TY - CHAP A1 - Kern, Alexander A1 - Beierl, Ottmar A1 - Zischank, Wolfgang T1 - Calculation of the separation distance according to IEC 62305-3: 2006-10 - Remarks for the application and simplified methods N2 - [Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate. KW - Blitzschutz KW - Lightning protection Y1 - 2009 N1 - Paper in: [10. International Symposium on Lightning Protection 9. 13. November 2009, Curitiba, Brasilien. 6 Seiten] ER - TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank T1 - Considerations about the lightning protection system of mains independent renewable energy hybrid-systems - practical experiences N2 - In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Photovoltaikanlage KW - Windenergieanlage KW - Lightning protection KW - renewable energy KW - hybrid system KW - photovoltaic system KW - wind turbine Y1 - 2002 ER - TY - JOUR A1 - Hoffstadt, Kevin A1 - Cheenakula, Dheeraja A1 - Nikolausz, Marcell A1 - Krafft, Simone A1 - Harms, Hauke A1 - Kuperjans, Isabel T1 - Design and construction of a new reactor for flexible biomethanation of hydrogen JF - Fermentation N2 - The increasing share of renewable electricity in the grid drives the need for sufficient storage capacity. Especially for seasonal storage, power-to-gas can be a promising approach. Biologically produced methane from hydrogen produced from surplus electricity can be used to substitute natural gas in the existing infrastructure. Current reactor types are not or are poorly optimized for flexible methanation. Therefore, this work proposes a new reactor type with a plug flow reactor (PFR) design. Simulations in COMSOL Multiphysics ® showed promising properties for operation in laminar flow. An experiment was conducted to support the simulation results and to determine the gas fraction of the novel reactor, which was measured to be 29%. Based on these simulations and experimental results, the reactor was constructed as a 14 m long, 50 mm diameter tube with a meandering orientation. Data processing was established, and a step experiment was performed. In addition, a kLa of 1 h−1 was determined. The results revealed that the experimental outcomes of the type of flow and gas fractions are in line with the theoretical simulation. The new design shows promising properties for flexible methanation and will be tested. KW - methanation KW - plug flow reactor KW - bubble column KW - bio-methane KW - power-to-gas Y1 - 2023 U6 - http://dx.doi.org/10.3390/fermentation9080774 SN - 2311-5637 N1 - The article belongs to the Special Issue Fermentation Processes: Modeling, Optimization and Control VL - 9 IS - 8 SP - 1 EP - 16 PB - MDPI CY - Basel ER - TY - CHAP A1 - Surtees, A. J. A1 - Gillespie, A. A1 - Kern, Alexander A1 - Rousseau, A. T1 - DEVELOPMENT OF A RISK ASSESSMENT CALCULATOR BASED ON A SIMPLIFIED FORM OF THE IEC 62305-2 STANDARD ON LIGHTNING PROTECTION N2 - Neue Blitzschutznorm IEC 62305. Entwicklung einer einfachen Software zur Risikoabwägung N2 - IEC Technical Committee 81 is currently creating the new IEC 62305 series of standards on Lightning Protection. Working Group 9 is responsible for Part 2 of this series, which deals with the assessment and management of risk its CDV (Committee Draft for Voting) stage and has been circulated to National Committees for comment. The paper details the development of the Simplified IEC Risk Assessment Calculator software tool as described in Informative Annex J of IEC62305-2 Ed.1/CDV 2. This tool is intended as a simplified implementation of the more rigorous treatment of risk management found in the written document. It is designed to be relatively intuitive for users who wish to obtain an initial assessment of risk sensitivity, but should not be considered a substitute to a full understanding of the methods provided in the standard when dealing with more complicated structures or those where greater risks to personal or system operation are involved. KW - Risiko KW - Risikoabwägung KW - Blitzrisiko KW - Blitzschutz KW - Risk KW - Risk Management KW - Risk Assessment KW - Lightning Risk KW - Lightning Protection Y1 - 2004 ER - TY - JOUR A1 - Schüller-Ruhl, Aaron A1 - Dinstühler, Leonard A1 - Senger, Thorsten A1 - Bergfeld, Stefan A1 - Ingenhag, Christian A1 - Fleischhaker, Robert ED - Mackenzie, Jacob T1 - Direct fabrication of arbitrary phase masks in optical glass via ultra-short pulsed laser writing of refractive index modifications JF - Applied Physics B N2 - We study the possibility to fabricate an arbitrary phase mask in a one-step laser-writing process inside the volume of an optical glass substrate. We derive the