TY - CHAP A1 - Förster, Arnold A1 - Stock, Jürgen A1 - Montanari, Simone A1 - Lepsa, Mihail Ion A1 - Lüth, Hans T1 - Fabrication and characterisation of GaAs Gunn Diode Chips for applications at 77 GHz in automotive industry N2 - GaAs-based Gunn diodes with graded AlGaAs hot electron injector heterostructures have been developed under the special needs in automotive applications. The fabrication of the Gunn diode chips was based on total substrate removal and processing of integrated Au heat sinks. Especially, the thermal and RF behavior of the diodes have been analyzed by DC, impedance and S-parameter measurements. The electrical investigations have revealed the functionality of the hot electron injector. An optimized layer structure could fulfill the requirements in adaptive cruise control (ACC) systems at 77 GHz with typical output power between 50 and 90 mW. KW - Biosensor KW - Gunn diode KW - microwave generation KW - GaAs hot electron injector Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:hbz:a96-opus-1462 ER - TY - JOUR A1 - Gebhardt, Andreas T1 - Rapid Manufacturing - eine interdisziplinäre Strategie N2 - Als um 1987 ein Verfahren namens Stereolithographie und ein Stereolithography Apparatus (SLA) vorgestellt wurden, war der Traum von der Herstellung beliebiger dreidimensionaler Bauteile direkt aus Computerdaten und ohne bauteilspezifische Werkzeuge Realität geworden. Ein Anwendungs-Szenario wurde gleich mitgeliefert. Diese Technologie würde es möglich machen, die gesamte Ersatzteilversorgung der Amerikanischen Pazifikflotte mittels ein paar dieser Maschinen, umfangreicher Datenstätze und genügend Rohmaterial vor Ort auf einem Flugzeugträger direkt nach Bedarf zu fertigen. Diese Vorstellung definierte schon damals die direkte digitale Fertigung, das Rapid Manufacturing. In der Realität bestanden die mit diesem Verfahren hergestellten Bauteile nur aus Kunststoff, waren ungenau, bruchempfindlich und klebrig und allein in der Produktentwicklung, eben als Prototypen zu benutzen. Sie waren schnell verfügbar, weil zu Ihrer Herstellung keine Werkzeuge benötigt wurden. Folgerichtige und zudem modern hießen sie: Rapid Prototyping. Rapid Prototyping wurde schnell zum Synonym eines neuen Zweiges der Fertigungstechnik, der Generativen Fertigungstechnik. Die weitere Entwicklung brachte neue Verfahren, höhere Genauigkeiten, verbesserte Werkstoffe und neue Anwendungen. Die Herstellung von Negativen, also Werkzeugen, mit dem gleichen Verfahren wurde marketing-getrieben Rapid Tooling genannt und als die ersten Bauteile nicht mehr als Prototypen, sondern als Endprodukte eingesetzt wurden, nannte man dies Rapid Manufacturing - das Ziel war erreicht. War das Ziel wirklich erreicht? Ist es Rapid Manufacturing, wenn ein generativ gefertigtes Bauteil die gewünschte Spezifikation erreicht? Was muss passieren, damit aus dem Phänomen Rapid Prototyping eine Strategie wird, die geeignet ist, einen Paradigmenwechsel von der heutigen Hersteller-induzierten Massenproduktion von Massenartikeln zur Verbraucher-induzierten (und verantworteten) Massenproduktion von Einzelteilen für jedermann ermöglichen und möglicherweise unsere Arbeits- und Lebensformen tiefgreifend zu beeinflussen? Im Beitrag wird der Begriff der (Fertigungs-) Strategie „Rapid Manufacturing“ näher beleuchtet. Es wird diskutiert, welche Maßnahmen auf der technischen und der operative Ebene getroffen werden müssen, damit die generative Fertigungstechnik im Sinne dieser Strategie umgesetzt werden kann. Beispiele belegen, dass diese Entwicklung bereits begonnen hat und geben Anregungen für eine konstruktive Diskussion auf der RapidTech 2006. N2 - As a process called stereolithography and a stereolithography apparatus (SLA) was presented in 1987, the dream of manufacturing any three-dimensional component directly from computer data and without component-specific tools became reality. An application scenario was supplied at the same time. This technology would make it possible to produce the entire spare parts requirement of the American Pacific Fleet merely through the use of a couple of such machines, extensive datasets and enough raw material on board an aircraft carrier directly as required. This image defined direct digital fabrication, rapid manufacturing, even at that time. In reality, this procedure only managed to produce components in plastic which were imprecise, fragile and sticky and