TY - CHAP A1 - Bung, Daniel Bernhard A1 - Oertel, Mario T1 - Manipulation of non-aerated cavity flow on a stepped spillway model T2 - 3rd European IAHR Congress : April 14 – 16, 2014, Porto Y1 - 2014 PB - Univ. of Porto CY - Porto ER - TY - JOUR A1 - Lohse, Wolfram T1 - Kippnachweise nach DIN 4114 und Entwurf DIN 18800 Teil 2 - ein Hinweis für die Praxis JF - Schweissen und Schneiden : Fachzeitschrift für Schweißen und verwandte Verfahren / Hrsg.: DVS - Deutscher Verband für Schweißen und Verwandte Verfahren e.V.. 41 (1989), H. 9 Y1 - 1989 SN - 0036-7184 SP - 459 EP - 462 ER - TY - BOOK A1 - Lohse, Wolfram A1 - Laumann, Jörg A1 - Wolf, Christian T1 - Stahlbau 2 Y1 - 2020 SN - 978-3-8348-2116-4 SN - 978-3-8348-1511-8 U6 - https://doi.org/10.1007/978-3-8348-2116-4 PB - Springer Vieweg CY - Wiesbaden ET - 21., vollst. akt. und überarb. Aufl. ER - TY - CHAP A1 - Mohan, Nijanthan A1 - Groß, Rolf Fritz A1 - Menzel, Karsten A1 - Theis, Fabian T1 - Opportunities and Challenges in the Implementation of Building Information Modeling for Prefabrication of Heating, Ventilation and Air Conditioning Systems in Small and Medium-Sized Contracting Companies in Germany – A Case Study T2 - WIT Transactions on The Built Environment, Vol. 205 N2 - Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany. KW - building information modelling KW - HVAC KW - prefabrication KW - construction KW - small and medium scaled companies Y1 - 2021 U6 - https://doi.org/10.2495/BIM210101 SN - 1743-3509 N1 - 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations, 1–3 September 2021. Santiago de Compostela, Spain SP - 117 EP - 126 PB - WIT Press CY - Southampton ER - TY - CHAP A1 - Streit, Wilfried T1 - Kalkulation T2 - Zahlentafeln für den Baubetrieb N2 - Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle. Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt. Y1 - 2016 SN - 978-3-658-02838-1 (Online) SN - 978-3-658-02837-4 (Print) U6 - https://doi.org/10.1007/978-3-658-02838-1_13 SP - 1391 EP - 1501 PB - Springer Vieweg CY - Wiesbaden ET - 9., überarb. und aktual. Aufl. ER - TY - JOUR A1 - Cheenakula, Dheeraja A1 - Paulsen, Svea A1 - Ott, Fabian A1 - Grömping, Markus T1 - Operational window of a deammonifying sludge for mainstream application in a municipal wastewater treatment plant JF - Water and Environment Journal N2 - The present work aimed to study the mainstream feasibility of the deammonifying sludge of side stream of municipal wastewater treatment plant (MWWTP) in Kaster, Germany. For this purpose, the deammonifying sludge available at the side stream was investigated for nitrogen (N) removal with respect to the operational factors temperature (15–30°C), pH value (6.0–8.0) and chemical oxygen demand (COD)/N ratio (≤1.5–6.0). The highest and lowest N-removal rates of 0.13 and 0.045 kg/(m³ d) are achieved at 30 and 15°C, respectively. Different conditions of pH and COD/N ratios in the SBRs of Partial nitritation/anammox (PN/A) significantly influenced both the metabolic processes and associated N-removal rates. The scientific insights gained from the current work signifies the possibility of mainstream PN/A at WWTPs. The current study forms a solid basis of operational window for the upcoming semi-technical trails to be conducted prior to the full-scale mainstream PN/A at WWTP Kaster and WWTPs globally. KW - Anammox KW - Mainstream KW - Nitrogen removal KW - Partial nitritation KW - Wastewater Y1 - 2023 U6 - https://doi.org/10.1111/wej.12898 SN - 1747-6593 N1 - Corresponding author: Dheeraja Cheenakula VL - 38 IS - 1 SP - 59 EP - 70 PB - Wiley CY - Chichester ER - TY - CHAP A1 - Streit, Wilfried T1 - Kalkulation T2 - Übungsaufgaben und Berechnungen