TY - JOUR A1 - Loeb, Horst Wolfgang A1 - Schartner, Karl-Heinz A1 - Dachwald, Bernd A1 - Ohndorf, Andreas A1 - Seboldt, Wolfgang T1 - Interstellar heliopause probe JF - Труды МАИ N2 - There is common agreement within the scientific community that in order to understand our local galactic environment it will be necessary to send a spacecraft into the region beyond the solar wind termination shock. Considering distances of 200 AU for a new mission, one needs a spacecraft traveling at a speed of close to 10 AU/yr in order to keep the mission duration in the range of less than 25 yrs, a transfer time postulated by European Space Agency (ESA). Two propulsion options for the mission have been proposed and discussed so far: the solar sail propulsion and the ballistic/radioisotope-electric propulsion (REP). As a further alternative, we here investigate a combination of solar-electric propulsion (SEP) and REP. The SEP stage consists of six 22-cms diameter RIT-22 ion thrusters working with a high specific impulse of 7377 s corresponding to a positive grid voltage of 5 kV. Solar power of 53 kW at begin of mission (BOM) is provided by a lightweight solar array. Y1 - 2012 IS - 60 SP - 2 EP - 2 PB - Moskauer Staatliches Luftfahrtinstitut (МАИ) CY - Moskau ER - TY - JOUR A1 - Herzwurm, Georg A1 - Krams, Benedikt A1 - Pietsch, Wolfram A1 - Schockert, Sixten T1 - Report from the 3rd international workshop on requirements prioritization for customer oriented software development (RePriCo’12) JF - ACM SIGSOFT Software Engineering Notes N2 - Prioritization is an essential task within requirements engineering to cope with complexity and to establish focus properly. The 3rd Workshop on Requirements Prioritization for customer oriented Software Development (RePriCo’12) focused on requirements prioritization and adjacent themes in the context of customer oriented development of bespoke and standard software. Five submissions have been accepted for the proceedings and for presentation. The report summarizes and points out key findings. KW - Requirements relations KW - Discourse ethics KW - Tool support KW - Consensus KW - Requirements prioritization Y1 - 2012 U6 - http://dx.doi.org/10.1145/2237796.2237817 SN - 0163-5948 VL - 37 IS - 4 SP - 32 EP - 34 PB - Association for Computing Machinery CY - New York ER -