TY - CHAP
A1 - Dielmann, Klaus-Peter
T1 - Umsetzung Strom-/Gasmarkt nach der Liberalisierung
N2 - Neues Energierecht Strom Neues Energierecht Gas Emissionshandel in Europa - ein interessanter Markt?
KW - Energierecht
KW - Elektrizität
KW - Gas
KW - Emissionshandel
Y1 - 2001
ER -
TY - JOUR
A1 - Schöning, Michael Josef
A1 - Schubert, Joachim P.
A1 - Kloock, Joachim P.
A1 - Zander, W.
A1 - Mourzina, Y. G.
A1 - Legin, A.
A1 - Vlasov, Y. G.
A1 - Lüth, H.
T1 - Innovative thin film techniques for microfabricating electrochemical sensors
JF - Biocybernetics and Biomedical Engineering. 21 (2001), H. 4
Y1 - 2001
SN - 0208-5216
SP - 107
EP - 119
ER -
TY - JOUR
A1 - Schroth, P.
A1 - Weißbecker, B.
A1 - Schütz, S.
A1 - Ecken, H.
A1 - Yoshinobu, T.
A1 - Lüth, H.
A1 - Schöning, Michael Josef
T1 - Bioelectronic signal processing - intact chemoreceptors coupled to field-effect devices
JF - Biocybernetics and Biomedical Engineering. 21 (2001), H. 3
Y1 - 2001
SN - 0208-5216
SP - 27
EP - 42
ER -
TY - JOUR
A1 - Schöning, Michael Josef
A1 - Lüth, H.
T1 - Novel concepts for silicon-based biosensors
JF - Physica Status Solidi (A) (2001)
Y1 - 2001
SN - 0031-8965
SP - 65
EP - 77
ER -
TY - JOUR
A1 - Kern, Alexander
A1 - Krichel, Frank
A1 - Neskakis, Apostolos
A1 - Müller, Klaus-Peter (u.a.)
T1 - Lightning protection design of a renewable energy hybrid-system without power mains connection
Y1 - 2001
N1 - International Conference on Renewable Energies for Islands <2001, Crete>
ER -
TY - JOUR
A1 - Schulte-Zurhausen, Manfred
T1 - Schnittstelle Marketing und Organisation
JF - Organisationsgestaltung in marktorientierten Unternehmen
Y1 - 2001
SN - 3-7938-7240-8
SP - 17
EP - 47
PB - Sauer
CY - Heidelberg
ER -
TY - JOUR
A1 - Gebhardt, Andreas
T1 - Rapid Prototyping and PIV
Y1 - 2001
N1 - Workshop on Industrial Applications of Particle Image Velocimetry <2001, Köln>
ER -
TY - JOUR
A1 - Gebhardt, Andreas
T1 - Laserwelding with fillerwire
JF - LIA handbook of laser material processing / Laser Institute of America
Y1 - 2001
SN - 3-540-41770-2
N1 - Chapter 11.2.12
CY - Orlando, Florida
ER -
TY - JOUR
A1 - Krause, Gregor
A1 - Peifer, Hermann-Josef
A1 - Rütten, Jan
T1 - Wo bleibt das intelligente Haus?
JF - Elektor (2001)
Y1 - 2001
N1 - Printausgabe in Bibliothek Eupener Str.: 23 Z 091
SP - 38
EP - 42
ER -
TY - JOUR
A1 - Krause, Gregor
T1 - Verhandeln statt Energiesparen? Über den Umgang mit Preisnachlässen im Energiebereich
JF - extrACT: Das Magazin der Fachhochschule Aachen (2001)
Y1 - 2001
SP - 22
EP - 23
ER -
TY - JOUR
A1 - Gauchel, Joachim
T1 - Automatisierte Montageanlage im FB8 - Eine lohnende Investition
JF - FH Fachblatt (2001)
Y1 - 2001
SP - 12
EP - 12
ER -
TY - BOOK
A1 - Mühl, Thomas
T1 - Einführung in die elektrische Messtechnik: mit 8 Tabellen
Y1 - 2001
SN - 3-519-06388-3
N1 - neuere Aufl. vorhanden
PB - Teubner
CY - Stuttgart [u.a.]