phase mask from a Gerchberg–Saxton-type algorithm as an array and create each individual phase shift using a refractive index modification of variable axial length. We realize the variable axial length by superimposing refractive index modifications induced by an ultra-short pulsed laser at different focusing depth. Each single modification is created by applying 1000 pulses with 15 μJ pulse energy at 100 kHz to a fixed spot of 25 μm diameter and the focus is then shifted axially in steps of 10 μm. With several proof-of-principle examples, we show the feasibility of our method. In particular, we identify the induced refractive index change to about a value of Δn=1.5⋅10−3. We also determine our current limitations by calculating the overlap in the form of a scalar product and we discuss possible future improvements. Y1 - 2022 U6 - http://dx.doi.org/10.1007/s00340-022-07928-2 SN - 1432-0649 (Online) SN - 0946-2171 (Print) N1 - Corresponding author: Robert Fleischhaker VL - 128 IS - Article number: 208 SP - 1 EP - 11 PB - Springer CY - Berlin ER - TY - CHAP A1 - Dielmann, Klaus-Peter A1 - Cudina, Boris T1 - Emissionsrechtehandel in Europa - ein neues Instrument für den Umweltschutz N2 - Funktionsprinzip Emissionsrechtehandel, Betroffene Anlagen und Branchen, Erstverteilung der Emissionsrechte, Bereits erbrachte Emissionsreduktionen (early actions), Ausstieg von betroffenen Unternehmen (opt-out), Teilnahme von nicht betroffenen Unternehmen, Einsatz von Biobrennstoffen, Erfassung und Dokumentation der Emissionen KW - Umweltzertifikathandel KW - Emissionsrechtehandel Y1 - 2003 ER - TY - CHAP A1 - Dalguer, Luis A. A1 - Renault, Philippe A1 - Churilov, Sergey A1 - Butenweg, Christoph T1 - Evaluation of fragility curves for a three-storey-reinforced-concrete mock-up of SMART 2013 project T2 - Transactions, SMiRT-23 : 23rd Conference on Structural Mechanics in Reactor Technology : Manchester, United Kingdom - August 10-14, 2015 Y1 - 2016 SP - 1 EP - 9 ER - TY - CHAP A1 - Hellmanns, Mark A1 - Hesse, Joachim T1 - Geräuschminderung und Leichtbau in Leistungsgetrieben durch den Einsatz von Werkstoffverbunden T2 - Hybride Maschinenkonzepte und intelligente Verfahren zur Fertigung von High-Tech-Produkten : Erfolgsbeispiele zur Standortsicherung in Hochlohnländern : InnoNet Kolloquium am 7. und 8.11.2007, Technologiezentrum am Europaplatz Aachen Y1 - 2007 SP - 1 EP - 46 ER - TY - JOUR A1 - Wettingfeld, Jürgen A1 - Kern, Alexander A1 - Krämer, Heinz-Josef A1 - Thormählen, Reyno T1 - International anerkannte Blitzschutznormen : Ausgewogener und sicherer Schutz N2 - Die Einleitung zur Norm DIN EN 62305-3 beschreibt klar und ein - deutig: Der vorliegende Teil der IEC 62305 behandelt den Schutz von baulichen Anlagen gegen materielle Schäden und den Schutz von Personen gegen Verletzungen durch Berührungs- und Schrittspannungen. Als das wesentlichste und effektivste Mittel zum Schutz von baulichen Anlagen gegen materielle Schäden gilt das Blitz - schutzsystem (LPS). KW - Blitzschutz KW - lightning protection Y1 - 2009 PB - Fachhochschule Aachen CY - Aachen ER - TY - CHAP A1 - Zischank, Wolfgang J. A1 - Heidler, Fridolin A1 - Kern, Alexander A1 - Metwally, I. A. A1 - Wiesinger, J. A1 - Seevers, M. T1 - Laboratory simulation of direct lightning strokes to a modelled building - measurement of magnetic fields and induced voltages N2 - In IEC 61312-2 equations for the assessment of the magnetic fields inside structures due to a direct lightning strike are given. These equations are based on computer simulations for shields consisting of a single-layer steel grid of a given mesh width. Real constructions, however, contain at least two layers of reinforcement steel grids. The objective of this study was to experimentally determine the additional shielding effectiveness of a second reinforcement layer compared to a single-layer grid. To this end, simulated structures were set up in the high current laboratory. The structures consisted of cubic cages of 2 m side length with one or with two reinforcement grids, respectively. The structures were exposed to direct lightning currents representing the variety of anticipated lightning current waveforms. The magnetic fields and their derivatives at several positions inside the structure as well as the voltage between “floor” and “roof” in the center were determined for different current injection points. From these data the improvement of the shielding caused by a second reinforcement layer is derived. KW - Direkter Blitzschlag KW - Elektromagnetischer Schutzschild KW - Magnetische Felder KW - Induzierte Spannungen KW - Stahlbetonkonstruktion