TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel Bernhard A1 - Schlenkhoff, Andreas T1 - Flash flood awareness and prevention T2 - Water engineering for sustainable environment : 33rd IAHR congress ; 9 - 14 August 2009, Vancouver, British Columbia, Canada Y1 - 2009 SN - 9789078046080 SP - 1 CD-ROM ER - TY - CHAP A1 - Oertel, M. A1 - Bung, Daniel Bernhard ED - Crookston, B. ED - Tullis, B. T1 - Scouring processes downstream a crossbar block ramp BT - Session 3: Scour, erosion, sedimentation T2 - Hydraulic Structures and Water System Management. 6th IAHR International Symposium on Hydraulic Structures, Portland, OR, 27-30 June 2016 Y1 - 2016 SN - 978-1-884575-75-4 U6 - https://doi.org/10.15142/T3340628160853 SP - 549 EP - 559 ER - TY - CHAP A1 - Müller, Karsten A1 - Hüben, Susanne T1 - From rehabilitation strategy up to formation of lots : implementation of a computer-aided decision support system T2 - 11th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 31st August to 5th September 2008 Y1 - 2008 ER - TY - CHAP A1 - Müller, Karsten A1 - Fischer, B. T1 - Objective condition assessment of sewer systems T2 - Strategic asset management of water supply and wastewater infrastructures : invited papers from the 2nd IWA Leading Edge Conference on Strategic Asset Management (LESAM), Lisbon, October [17 - 19] 2007 / ed. by Helene Alegre and Maria do Céu Almeida Y1 - 2009 SN - 9781843391869 SP - 521 EP - 534 PB - IWA Publ. CY - London ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Merkens, Torsten A1 - Hebel, Christoph T1 - Sharing mobility concepts – flexible, sustainable, smart T2 - Proceedings of the 1st UNITED – Southeast Asia Automotive Interest Group (SAIG) International Conference KW - Sharing mobility KW - electro mobility KW - business models KW - mobility behaviour Y1 - 2021 SN - 978-3-902103-94-9 N1 - 1st UNITED-SAIG International Conference, 21-22 APR 2021, Chulalongkorn University, Thailand SP - 43 EP - 44 ER - TY - CHAP A1 - Lopes, Pedro A1 - Bung, Daniel Bernhard A1 - Leandro, Jorge A1 - Carvalho, Rita F. T1 - The effect of cross-waves in physical stepped spillway models T2 - E-proceedings of the 36th IAHR World Congress ; 28 June - 3 July, 2015, The Hague, the Netherlands Y1 - 2015 SP - 1 EP - 9 ER - TY - CHAP A1 - Langohr, Philipp A1 - Bung, Daniel Bernhard A1 - Crookston, Brian M. ED - Ortega-Sánchez, Miguel T1 - Hybrid investigation of labyrinth weirs: Discharge capacity and energy dissipation T2 - Proceedings of the 39th IAHR World Congress N2 - The replacement of existing spillway crests or gates with labyrinth weirs is a proven techno-economical means to increase the discharge capacity when rehabilitating existing structures. However, additional information is needed regarding energy dissipation of such weirs, since due to the folded weir crest, a three-dimensional flow field is generated, yielding more complex overflow and energy dissipation processes. In this study, CFD simulations of labyrinth weirs were conducted 1) to analyze the discharge coefficients for different discharges to compare the Cd values to literature data and 2) to analyze and improve energy dissipation downstream of the structure. All tests were performed for a structure at laboratory scale with a height of approx. P = 30.5 cm, a ratio of the total crest length to the total width of 4.7, a sidewall angle of 10° and a quarter-round weir crest shape. Tested headwater ratios were 0.089 ≤ HT/P ≤ 0.817. For numerical simulations, FLOW-3D Hydro was employed, solving the RANS equations with use of finite-volume method and RNG k-ε turbulence closure. In terms of discharge capacity, results were compared to data from physical model tests performed at the Utah Water Research Laboratory (Utah State University), emphasizing higher discharge coefficients from CFD than from the physical model. For upstream heads, some discrepancy in the range of ± 1 cm between literature, CFD and physical model tests was identified with a discussion regarding differences included in the manuscript. For downstream energy dissipation, variable tailwater depths were considered to analyze the formation and sweep-out of a hydraulic jump. It was found that even for high discharges, relatively low downstream Froude numbers were obtained due to high energy dissipation involved by the three-dimensional flow between the sidewalls. The effects of some additional energy dissipation devices, e.g. baffle blocks or end sills, were also analyzed. End sills were found to be non-effective. However, baffle blocks with different locations may improve energy dissipation downstream of labyrinth weirs. Y1 - 2022 SN - 978-90-832612-1-8 U6 - https://doi.org/10.3850/IAHR-39WC252171192022738 SN - 2521-7119 (print) SN - 2521-716X (online) N1 - 39th IAHR World Congress, 19. - 24. Juni 2022, Granada SP - 2313 EP - 2318 PB - International Association for Hydro-Environment Engineering and Research (IAHR) CY - Madrid