ER -
TY - BOOK
A1 - Knepper, Ludger
T1 - Entwicklung neuer Generalbebauungsplan für ein Industrieunternehmen
Y1 - 2001
N1 - Bericht Lehrgebiet Produktionslogistik der Fachhochschule Aachen
CY - FH Aachen
ER -
TY - JOUR
A1 - Grundmann, Reinhard
A1 - Kramer, C.
A1 - Konrath, B.
T1 - Der Aeroakustik-Fahrzeugwindkanal von Ford.
JF - Automobiltechnische Zeitschrift - ATZ. 103 (2001), H. 10
Y1 - 2001
SN - 0001-2785
SP - 932
EP - 938
ER -
TY - BOOK
A1 - Timme, Michael
T1 - Die juristische Bewältigung des ökonomischen Netzwerkgutes : Epidemieprävention in Rechtsgeschichte und Gegenwart / Michael Timme
Y1 - 2001
SN - 3-7890-7055-6
N1 - Common goods ; Vol. 2 ; Zugl.: Osnabrück, Univ., Diss., 1999
PB - Nomos-Verl.-Ges.
CY - Baden-Baden
ER -
TY - JOUR
A1 - Timme, Michael
T1 - Schadensersatzanspruch des nichtbelieferten Käufers bei einem Sukzessivlieferungsvertrag
JF - Juristische Schulung (2001)
Y1 - 2001
SP - 1060
EP - 1063
ER -
TY - JOUR
A1 - Timme, Michael
T1 - Zur Auslegung des § 284 Abs.3 Satz 1 BGB
JF - Juristische Arbeitsblätter (2001)
Y1 - 2001
SP - 31
EP - 33
ER -
TY - JOUR
A1 - Timme, Michael
T1 - Zur Verwirkung des Mieterkündigungsrechtes analog § 539 BGB
JF - Neue Juristische Wochenschrift (2001)
Y1 - 2001
SP - 271
EP - 273
ER -
TY - JOUR
A1 - Timme, Michael
A1 - Hülk, Fabian
T1 - Rechts- und Parteifähigkeit der Gesellschaft bürgerlichen Rechts
JF - Juristische Schulung (2001)
Y1 - 2001
SP - 536
EP - 540
ER -
TY - JOUR
A1 - Timme, Michael
T1 - Anmerkung zu BGH IV ZR 157/99 (Verfilmung von Urkunden und Beweislast im Zivilprozeßrecht)
JF - Juristische Arbeitsblätter (2001)
Y1 - 2001
SP - 534
EP - 536
ER -
TY - CHAP
A1 - Kern, Alexander
A1 - Meppelink, Jan
T1 - Neue Möglichkeiten elektrischer Anschlüsse an die Bewehrung und Untersuchung der Wirkung von Blitzströmen in bewehrtem Beton
N2 - Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden.
