TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Characteristics of cross-bar block ramp flows T2 - Hydraulic structures into the 21st century : 4th IAHR International Symposium on Hydraulic Structures : 9.-11.2.2012, Porto Y1 - 2012 SN - 978-989-8509-01-7 ER - TY - CHAP A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Comparison of 2D dam-break waves with VOF and SPH method T2 - Proceedings of the 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A11113 PB - Tsinghua Univ. Press CY - Beijing ER - TY - JOUR A1 - Oertel, Mario A1 - Bung, Daniel B. T1 - Stability and scour development of bed material on crossbar block ramps JF - International journal of sediment research N2 - Block ramps are ecologically oriented drop structures with adequate energy dissipation and partially moderate flow velocities. A special case is given with crossbar block ramps, where the upstream and downstream level difference is reduced by a series of basins. To prevent the total structure from failing, the stability of single boulders within the crossbars and the bed material in between must be guaranteed. The present paper addresses the stability of bed material and scour development for various flow regimes. Any bed material erosion may affect the stability of the crossbar boulders, which in turn can result in major damages of the ramp. Therefore new design approaches are developed to choose an appropriate bed material size and to avoid failures of crossbar block ramp structures. Y1 - 2015 U6 - http://dx.doi.org/10.1016/j.ijsrc.2014.12.003 SN - 1001-6279 VL - 30 IS - 4 SP - 344 EP - 350 PB - Elsevier CY - Amsterdam ER - TY - CHAP A1 - Oertel, Mario A1 - Balmes, Jan P. A1 - Bung, Daniel B. T1 - Numerical simulation of erosion processes on crossbar block ramps T2 - E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 8 ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel B. A1 - Schlenkhoff, Andreas T1 - Flash flood awareness and prevention T2 - Water engineering for sustainable environment : 33rd IAHR congress ; 9 - 14 August 2009, Vancouver, British Columbia, Canada Y1 - 2009 SN - 9789078046080 SP - 1 CD-ROM ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel B. ED - Crookston, B. ED - Tullis, B. T1 - Scouring processes downstream a crossbar block ramp BT - Session 3: Scour, erosion, sedimentation T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - http://dx.doi.org/10.15142/T3340628160853 SP - 549 EP - 559 ER - TY - CHAP A1 - Müller, Karsten A1 - Hüben, Susanne T1 - From rehabilitation strategy up to formation of lots : implementation of a computer-aided decision support system T2 - 11th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 31st August to 5th September 2008 Y1 - 2008 ER - TY - CHAP A1 - Müller, Karsten A1 - Fischer, B. T1 - Objective condition assessment of sewer systems T2 - Strategic asset management of water supply and wastewater infrastructures : invited papers from the 2nd IWA Leading Edge Conference on Strategic Asset Management (LESAM), Lisbon, October [17 - 19] 2007 / ed. by Helene Alegre and Maria do Céu Almeida Y1 - 2009 SN - 9781843391869 SP - 521 EP - 534 PB - IWA Publ. CY - London ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - http://dx.doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Merkens, Torsten A1 - Hebel, Christoph T1 - Sharing mobility concepts – flexible, sustainable, smart T2 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG) KW - Sharing mobility KW - electro mobility KW - business models KW - mobility behaviour Y1 - 2021 SN - 978-3-902103-94-9 N1 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG), International Conference, International Collaboration towards Sustainable and Green, Automotive Technology, 21-22 April 2021 Chulalongkorn University, Thailand SP - 43 EP - 44 ER - TY - JOUR A1 - Lopes, Pedro A1 - Leandro, Jorge A1 - Carvalho, Rita F. A1 - Bung, Daniel B. T1 - Alternating skimming flow over a stepped spillway JF - Environmental Fluid Mechanics Y1 - 2017 U6 - http://dx.doi.org/10.1007/s10652-016-9484-x SN - 1573-1510 VL - 17 IS - 2 SP - 303 EP - 322 PB - Springer CY - Berlin ER - TY - CHAP A1 - Lopes, Pedro A1 - Bung, Daniel B. A1 - Leandro, Jorge A1 - Carvalho, Rita F. T1 - The effect of cross-waves in physical stepped spillway models T2 - E-proceedings of the 36th IAHR World Congress ; 28 June - 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 9 ER - TY - JOUR A1 - Leandro, J. A1 - Bung, Daniel B. A1 - Carvalho, R. T1 - Measuring void fraction and velocity fields of a stepped spillway for skimming flow using non-intrusive methods JF - Experiments in fluids Y1 - 2014 U6 - http://dx.doi.org/10.1007/s00348-014-1732-6 SN - 0723-4864 (Print) ; 1432-1114 (Online) IS - 55 SP - Art. 1732 PB - Springer Nature CY - Heidelberg ER - TY - RPRT A1 - Lawson, R.M. A1 - Baddoo, N.R. A1 - Vanier, G. A1 - Döring, Bernd A1 - Kuhnhenne, M. A1 - Nieminen, J. A1 - Beguin, P. A1 - Herbin, S. A1 - Caroli, G. A1 - Adetunji, I. A1 - Kozlowski, A. T1 - Renovation of buildings using steel technologies (Robust) - EUR 25335 N2 - Robust