für den Baubetrieb Y1 - 2019 SN - 978-3-658-23127-9 U6 - https://doi.org/10.1007/978-3-658-23127-9_11 SP - 273 EP - 334 PB - Springer Vieweg CY - Wiesbaden ER - TY - BOOK A1 - Uibel, Thomas A1 - Peterson, Leif Arne ED - Uibel, Thomas ED - Peterson, Leif Arne T1 - Tagungsband Aachener Holzbautagung 2019 Y1 - 2019 SN - 2197-4489 PB - FH Aachen CY - Aachen ER - TY - CHAP A1 - Langohr, Philipp A1 - Bung, Daniel Bernhard A1 - Crookston, Brian M. ED - Ortega-Sánchez, Miguel T1 - Hybrid investigation of labyrinth weirs: Discharge capacity and energy dissipation T2 - Proceedings of the 39th IAHR World Congress N2 - The replacement of existing spillway crests or gates with labyrinth weirs is a proven techno-economical means to increase the discharge capacity when rehabilitating existing structures. However, additional information is needed regarding energy dissipation of such weirs, since due to the folded weir crest, a three-dimensional flow field is generated, yielding more complex overflow and energy dissipation processes. In this study, CFD simulations of labyrinth weirs were conducted 1) to analyze the discharge coefficients for different discharges to compare the Cd values to literature data and 2) to analyze and improve energy dissipation downstream of the structure. All tests were performed for a structure at laboratory scale with a height of approx. P = 30.5 cm, a ratio of the total crest length to the total width of 4.7, a sidewall angle of 10° and a quarter-round weir crest shape. Tested headwater ratios were 0.089 ≤ HT/P ≤ 0.817. For numerical simulations, FLOW-3D Hydro was employed, solving the RANS equations with use of finite-volume method and RNG k-ε turbulence closure. In terms of discharge capacity, results were compared to data from physical model tests performed at the Utah Water Research Laboratory (Utah State University), emphasizing higher discharge coefficients from CFD than from the physical model. For upstream heads, some discrepancy in the range of ± 1 cm between literature, CFD and physical model tests was identified with a discussion regarding differences included in the manuscript. For downstream energy dissipation, variable tailwater depths were considered to analyze the formation and sweep-out of a hydraulic jump. It was found that even for high discharges, relatively low downstream Froude numbers were obtained due to high energy dissipation involved by the three-dimensional flow between the sidewalls. The effects of some additional energy dissipation devices, e.g. baffle blocks or end sills, were also analyzed. End sills were found to be non-effective. However, baffle blocks with different locations may improve energy dissipation downstream of labyrinth weirs. Y1 - 2022 SN - 978-90-832612-1-8 U6 - https://doi.org/10.3850/IAHR-39WC252171192022738 SN - 2521-7119 (print) SN - 2521-716X (online) N1 - 39th IAHR World Congress, 19. - 24. Juni 2022, Granada SP - 2313 EP - 2318 PB - International Association for Hydro-Environment Engineering and Research (IAHR) CY - Madrid ER - TY - CHAP A1 - Crookston, Brian M. A1 - Bung, Daniel Bernhard ED - Ortega-Sánchez, Miguel T1 - Application of RGB-D cameras in hydraulic laboratory studies T2 - Proceedings of the 39th IAHR World Congress N2 - Non-intrusive measuring techniques have attained a lot of interest in relation to both hydraulic modeling and prototype applications. Complimenting acoustic techniques, significant progress has been made for the development of new optical methods. Computer vision techniques can help to extract new information, e. g. high-resolution velocity and depth data, from videos captured with relatively inexpensive, consumer-grade cameras. Depth