KW - Blitzschutz
KW - Stahlbetonkonstruktion
KW - Lightning Protection
KW - reinforced concrete
Y1 - 2001
ER -
TY - CHAP
A1 - Kern, Alexander
A1 - Neskakis, Apostolos
A1 - Müller, Klaus-Peter
T1 - Blitzschutzkonzept für eine netz-autarke Hybridanlage am Beispiel der Anlage VATALI auf Kreta
N2 - Netz-autarke Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaik- (PV-) Anlagen, ggf. auch Solarthermie- (ST-) Anlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet) und werden vor allem in Gegenden mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in rel. dünn bewohnten Gebieten und in Entwicklungsländern. Der Blitzschutz von netz-autarken Hybridanlagen ist ein bislang noch vergleichsweise unzureichend bearbeitetes Fachgebiet. Für große Windenergie-Anlagen (WEA) wurde in den letzten Jahren eine Zahl von FuE-Projekten durchgeführt, zum Großteil finanziert durch die öffentliche Hand, zum kleineren Teil auch durch die Industrie, d.h. die WEAHersteller. Dabei wurden bestehende Defizite im Design der WEA festgestellt und Maßnahmen vorgeschlagen, die vor den mechanischen Zerstörungen insbesondere des Rotors und vor den Störungen und Zerstörungen an den elektrischen / elektronischen Systemen der WEA weitgehend Schutz bieten [1, 2, 3]. Der Stand-der- Normung ist im Entwurf DIN VDE 0127 Teil 24 „Blitzschutz für Windenergieanlagen“ (dt. Übersetzung des internationalen Drafts IEC 61400-24 „Wind turbine generator systems; Part 24: Lightning Protection“) dokumentiert [4]. Die Maßnahmen sind allerdings insbesondere für größere WEA vorgesehen; im Falle kleinerer WEA lassen sie sich nur bedingt umsetzen. Trotzdem sind auch kleinere WEA rel. stark blitzeinschlaggefährdet, wenn sie auf einer Bergkuppe o.ä. platziert werden. Für solche kleinere WEA, wie sie bei Hybridanlagen üblicherweise Verwendung finden, müssen die Blitzschutzmaßnahmen aus der DIN VDE 0127 Teil 24 angepasst werden. Für PV- und ST-Anlagen ist eine entsprechende Blitzschutz-Norm noch nicht in Sicht. Hier ist vor allem der Schutz gegen direkte Blitzeinschläge in die Anlage bzw. die Gebäude noch nicht ausreichend beachtet. Blitzfangeinrichtungen sind oft nicht vorgesehen. In aller Regel hat man dabei bisher eine Ausführungsform des Blitzschutzes realisiert, die primär einen Ferneinschlag berücksichtigt und die dabei entstehenden induzierten, rel. energieschwachen Überspannungen durch schwächere Schutzelemente wie Rückstromdioden, Bypassdioden und zum Teil thermisch überwachte Varistoren begrenzt [5, 6, 7]. Diese Schutzelemente können allerdings bei Naheinschlägen bzw. Direkteinschlägen überlastet und damit zerstört werden. Darüber hinaus können Nahoder Direkteinschläge auch zur Schwächung der elektrischen Festigkeit der PVModulisolierung führen. Die Folge davon sind lokale extreme Wärmeentwicklungen, die sogar ein Schmelzen von Glas (sekundärer Langzeiteffekt) hervorrufen könnten. Bei einem Blitzeinschlag in die netz-autarke Hybridanlage VATALI auf Kreta im Jahre 2000 wurden sowohl einige mechanische wie auch elektrische Komponenten der Anlage zerstört bzw. zum Teil schwer beschädigt. Die Anlage VATALI besaß zum Zeitpunkt des Blitzeinschlags keinen wirksamen Blitzschutz. Der Gesamtschaden der Hardware belief sich auf ca. 60.000,- EURO. Die exponierte Stellung der Anlage auf einer Bergspitze stellte und stellt nach wie vor ein enormes Blitzeinschlag-Risiko dar, so dass auch zukünftig mit Blitzeinwirkungen gerechnet werden muss. Die Anlage wurde inspiziert, blitzschutz-technische Erfordernisse definiert und daraus Ertüchtigungsmaßnahmen abgeleitet, die mit überschaubarem Aufwand realisierbar sind.
KW - Blitzschutz
KW - Hybridanlage
KW - Regenerative Energieanlagen
KW - Lightning protection
KW - renewable energy
KW - hybrid system
Y1 - 2001
ER -
TY - CHAP
A1 - Kern, Alexander
A1 - Krichel, Frank
A1 - Müller, Klaus-Peter
T1 - Lightning protection design of a renewable energy hybrid-system without power mains connection
N2 - In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.