KW - Lightning KW - electromagnetic shielding KW - magnetic field KW - reinforced concrete KW - induced voltage Y1 - 2002 ER - TY - CHAP A1 - Kern, Alexander A1 - Krichel, Frank A1 - Müller, Klaus-Peter T1 - Lightning protection design of a renewable energy hybrid-system without power mains connection N2 - In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system. KW - Blitzschutz KW - Erneuerbare Energien KW - Hybridsystem KW - Lightning protection KW - Renewable energy KW - hybrid-system Y1 - 2001 ER - TY - CHAP A1 - Kern, Alexander A1 - Heidler, Fridolin A1 - Seevers, M. A1 - Zischank, Wolfgang J. T1 - Magnetic Fields and Induced Voltages in case of a Direct Strike - Comparison of Results obtained from Measurements at a Scaled Building to those of IEC 62305-4 N2 - In the paper the results obtained from experiments at a modelled reinforced building in case of a direct lightning strike are compared with calculations. The comparison includes peak values of the magnetic field Hmax, its derivative (dH/dt)max and of induced voltages umax in typical cable routings. The experiments are performed at a 1:6 scaled building and the results are extrapolated using the similarity relations theory. The calculations are based on the approximate formulae given in IEC 62305-4 and have to be supplemented by a rough estimation of the additional shielding effect of a second reinforcement layer. The comparison shows, that the measured peak values of the magnetic field and its derivative are mostly lower than the calculated. The induced voltages are in good agreement. Hence, calculations of the induced voltages based on IEC 62305-4 are a good method for lightning protection studies of buildings, where the reinforcement is used as a grid-like electromagnetic shield. N2 - Auswirkungen eines direkten Blitzeinschlages auf ein Gebäude, Vergleich von experimentellen Ergebnissen und Berechnungen basierend auf einer Formel aus der IEC 62305-4 KW - Blitz KW - Direkter Blitzschlag KW - Elektromagnetischer Schutzschild KW - Magnetische Felder KW - Induzierte Spannungen KW - Kalkulation KW - Direct lightning strike KW - electromagnetic shield KW - magnetic fields KW - induced voltages KW - calculations Y1 - 2004 SN - 0304-3886 N1 - Journal of electrostatics: Beitr. auf S. 379 - 385. doi:10.1016/j.elstat.2006.09.004 ER - TY - CHAP A1 - Zischank, Wolfgang J. A1 - Heidler, Fridolin A1 - Wiesinger, J. A1 - Stimper, K. A1 - Kern, Alexander A1 - Seevers, M. T1 - Magnetic Fields and Induced Voltages inside LPZ 1 Measured at a 1:6 Scale Model Building N2 - Laborexperimente zu Blitzschutzzonen in Stahlbetongebäuden anhand eines Modells im Maßstab 1:6 N2 - For the application of the concept of Lightning Protection Zones (LPZ), the knowledge of the magnetic fields and induced voltages inside a structure is necessary. Laboratory experiments have been conducted at a downscaled model of a building (scale factor 1:6) to determine these electromagnetic quantities in case of a direct strike to the structure. The model (3 m x 2 m x 2 m) represented a small industrial building using the reinforcement of the concrete as electromagnetic shield. The magnetic fields and magnetic field derivatives were measured at several location inside the scaled model. Further, the voltages induced on three typical cable routes inside the model was determined. The influence of the lightning current waveshape, point-of-strike, bonding of the cable routes, and bridging of an expansion joint in the middle of the building on these quantities was studied. KW - Blitzschlag KW - Elektromagnetischer Schutzschild KW - Stahlbeton KW - Maßstabsgetreues Modell KW - Lightning KW - electromagnetic shielding KW - reinforced concrete KW - scaled model Y1 - 2004 ER - TY - GEN A1 - Steuer-Dankert, Linda A1 - Bernhard, Sebastian A1 - Langolf, Jessica A1 - Leicht-Scholten, Carmen T1 - Managing change and acceptance of digitalization strategies - Implementing the vision of „Internet of Production“ (IoP) in existing corporate structures T2 - Textile Impulse für die Zukunft: Aachen-Dresden-Denkendorf International Textile Conference 2022 : 1. – 2. Dezember 2022, Eurogress Aachen N2 - The vision of the Internet of Production is to enable a new level of crossdomain collaboration by providing semantically adequate and context-aware data from production, development & usage in real-time. Y1 - 2022 SP - 153 EP - 153 ER - TY - CHAP A1 - Dielmann, Klaus-Peter A1 - Peters, Bernhard T1 - Micro Turbine Using Different Gases and Liquid Fuels N2 - Micro turbine using different gases and liquid fuels KW - Gasturbine KW - Mikrogasturbine KW - Micro turbine