addresses the renovation and improvement of existing residential, industrial and commercial buildings using steel-based technologies, focusing on techniques such as over-cladding, over-roofing and roof-top extensions. Steel-intensive renovation techniques currently on the market were reviewed. Performance criteria were developed for over-cladding systems meeting current regulatory standards, with guidelines on how to achieve appropriate levels of air-tightness. KW - iron and steel industry KW - steel KW - materials technology KW - building materials KW - metal structure KW - building safety KW - testing KW - industrial research Y1 - 2013 SN - 978-92-79-24950-1 U6 - http://dx.doi.org/10.2777/97860 SN - 1831-9424 PB - Publications Office of the European Union CY - Luxembourg ER - TY - JOUR A1 - Kuhnhenne, Markus A1 - Reger, Vitali A1 - Pyschny, Dominik A1 - Döring, Bernd T1 - Influence of airtightness of steel sandwich panel joints on heat losses JF - E3S Web of Conferences 12th Nordic Symposium on Building Physics (NSB 2020) N2 - Energy saving ordinances requires that buildings must be designed in such a way that the heat transfer surface including the joints is permanently air impermeable. The prefabricated roof and wall panels in lightweight steel constructions are airtight in the area of the steel covering layers. The sealing of the panel joints contributes to fulfil the comprehensive requirements for an airtight building envelope. To improve the airtightness of steel sandwich panels, additional sealing tapes can be installed in the panel joint. The influence of these sealing tapes was evaluated by measurements carried out by the RWTH Aachen University - Sustainable Metal Building Envelopes. Different installation situations were evaluated by carrying out airtightness tests for different joint distances. In addition, the influence on the heat transfer coefficient was also evaluated using the Finite Element Method (FEM). The combination of obtained air volume flow and transmission losses enables to create an "effective heat transfer coefficient" due to transmission and infiltration. This summarizes both effects in one value and is particularly helpful for approximate calculations on energy efficiency. Y1 - 2020 U6 - http://dx.doi.org/10.1051/e3sconf/202017205008 VL - 172 IS - Art. 05008 PB - EDP Sciences CY - Les Ulis ER - TY - CHAP A1 - Kuhnhenne, Markus A1 - Döring, Bernd A1 - Pyschny, Dominik A1 - Feldmann, Markus T1 - Energy efficient sandwich construction T2 - Proceedings of the VI International Congress on Architectural Envelopes : 20.6. - 22.6.2012, San Sebastian, Spain Y1 - 2012 SP - 277 EP - 285 PB - ICAE ER - TY - JOUR A1 - Kramer, Matthias A1 - Valero, Daniel A1 - Chanson, Hubert A1 - Bung, Daniel B. T1 - Towards reliable turbulence estimations with phase-detection probes: an adaptive window cross-correlation technique JF - Experiments in Fluids Y1 - 2019 U6 - http://dx.doi.org/10.1007/s00348-018-2650-9 SN - 1432-1114 VL - 60 EP - Article number 2 PB - Springer CY - Berlin ER - TY - JOUR A1 - Kolymbas, Dimitrios A1 - Fellin, W. A1 - Kirsch, Ansgar T1 - Squeezing due to stress relaxation in foliated rock JF - International journal for numerical and analytical methods in geomechanics Y1 - 2006 U6 - http://dx.doi.org/10.1002/nag.530 SN - 1096-9853 (E-Journal); 0363-9061 (Print) VL - Vol. 30 IS - Iss. 13 SP - 1357 EP - 1367 ER - TY - JOUR A1 - Kirstein, Simon A1 - Müller, Karsten A1 - Walecki-Mingers, Mark A1 - Deserno, Thomas M. T1 - Robust adaptive flow line detection in sewer pipes JF - Automation in construction N2 - As part of a novel approach to automatic sewer inspection, this paper presents a robust algorithm for automatic flow line detection. A large image repository is obtained from about 50,000 m sewers to represent the high variability of real world sewer systems. Automatic image processing combines Canny edge detection, Hough transform for straight lines and cost minimization using Dijkstra's shortest path algorithm. Assuming that flow lines are mostly smoothly connected horizontal structures, piecewise flow line delineation is reduced to a process of selecting adjacent line candidates. Costs are derived from the gap between adjacent candidates and their reliability. A single parameter α enables simple control of the algorithm. The detected flow line may precisely follow the segmented edges (α = 0.0) or minimize gaps at joints (α = 1.0). Both, manual and ground truth-based analysis indicate that α = 0.8 is optimal and independent of the sewer's material. The algorithm forms an essential step to further automation of sewer inspection. Y1 - 2012 U6 - http://dx.doi.org/10.1016/j.autcon.2011.05.009 SN - 1872-7891 (E-Journal) ; 0926-5805 (Print) IS - 21 SP - 24 EP - 31 PB - Elsevier CY - Amsterdam ER - TY - CHAP A1 - Kirsch, Ansgar A1 - Marcher, Thomas T1 - Numerical prediction of time-dependent rock swelling based on an example of a major tunnel project in Ontario/Canada T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 297 EP - 302 PB - Taylor and Francis CY - London ER -