KW - Blitzschutz
KW - Erneuerbare Energien
KW - Hybridsystem
KW - Lightning protection
KW - Renewable energy
KW - hybrid-system
Y1 - 2001
ER -
TY - BOOK
A1 - Lohr, Jürgen
A1 - Deppe, Andreas
T1 - Der CMS-Guide
N2 - Lohr, J. ; Deppe, A: Der CMS-Guide. Content Management-Systeme: Erfolgsfaktoren, Geschäftsmodelle, Produktübersicht. Stand: 3.9.2001 [Manuskript]. Braunschweig: Vieweg 2001. XVII, 253 S. ISBN 3-528-05768-8 [Aufl. vergriffen] Nach einer Einführung in die Grundlagen des Content Managements, in der die Begriffe Daten, Content Prozess und Content Life Cycle erläutert werden, erfolgt eine Klassifizierung von Content-Management-Systemen in die Bereiche Cross Media Publishing, Infobroker (Syndica-tor), Dokumentenmanagement, Informationspool, Unternehmensinformation, Wissensmanagement, Training, Portale, Customer Interaction & Care, Customer Relationship Management, Kommerzielle Community, Application Service Provider, E-Commerce und Marktplätze. Anhand einer technischen und inhaltlichen Zusammenfassung der Einsatzbereiche ergeben sich die Leistungsmerkmale: Visualizing, Retrieval, Organizing, Collaboration, Modularisierung, Skalierbarkeit und Authoring. Produkte werden den Einsatzbereichen zugeordnet und ausführlich beschrieben. Dabei fällt auf, dass bei den "Top-20-Produkten" die Bereiche Cross Media Publishing, Unternehmensinformation und Informationspool dominieren. Geringe Unterstützung erfahren zurzeit die Bereiche Wissensmanagement, Customer Interaction & Care sowie Training. Ein kritischer Erfolgsfaktor für die Einführung und den Betrieb eines Content-Management-Systems ist die Unterstützung des gewählten Geschäftsmodells. Die Einführung kann durch technische und organisatorische Auswahlverfahren unterstützt werden. Ein Schichtenmodell zeigt die Einbindung oder Optimierung eines Content-Management-Systems in ein Unternehmen. Einerseits können organisatorische, innerbetriebliche und marktorientierte Anforderungsprofile abgeleitet werden, andererseits ergeben sich aus der innerbetrieblichen IT-Struktur Determinanten für die Leistungs-merkmale und den Funktionsumfang des auszuwählenden Content-Management-Systems. Als ein wesentlicher kritischer Erfolgsfaktor stellte sich heraus, dass das Content-Management-System in der Lage sein sollte, dynamische Geschäftsmodelle abzubilden. Dieses Kriterium wird zusätzlich durch die diversen Checklisten, deren Aufbau auf dem Schichtenmodell basiert, herausgearbeitet.