ER - TY - CHAP A1 - Kuhnhenne, Markus A1 - Döring, Bernd A1 - Pyschny, Dominik A1 - Feldmann, Markus T1 - Energy efficient sandwich construction T2 - Proceedings of the VI International Congress on Architectural Envelopes : 20.6. - 22.6.2012, San Sebastian, Spain Y1 - 2012 SP - 277 EP - 285 PB - ICAE ER - TY - CHAP A1 - Kirsch, Ansgar A1 - Marcher, Thomas T1 - Numerical prediction of time-dependent rock swelling based on an example of a major tunnel project in Ontario/Canada T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 297 EP - 302 PB - Taylor and Francis CY - London ER - TY - CHAP A1 - Kirsch, Ansgar A1 - Felber, W. A1 - Marcher, Thomas A1 - Fuchs, W. T1 - Geotechnical challenges during design and construction of a ski resort in Azerbaijan T2 - Geotechnics of roads and railways : proceedings of the 15th Danube - European Conference on Geotechnical Engineering : 9-11 September 2014, Vienna, Austria Y1 - 2014 SN - 978‐3‐902593‐01‐6 SP - 757 EP - 762 PB - ÖIAV - Österreichischer Ingenieur- und Architekten-Verein CY - Wien ER - TY - CHAP A1 - Kirsch, Ansgar T1 - Numerical investigation of the face stability of shallow tunnels in sand T2 - Numerical methods in geotechnical engineering : (NUMGE 2010) : proceedings of the seventh European Conference on Numerical Methods in Geotechnical Engineering, Trondheim, Norway, 2 - 4 June 2010 / ed. by Thomas Benz ... Y1 - 2010 SN - 978-0-415-59239-0 SP - 779 EP - 784 PB - Taylor and Francis CY - London ER - TY - CHAP A1 - Kirsch, Ansgar T1 - Experimental and numerical investigation of the face stability of shallow tunnels in sand T2 - Safe tunnelling for the city and environment : proceedings of the World Tunnel Congress 2009, Budapest, Hungary, 23 to 28 September 2009 / organised by International Tunnelling and Underground Space Association ... Y1 - 2009 SP - 1 EP - 8 PB - Hungarian Tunnelling Association CY - Budapest ER - TY - CHAP A1 - Kerpen, Nils B. A1 - Bung, Daniel Bernhard A1 - Valero, Daniel A1 - Schlurmann, Torsten T1 - Energy dissipation within the wave run-up at stepped revetments T2 - 8th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering, Qingdao, China KW - energy disspation KW - wave run-up KW - friction Y1 - 2016 ER - TY - CHAP A1 - Kerpen, N. B. A1 - Bung, Daniel Bernhard A1 - Schlurmann, Torsten ED - Janssen, Robert T1 - Physical model investigations of ships passing through a lock T2 - Hydraulic structures: useful water harvesting systems or relics? : Third International Junior Researcher and Engineer Workshop on Hydraulic Structures (IJREWHS'10) : Edinburgh, Scotland, U.K., 2-3 May 2010 Y1 - 2010 SN - 9781742720159 SP - 93 EP - 100 PB - School of Civil Engineeering, The University of Queensland CY - Brisbane ER - TY - CHAP A1 - Kerpen, N. B. A1 - Bung, Daniel Bernhard A1 - Schlurmann, Torsten T1 - Physical model investigations of pressure distributions next to ships passing through a lock T2 - 5th Chinese-German Joint Symposium on Hydraulic and Ocean Engineering : CG JOINT 2010 Y1 - 2010 SN - 978-7-5618-3671-2 SP - 514 EP - 519 PB - Univ. Press CY - Tianjin ER - TY - CHAP A1 - Jockwer, R. A1 - Kleiber, M. A1 - Uibel, Thomas ED - Görlacher, Rainer T1 - Criteria for Evaluating the Simplification of Design Rules for Dowel-type Fasteners T2 - International Network on Timber Engineering Research, INTER : proceedings, meeting 51, 10 - 13 August 2016, Tallinn, Estonia Y1 - 2018 SP - 461 EP - 466 PB - Timber Scientific Publishing, KIT Holzbau und Baukonstruktionen CY - Karlsruhe ER - TY - CHAP A1 - Heinz, G. A1 - Oertel, Mario A1 - Bung, Daniel Bernhard ED - Janssen, Robert T1 - Investigations on a cooling water system for a gas tubine facility concerning air vortexes and sediment transport T2 - Hydraulic structures: useful water harvesting systems or relics? : Third International Junior Researcher and Engineer Workshop on Hydraulic Structures (IJREWHS'10) : Edinburgh, Scotland, U.K., 2-3 May 2010 Y1 - 2010 SN - 9781742720159 SP - 109 EP - 116 PB - School of Civil Engineering, The University of Queensland CY - Brisbane ER - TY - CHAP A1 - Gogolin, C. A1 - Carvalho, R. A1 - Bung, Daniel Bernhard A1 - Matos, J. T1 - Experimental and numerical investigation of steady and unsteady flows in roughened channels with cross beams T2 - 35th IAHR world congress : 8.-13.9.2013, Chengdu, China Y1 - 2013 SP - Artikelkennnummer: A10837C PB - Tsinghua Univ. Press CY - Beijing ER - TY - CHAP A1 - Ganegedara, H. A1 - Alahakoon, D. A1 - Mashford, J. A1 - Paplinski, A. A1 - Müller, Karsten A1 - Deserno, T. M. T1 - Self organising map based region of interest labelling for automated defect identification in large sewer pipe image collections T2 - The 2012 International Joint Conference on Neural Networks (IJCNN) : 10 - 15 June 2012, Brisbane, Australia ; [part of the] 2012 IEEE World Congress on Computational Intelligence (IEEE-WCCI 2012) Y1 - 2012 SN - 978-1-4673-1490-9 PB - IEEE CY - Piscataway, NJ ER -