Y1 - 2002 ER - TY - CHAP A1 - Dielmann, Klaus-Peter A1 - Schieke, Wolf T1 - Mikrogasturbinen - Aufbau und Anwendungen N2 - Mikrogasturbinen: Funktion, Aufbau, Hersteller, Bauformen, Rekuperatorparameter, Besonderheit der Konstruktion, Regelung, Regelbarkeit, Vergleich mit anderen Systemen, Wirkungs- und Nutzungsgrade, Schadstoffemissionen, Nutzung in Kraft-Wärme-Kopplung, Kraft-Wärme-Kälte-Kopplung KW - Gasturbine KW - Mikrogasturbine KW - Micro turbine Y1 - 2000 ER - TY - JOUR A1 - Blanke, Tobias A1 - Hagenkamp, Markus A1 - Döring, Bernd A1 - Göttsche, Joachim A1 - Reger, Vitali A1 - Kuhnhenne, Markus T1 - Net-exergetic, hydraulic and thermal optimization of coaxial heat exchangers using fixed flow conditions instead of fixed flow rates JF - Geothermal Energy N2 - Previous studies optimized the dimensions of coaxial heat exchangers using constant mass fow rates as a boundary condition. They show a thermal optimal circular ring width of nearly zero. Hydraulically optimal is an inner to outer pipe radius ratio of 0.65 for turbulent and 0.68 for laminar fow types. In contrast, in this study, fow conditions in the circular ring are kept constant (a set of fxed Reynolds numbers) during optimization. This approach ensures fxed fow conditions and prevents inappropriately high or low mass fow rates. The optimization is carried out for three objectives: Maximum energy gain, minimum hydraulic efort and eventually optimum net-exergy balance. The optimization changes the inner pipe radius and mass fow rate but not the Reynolds number of the circular ring. The thermal calculations base on Hellström’s borehole resistance and the hydraulic optimization on individually calculated linear loss of head coefcients. Increasing the inner pipe radius results in decreased hydraulic losses in the inner pipe but increased losses in the circular ring. The net-exergy diference is a key performance indicator and combines thermal and hydraulic calculations. It is the difference between thermal exergy fux and hydraulic efort. The Reynolds number in the circular ring is instead of the mass fow rate constant during all optimizations. The result from a thermal perspective is an optimal width of the circular ring of nearly zero. The hydraulically optimal inner pipe radius is 54% of the outer pipe radius for laminar fow and 60% for turbulent fow scenarios. Net-exergetic optimization shows a predominant infuence of hydraulic losses, especially for small temperature gains. The exact result depends on the earth’s thermal properties and the fow type. Conclusively, coaxial geothermal probes’ design should focus on the hydraulic optimum and take the thermal optimum as a secondary criterion due to the dominating hydraulics. Y1 - 2021 U6 - http://dx.doi.org/10.1186/s40517-021-00201-3 SN - 2195-9706 N1 - Corresponding author: Tobias Blanke VL - 9 IS - Article number: 19 PB - Springer CY - Berlin ER - TY - CHAP A1 - Kern, Alexander A1 - Meppelink, Jan T1 - Neue Möglichkeiten elektrischer Anschlüsse an die Bewehrung und Untersuchung der Wirkung von Blitzströmen in bewehrtem Beton N2 - Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden. KW - Blitzschutz KW - Stahlbetonkonstruktion KW - Lightning Protection KW - reinforced concrete Y1 - 2001 ER - TY - CHAP A1 - Gellert, Christoph A1 - Norda, Hannah A1 - Butenweg, Christoph T1 - Nonlinear behaviour of masonry under cyclic loading T2 - 7th European Conference on Structural Dynamics, EURODYN 2008 : 7-9 July 2008, Southampton Y1 - 2008 SP - 1 EP - 12 ER - TY - CHAP A1 - Brüssermann, Klaus T1 - Platform of Excellence in "Energy and Environment" N2 - The Ministry of Science and Research in North Rhine-Westphalia created eight platforms of excellence, one in the research area „Energy and Environment“ in 2002 at ACUAS. This platform concentrates the research and development of 13 professors in Jülich and Aachen and of two scientific institutes with different topics: – NOWUM-Energy with emphasis on efficient and economic energy conversion – The Solar Institute Jülich – SIJ – being the largest research institute in the field of renewables at a University of Applied Sciences in Germany With this platform each possible energy conversion – nuclear, fossil, renewable- can be dealt with to help solving the two most important problems of mankind, energy and potable water. At the CSE are presented the historical development, some research results and the combined master studies in „Energy Systems“ and „Nuclear Applications“ KW - Energietechnik KW - Kernenergie KW - Umwelt KW - Energy KW - environment KW - Energy Systems KW - Nuclear Applications Y1 - 2005 ER -