KW - CMS
KW - Content Management
Y1 - 2001
SN - 3-528-05768-8
ER -
TY - JOUR
A1 - Lohr, Jürgen
T1 - Content-Management für die Verteilung von Multimedia-Diensten
N2 - In: Unterrichtsblätter / Deutsche Telekom AG. 54. 2001. 7. S. 410-420 (11 S. ) Angesichts der zunehmenden Globalisierung von Informationen und Informationsdiensten können Inhalte (Contents) für mehrere unterschiedliche Dienste genutzt und auf verschiedenen Endgeräten ausgegeben werden. Hier setzt ein Content-Management-System (CMS) an, welches sowohl für die Kunden als auch für die Anbieter der unterschiedlich distribuierten Dienste Synergien und somit Einsparpotenziale bietet. Darüber hinaus werden für die Anbieter dieser Dienste durch die allgemeine Definition von Leistungstools und die Definition von Wertschöpfungsketten künftige Produktentwicklungen vereinheitlicht und optimiert werden. Mit der Entwicklung und Vertriebsfreigabe immer weiterer Informationsdienste, die von verschiedenen Dienste-Providern betrieben werden, ist der Bedarf an einer Koordinierung der Entwicklungen und Investitionen im Bereich der Content-Akquisition und des Content-Management (CM) bedeutend angestiegen. Neben Akquisition, lizenzrechtlichen Fragen und Verwaltung des im Rahmen von Diensten angebotenen Content rücken vor allem auch Fragen der Gestaltung von Content-Management-Plattformen (CMP) immer stärker in den Blickpunkt. Der Beitrag stellt die globalen Ergebnisse dar, die in einem Forschungs- und Entwicklungsauftrag des Zentralbereichs Innovationsmanagement der Deutschen Telekom zu diesem Thema ermittelt wurden. Es werden die Kernmodule für eine Content- Management-Plattform beschrieben, die die Anforderungen an die Bereitstellung vielfältiger Content-Angebote erfüllt. Die folgenden Themen werden behandelt: + Begriffsbestimmung, + Content- und Dienste-Portfolio, + Standard Content-Prozess, + synergetische Content-Plattform (sCP), + Modelle der sCP, + Aspekte beim Betrieb und + Nutzen eines Content-Management.
KW - Content Management
KW - Multimediamarkt
Y1 - 2001
ER -
TY - JOUR
A1 - Frings, Michael
T1 - Auslegung einer Bürgerschaftsvereinbarung (BGH, Urteil vom 09.07.2001)
JF - Entscheidungen zum Wirtschaftsrecht : EWiR ; Kurzkommentare (2001)
Y1 - 2001
SN - 0177-9303
SP - 849
ER -
TY - JOUR
A1 - Frings, Michael
T1 - Das Verbraucherkreditgesetz
JF - Neue Wirtschafts-Briefe. Fach 21
Y1 - 2001
SP - 1411
PB - Verl. Neue Wirtschafts-Briefe
CY - Herne [u.a.]
ER -
TY - JOUR
A1 - Frings, Michael
T1 - Erlassvertrag durch Scheckeinlösung (BGH, Urteil vom 10.05.2001)
JF - Betriebs-Berater : BB ; Zeitschrift für Recht und Wirtschaft (2001)
Y1 - 2001
SN - 0340-7918
SP - 1762
ER -
TY - JOUR
A1 - Gebhardt, Andreas
T1 - Entwicklungstendenzen und neue Systeme im Rapid Prototyping
JF - Industrie Management. 17 (2001), H. 3
Y1 - 2001
SN - 1434-1980
SP - 42
EP - 46
ER -
TY - JOUR
A1 - Janz, Norbert
A1 - Ebling, Günther
A1 - Gottschalk, Sandra
A1 - Niggemann, Hiltrud
T1 - The Mannheim Innovation Panels (MIP and MIP-S) of the Centre for European Economic Research (ZEW) / Janz, N., G. Ebling, S. Gottschalk und H. Niggemann
JF - Schmollers Jahrbuch : Zeitschrift für Wirtschafts- und Sozialwissenschaften ; journal of applied social science studies. 121 (2001)
Y1 - 2001
SN - 0342-1783
SP - 123
EP - 129
ER -
TY - JOUR
A1 - Janz, Norbert
T1 - Ostdeutschland: Dienstleister sind Schwachstelle
JF - EU-Magazin : unabhängige Zeitschrift für Wirtschaft, Recht und Politik in der Europäischen Union ; mit ZEW aktuell. 8 (2001), H. 10
Y1 - 2001
SN - 0946-4689
SP - 3
EP - 3
ER -
TY - JOUR
A1 - Janz, Norbert
A1 - Voß, K.