only usable as prototypes in product development. They were rapidly available, because no tools were required for their manufacture. Consequentially, they are now known as Rapid Prototyping in modern jargon. Rapid Prototyping quickly became a synonym for a new branch of production engineering known as generative production engineering. Continued development brought new processes, improved accuracy, improved materials and new applications. The manufacturing of negatives, in other words tools, using the same procedure was quickly named rapid tooling by the marketing sector, and once the first components were used as final products instead of just prototypes the process was renamed "rapid manufacturing" - the goal had been reached. Was the goal really reached? Is it rapid manufacturing if a generatively manufactured component reaches the required specifications? What has to happen so that the rapid prototyping phenomenon becomes a strategy which is suitable for enabling the paradigm change from current manufacture-induced mass production of mass articles to consumer-induced (and consumer-responsible) mass production of single parts for anyone, and in all possibility makes dramatic changes in our way of working and living? The lecture includes detailed information about the (production) strategy term "rapid manufacturing". We will be discussing which measures need to be taken on the technical and operative level so that generative production engineering can be implemented in the sense of this strategy. Examples will show that this development has already started, and should provoke stimulation leading to constructive discussion during RapidTech 2006. KW - Rapid prototyping KW - Rapid Manufacturing KW - Rapid Prototyping KW - Stereolithographie KW - Generative Fertigungstechnik KW - Rapid prototyping KW - rapid manufacturing Y1 - 2006 ER - TY - CHAP A1 - Gebhardt, Andreas T1 - Technology Diffusion through a Multi-Level Technology Transfer Infrastructure. Contribution to the 1st. All Africa Technology Diffusion Conference Boksburg, South Africa June 12th - 14th 2006 N2 - Table of contents 1. Introduction 2. Multi-level Technology Transfer Infrastructure 2.1 Level 1: University Education – Encourage the Idea of becoming an Entrepreneur 2.2 Level 2: Post Graduate Education – Improve your skills and focus it on a product family. 2.3 Level 3: Birth of a Company – Focus your skills on a product and a market segment. 2.4 Level 4: Ready to stand alone – Set up your own business 2.5 Level 5: Grow to be Strong – Develop your business 2.6 Level 6: Competitive and independent – Stay innovative. 3. Samples 3.1 Sample 1: Laser Processing and Consulting Centre, LBBZ 3.2 Sample 2: Prototyping Centre, CP 4. Funding - Waste money or even lost Money? 5. Conclusion KW - Technologietransfer KW - technology transfer KW - technology diffusion Y1 - 2006 ER - TY - JOUR A1 - Gebhardt, Andreas T1 - Generative Manufacturing of Ceramic Parts "Vision Rapid Prototyping" N2 - Table of Contents Introduction 1. Generative Manufacturing Processes 2. Classification of Generative Manufacturing Processes 3. Application of Generative Processes on the Fabrication of Ceramic Parts 3.1 Extrusion 3.2 3D-Printing 3.3 Sintering – Laser Sintering 3.4 Layer-Laminate Processes 3.5 Stereolithography (sometimes written: Stereo Lithography) 4. Layer Milling 5. Conclusion - Vision KW - Rapid prototyping KW - Rapid Technologie KW - Rapid Prototyping Y1 - 2006 ER - TY - JOUR A1 - Gerhardt, Hans Joachim T1 - Wind- und Temperatureinflüsse bei der Planung von Entrauchungseinrichtungen JF - VFDB-Zeitschrift : Forschung, Technik und Management im Brandschutz. 55 (2006), H. 3 Y1 - 2006 SN - 0042-1804 SP - 115 EP - 121 ER - TY - JOUR A1 - Gerhardt, Hans Joachim A1 - Konrath, B. A1 - Stiel, M. T1 - Anmerkungen zur DIN EN 12101-2 über die Prüfung von natürlichen Rauch- und Wärmeabzugsanlagen (NRGW) JF - VFDB-Zeitschrift : Forschung, Technik und Management im Brandschutz. 