cameras are sensors providing information on the distance between the camera and observed features. Currently, sensors with different working principles are available. Stereoscopic systems reference physical image features (passive system) from two perspectives; in order to enhance the number of features and improve the results, a sensor may also estimate the disparity from a detected light to its original projection (active stereo system). In the current study, the RGB-D camera Intel RealSense D435, working on such stereo vision principle, is used in different, typical hydraulic modeling applications. All tests have been conducted at the Utah Water Research Laboratory. This paper will demonstrate the performance and limitations of the RGB-D sensor, installed as a single camera and as camera arrays, applied to 1) detect the free surface for highly turbulent, aerated hydraulic jumps, for free-falling jets and for an energy dissipation basin downstream of a labyrinth weir and 2) to monitor local scours upstream and downstream of a Piano Key Weir. It is intended to share the authors’ experiences with respect to camera settings, calibration, lightning conditions and other requirements in order to promote this useful, easily accessible device. Results will be compared to data from classical instrumentation and the literature. It will be shown that even in difficult application, e. g. the detection of a highly turbulent, fluctuating free-surface, the RGB-D sensor may yield similar accuracy as classical, intrusive probes. Y1 - 2022 SN - 978-90-832612-1-8 U6 - https://doi.org/10.3850/IAHR-39WC252171192022964 SN - 2521-7119 (print) SN - 2521-716X (online) N1 - 39th IAHR World Congress, 19. - 24. Juni 2022, Granada SP - 5127 EP - 5133 PB - International Association for Hydro-Environment Engineering and Research (IAHR) CY - Madrid ER - TY - BOOK A1 - Jochim, Haldor E. A1 - Lademann, Frank T1 - Planung von Bahnanlagen: Grundlagen - Planung - Berechnung Y1 - 2018 SN - 978-3-446-44220-7 U6 - https://doi.org/10.3139/9783446448940 PB - Fachbuchverlag Leipzig im Carl Hanser Verlag CY - München ET - 2., aktualisierte und erweiterte Auflage ER - TY - CHAP A1 - Duffner, Markus A1 - Uibel, Thomas A1 - Peterson, Leif Arne A1 - Moorkamp, Wilfried ED - Fouad, Nabil A. T1 - Cross Layers Light – Ein ressourceneffizientes und recyclebares Holz-Wandsystem T2 - Bauphysik Kalender 2023: Nachhaltigkeit N2 - Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht. Y1 - 2023 SN - 9783433033890 (Print) SN - 9783433611289 (Online) U6 - https://doi.org/10.1002/9783433611289.ch13 SP - 483 EP - 501 PB - Ernst & Sohn CY - Berlin ER - TY - BOOK A1 - Uibel, Thomas A1 - Peterson, Leif Arne ED - Uibel, Thomas ED - Peterson, Leif Arne T1 - Tagungsband Aachener Holzbautagung 2023 Y1 - 2023 SN - 2197-4489 PB - FH Aachen CY - Aachen ER - TY - CHAP A1 - Uibel, Thomas A1 - Blaß, Hans Joachim T1 - A new method to determine suitable spacings and distances for self-tapping screws T2 - Meeting ... / International Council for Research and Innovation in Building and Construction, Working Commission W18 - Timber Structures N2 - The determination of spacing, edge and end distance requirements for self-tapping screws requires numerous and comprehensive insertion tests. Yet the results of such tests cannot be transferred to other types of screws or even to screws of different diameter because of differences in shape or geometry. To reduce the effort of insertion tests a new method was developed which allows the estimation of required spacings, distances and timber thickness. Y1 - 2010 SN - 1864-1784 N1 - Paper 43-21-2 VL - 43 PB - Lehrstuhl für Ingenieurholzbau und Baukonstruktionen