123 PB - ISTES Organization CY - San Antonio, TX ER - TY - JOUR A1 - Kirsch, Ansgar T1 - Experimental investigation of the face stability of shallow tunnels in sand JF - Acta Geotechnica N2 - Various models have been proposed for the prediction of the necessary support pressure at the face of a shallow tunnel. To assess their quality, the collapse of a tunnel face was modelled with small-scale model tests at single gravity. The development of the failure mechanism and the support force at the face in dry sand were investigated. The observed displacement patterns show a negligible influence of overburden on the extent and evolution of the failure zone. The latter is significantly influenced, though, by the initial density of the sand: in dense sand a chimney-wedge-type collapse mechanism developed, which propagated towards the soil surface. Initially, loose sand did not show any discrete collapse mechanism. The necessary support force was neither influenced by the overburden nor the initial density. A comparison with quantitative predictions by several theoretical models showed that the measured necessary support pressure is overestimated by most of the models. Those by Vermeer/Ruse and Léca/Dormieux showed the best agreement to the measurements. Y1 - 2010 U6 - http://dx.doi.org/10.1007/s11440-010-0110-7 SN - 1861-1125 VL - 5 IS - 1 SP - 43 EP - 62 PB - Springer CY - Berlin ER - TY - JOUR A1 - Fellin, Wolfgang A1 - King, Julian A1 - Kirsch, Ansgar A1 - Oberguggenberger, Michael T1 - Uncertainty modelling and sensitivity analysis of tunnel face stability JF - Structural safety N2 - This paper proposes an approach to the choice and evaluation of engineering models with the aid of a typical application in geotechnics. An important issue in the construction of shallow tunnels, especially in weak ground conditions, is the tunnel face stability. Various theoretical and numerical models for predicting the necessary support pressure have been put forth in the literature. In this paper, we combine laboratory experiments performed at the University of Innsbruck with current methods of uncertainty and sensitivity analysis for assessing adequacy, predictive power and robustness of the models. The major issues are the handling of the twofold uncertainty of test results and of model predictions as well as the decision about what are the influential input parameters. Y1 - 2010 U6 - http://dx.doi.org/10.1016/j.strusafe.2010.06.001 SN - 0167-4730 VL - 32 IS - 6 SP - 402 EP - 410 PB - Elsevier CY - Amsterdam ER - TY - JOUR A1 - Bung, Daniel B. A1 - Valero, Daniel T1 - Optical flow estimation in aerated flows JF - Journal of Hydraulic Research N2 - Optical flow estimation is known from Computer Vision where it is used to determine obstacle movements through a sequence of images following an assumption of brightness conservation. This paper presents the first study on application of the optical flow method to aerated stepped spillway flows. For this purpose, the flow is captured with a high-speed camera and illuminated with a synchronized LED light source. The flow velocities, obtained using a basic Horn–Schunck method for estimation of the optical flow coupled with an image pyramid multi-resolution approach for image filtering, compare well with data from intrusive conductivity probe measurements. Application of the Horn–Schunck method yields densely populated flow field data sets with velocity information for every pixel. It is found that the image pyramid approach has the most significant effect on the accuracy compared to other image processing techniques. However, the final results show some dependency on the pixel intensity distribution, with better accuracy found for grey values between 100 and 150. Y1 - 2016 U6 - http://dx.doi.org/10.1080/00221686.2016.1173600 VL - 54 IS - 5 SP - 575 EP - 580 PB - Taylor & Francis CY - London ER - TY - JOUR A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Stability and scour development of bed material on crossbar block ramps JF - International journal of sediment research N2 - Block ramps are ecologically oriented drop structures with adequate energy dissipation and partially moderate flow velocities. A special case is given with crossbar block ramps, where the upstream and downstream level difference is reduced by a series of basins. To prevent the total structure from failing, the stability of single boulders within the crossbars and the bed material in between must be guaranteed. The present paper addresses the stability of bed material and scour development for various flow regimes. Any bed material erosion may affect the stability of the crossbar boulders, which in turn can result in major damages of the ramp. Therefore new design approaches are developed to choose an appropriate bed material size and to avoid failures of crossbar block ramp structures. Y1 - 2015 U6 - http://dx.doi.org/10.1016/j.ijsrc.2014.12.003 SN - 1001-6279 VL - 30 IS - 4 SP - 344 EP - 350 PB - Elsevier CY - Amsterdam ER -