55 (2006), H. 3 Y1 - 2006 SN - 0042-1804 SP - 157 EP - 158 ER - TY - JOUR A1 - Giese, S. A1 - Kirsch, Ansgar A1 - Ziegler, M. T1 - Numerische Untersuchung von Schervorgängen mit der Diskrete-Partikel-Methode JF - Bauingenieur : die richtungsweisende Zeitschrift im Bauingenieurswesen ; offizielle Zeitschrift der VDI-Gesellschaft Bautechnik Y1 - 2006 SN - 0005-6650 N1 - Gedruckt in der Bibliothek Bayernallee vorhanden: 13 Z 049-2006 VL - Bd. 81 IS - H. 5 SP - 232 EP - 239 ER - TY - JOUR A1 - Glaser, Markus A1 - Schmitz, Philipp T1 - Privatanleger am Optionsscheinmarkt Y1 - 2006 SP - 1 EP - 46 ER - TY - CHAP A1 - Gobbelé, Dirk T1 - Planung der Umbaumaßnahme Hauptbahnhof Aachen N2 - In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 13-15. Bericht über die infrastrukturellen Maßnahmen zum Umbau des Hauptbahnhofs Aachen. KW - Bauplanung KW - Umbauplanung KW - Verkehrsbau KW - Hauptbahnhof Aachen Y1 - 2006 ER - TY - JOUR A1 - Gossla, Ulrich T1 - Flachdecken aus Stahlfaserbeton JF - Beton- und Stahlbetonbau. 101 (2006), H. 2 Y1 - 2006 SN - 0005-9900 SP - 94 EP - 102 ER - TY - JOUR A1 - Gossla, Ulrich A1 - Stromberg, Michael T1 - Fundamentplatten aus Stahlbeton und Stahlfaserbeton. Experimentelle Untersuchungen zur Gebrauchstauglichkeit und Tragfähigkeit JF - Beton- und Stahlbetonbau. 101 (2006), H. 9 Y1 - 2006 SN - 0005-9900 SP - 670 EP - 680 ER - TY - JOUR A1 - Grajewski, Matthias A1 - Hron, Jaroslav A1 - Turek, Stefan T1 - Numerical analysis for a new non-conforming linear finite element on quadrilaterals JF - Journal of Computational and Applied Mathematics Y1 - 2006 U6 - http://dx.doi.org/10.1016/j.cam.2005.05.024 SN - 0377-0427 VL - 193 IS - 1 SP - 38 EP - 50 ER - TY - BOOK A1 - Grotendorst, Johannes T1 - Computational Nanoscience: Do it yourself! : winter school, 14 - 22 February 2006, Forschungszentrum Jülich, Germany ; lecture notes / Grotendorst, Johannes Y1 - 2006 SN - 3-00-017350-1 N1 - NIC series ; 31 ; Forschungszentrum / John-von-Neumann-Institut für Computing PB - NIC CY - Jülich ER - TY - BOOK A1 - Grotendorst, Johannes T1 - GALA - Grünenthal Applied Life Science Analysis : Bericht ; [Projektdokumentation] / John von Neumann-Institut für Computing (NIC); Zentralinstitut für Angewandte Mathematik. Achim Kless und Johannes Grotendorst (Hrsg.) Y1 - 2006 SN - 3-00-017349-8 N1 - NIC-Serie ; 30 ; John von Neumann-Institut für Computing PB - NIC CY - Jülich ER - TY - JOUR A1 - Grotendorst, Johannes A1 - Scott, Tony C. A1 - Aubert-Frécon, Monique T1 - New Approach for the Electronic Energies of the Hydrogen Molecular Ion / Scott, Tony C. ; Aubert-Frécon, Monique ; Grotendorst, Johannes JF - Chemical Physics. 324 (2006), H. 2/3 Y1 - 2006 SN - 0301-0104 SP - 323 EP - 338 ER - TY - JOUR A1 - Göttsche, Joachim A1 - Gabrysch, K. A1 - Schiller, H. A1 - Schwarzer, Klemens T1 - Energetische Sanierung eines biochemischen Laborgebäudes : Auswirkung bedarfsabhängiger Lüftung mit Wärmerückgewinnung auf den Primärenergieverbrauch JF - Heizungs- und Raumlufttechnik : 1. Fachtagung Leonberg, 31. Januar bis 1. Februar 2006 / VDI-Tage der Gebäudetechnik. VDI-Gesellschaft Technische Gebäudeausrüstung Y1 - 2006 SN - 3-18-091921-3 N1 - Tage der Gebäudetechnik <1, 2006, Leonberg> ; Gesellschaft Technische Gebäudeausrüstung SP - 221 EP - 230 PB - VDI-Verl. CY - Düsseldorf ER - TY - JOUR A1 - Hartung, Frank A1 - Niebert, Norbert A1 - Schieder, Andreas A1 - Rembarz, René T1 - Advances in network-supported media delivery in next-generation mobile systems / Hartung, Frank ; Niebert, Norbert ; Schieder, Andreas ; Rembarz, René ; Schmid, Stefan ; Eggert, Lars JF - IEEE Communications Magazine. 44 (2006), H. 8 Y1 - 2006 SN - 0163-6804 SP - 82 EP - 89 ER - TY - JOUR A1 - Hartung, Frank A1 - Schieder, Andreas A1 - Kampmann, Markus A1 - Vorwerk, Marc T1 - Network Supported Media Delivery in Ambient Networks (Netzwerkunterstützte Medienverteilung) / Schieder, Andreas ; Kampmann, Markus ; Hartung, Frank ; Vorwerk, Marc ; Rembarz, René JF - it - Information Technology . 48 (2006), H. 5 Y1 - 2006 SN - 1611-2776 N1 - in der Bereichsbibliothek Eupener Str. unter der Signatur 23 Z 376 vorhanden SP - 264 EP - 273 ER - TY - BOOK A1 - Havermann, Marc T1 - PIV measurements in shock tunnels : PivNet 2, Final Workshop, Göttingen, 07. - 08.09.2006 Y1 - 2006 N1 - Publication / Institut Franco-Allemand de Recherches de Saint Louis ; 644 PB - ISL CY - Saint-Louis ER - TY - BOOK A1 - Havermann, Marc T1 - PIV measurements of compressible vortex rings generated by a shock tube : 13th International Symposium on Applications of Laser Techniques to Fluid Mechanics, Lisbon, PT, 26-29.06.2006; axe de recherches 2.14 / Haertig, J.; Rey, C.; Havermann, M. Institut Franco-Allemand de Recherches de Saint-Louis Y1 - 2006 N1 - Publication / Institut Franco-Allemand de Recherches de Saint Louis ; 645 PB - ISL CY - Saint-Louis ER -