CY - Karlsruhe ER - TY - CHAP A1 - Peterson, Leif Arne ED - Schlüter, Dominik T1 - Holzbau T2 - Wofür braucht man das eigentlich? Ein Handbuch für Mathematiklehrkräfte der Sekundarstufe I und II Y1 - 2021 SN - 978-3-7543-2606-0 SP - 21 EP - 23 PB - BoD CY - Norderstedt ER - TY - JOUR A1 - Reger, Vitali A1 - Kuhnhenne, Markus A1 - Hachul, Helmut A1 - Döring, Bernd A1 - Blanke, Tobias A1 - Göttsche, Joachim T1 - Plusenergiegebäude 2.0 in Stahlleichtbauweise JF - Stahlbau Y1 - 2019 U6 - https://doi.org/10.1002/stab.201900034 SN - 1437-1049 (E-journal), 0038-9145 (print) VL - 88 IS - 6 SP - 522 EP - 528 PB - Ernst & Sohn CY - Berlin ER - TY - JOUR A1 - Peterson-Oster, Madeleine A1 - Peterson, Leif Arne T1 - Gewerbebau: Modellprojekt mit neuem elementiertem, freistehendem Fassadensystem JF - Bauen mit Holz, Der Zimmermann N2 - Die im Zuge einer Betriebsübergabe anstehende Baumaßnahmen am eigenen Büro- und Produktionsgebäude boten ideale Voraussetzung zur Anwendung einer raum­-kreierenden Außenhaut. Mit der elementierten, freistehenden Eichenholz-Fassade wurde ein bis dahin weitgehend funktionales Bauwerk substanzschonend und zugleich optisch ansprechender umgestaltet. Y1 - 2020 SN - 0005-6545 PB - Rudolf Müller CY - Köln ER - TY - JOUR A1 - Peterson-Oster, Madeleine A1 - Peterson, Leif Arne T1 - Fassadensystem: Optisch ansprechend, freistehend, elementiert und aus Eichenholz JF - Bauen mit Holz, Der Zimmermann N2 - Bei der Entwicklung des Fassadensystems ging es darum die mögliche Dauerhaftigkeit von Holz bei direkter Bewitterung zu maximieren. Gleichzeitig soll gezeigt werden, dass mittels durchdachter Ansätze beim konstruktiven Holzschutz und die Wahl einer geeigneten Holzart langlebige Konstruktionen realisiert werden können. Y1 - 2020 SN - 0005-6545 PB - Rudolf Müller CY - Köln ER - TY - CHAP A1 - Moorkamp, Wilfried A1 - Peterson, Leif Arne A1 - Uibel, Thomas ED - Wehren, Cedric T1 - Standardholzbrücken für kommunale Geh- und Radwege T2 - Strukturen, Formen und Prinzipien : Festschrift zum 60. Geburtstag von Univ.-Prof. Dr.-Ing. Martin Trautz Y1 - 2023 SN - 978-3-95886-500-6 SP - 140 EP - 165 PB - RWTH Aachen CY - Aachen ER - TY - JOUR A1 - Laumann, Jörg A1 - Mainz, Stefan T1 - Direkte Ermittlung der erforderlichen Einspanntiefe von I‑förmigen Stahlquerschnitten in Betonkonstruktionen N2 - Für die Ermittlung der erforderlichen Einspanntiefe von eingespannten Stahlquerschnitten in Betonkonstruktionen existieren verschiedene Bemessungsmodelle. Diese basieren vorwiegend auf Grundlage nationaler Normen wie z. B. DIN 18800 [1] und DIN 1045 [2], die durch die europäische Normung ersetzt wurden. Aus diesem Grund wird in diesem Aufsatz ein Berechnungsmodell für die erforderliche Einspanntiefe von eingespannten Stahlquerschnitten in Betonkonstruktionen auf Grundlage des Eurocodes vorgestellt. Das Grundgerüst für dieses Berechnungsmodell bildet das Verfahren nach Kindmann und Laumann, welches in [3] behandelt wurde. Gleichzeitig werden neue Formeln zur direkten Ermittlung der Mindesteinspanntiefe vorgestellt. Behandelt werden gewalzte I-Profile für einachsige Biegung um die starke Achse (y-y) mit Drucknormalkraft. Y1 - 2012 U6 - https://doi.org/10.1002/stab.201201620 SN - 1437-1049 VL - 81 IS - 11 SP - 850 EP - 860 PB - Wiley CY - Weinheim ER - TY - RPRT A1 - Fischedick, Manfred A1 - Schoof, René A1 - Hebel, Christoph A1 - Merkens, Torsten T1 - Sektorenkopplung als Herausforderung und Chance für das Energieland NRW : Handlungsoptionen und Ergebnispapier der Expertengruppe AG 4 „Sektoren- kopplung“ im Netzwerk Netze und Speicher der EnergieAgentur.NRW im Auftrag des Landes Nordrhein-Westfalen / EnergieAgentur.NRW GmbH Y1 - 2018 ER -