T1 - Innovationen im Dienstleistungssektor: Rationalisierung steht nicht im Vordergrund / Janz, N. und K. Voß
Y1 - 2001
N1 - ZEW Zentrum für Europäische Wirtschaftsforschung. Pressemitteilung 20. Juni 2001.
ER -
TY - JOUR
A1 - Janz, Norbert
A1 - Voß, K.
T1 - Innovationsverhalten der deutschen Wirtschaft: Spitzenstellung bei Marktneuheiten / Janz, N. und K. Voß
Y1 - 2001
N1 - ZEW Zentrum für Europäische Wirtschaftsforschung. Pressemitteilung 23. Mai 2001.
ER -
TY - BOOK
A1 - Janz, Norbert
A1 - Ebling, Günther
A1 - Gottschalk, Sandra
A1 - Peters, Bettina
T1 - Innovationsverhalten der deutschen Wirtschaft: Indikatorenbericht zur Innovationserhebung 2001 / Janz, N., G. Ebling, S. Gottschalk, B. Peters und T. Schmidt
Y1 - 2001
N1 - Online unter ftp://ftp.zew.de/pub/zew-docs/mip/01/Indikatorenbericht2001.pdf
PB - ZEW Zentrum für Europäische Wirtschaftsforschung
CY - Mannheim
ER -
TY - BOOK
A1 - Janz, Norbert
A1 - Ebling, Günther
A1 - Gottschalk, Sandra
A1 - Hempell, Thomas
T1 - Innovationsverhalten der deutschen Wirtschaft: Indikatorenbericht zur Innovationserhebung 2000 / Janz, N., G. Ebling, S. Gottschalk, T. Hempell, B. Peters, G. Ebling und H. Niggemann
Y1 - 2001
N1 - Online unter ftp://ftp.zew.de/pub/zew-docs/mip/00/MIP-VGDL00.pdf
PB - ZEW Zentrum für Europäische Wirtschaftsforschung
CY - Mannheim
ER -
TY - JOUR
A1 - Reichert, Gerhard
A1 - De Lucchi, Michele
T1 - Diffuse Reflexe / Des. Michele De Lucchi, Gerhard Reichert
JF - MD - Internatioal magazine of design (2001)
Y1 - 2001
SN - 0343-0642
N1 - Außenleuchte "Palme"
SP - 26
EP - 27
ER -
TY - JOUR
A1 - Janz, Norbert
T1 - Innovations in Germany: Market Novelties Gain Greater Importance
JF - ZEW news. English edition (2001)
Y1 - 2001
SP - 3
EP - 3
ER -
TY - JOUR
A1 - Janz, Norbert
T1 - Innovationen in Deutschland: Unternehmen setzen verstärkt auf Marktneuheiten
JF - EU-Magazin : unabhängige Zeitschrift für Wirtschaft, Recht und Politik in der Europäischen Union ; mit ZEW aktuell. 8 (2001), H. 6
Y1 - 2001
SN - 0946-4689
SP - 1
EP - 2
ER -
TY - JOUR
A1 - Janz, Norbert
T1 - Innovationsverhalten im Dienstleistungssektor: Rationalisierungsmaßnahmen stehen nicht im Vordergrund
JF - EU-Magazin : unabhängige Zeitschrift für Wirtschaft, Recht und Politik in der Europäischen Union ; mit ZEW aktuell. 8 (2001), H. 7
Y1 - 2001
SN - 0946-4689
SP - 2
EP - 2
ER -
TY - JOUR
A1 - Starke, Günther
T1 - Virtual Reality und Simulation als integrierte Werkzeuge für die Entwicklung mechatronischer Systeme
JF - VDI-Berichte. 1631 (2001)
Y1 - 2001
SN - 0083-5560
N1 - Konferenz-Einzelbericht
SP - 1
EP - 17
ER -
TY - BOOK
A1 - Janz, Norbert
A1 - Gottschalk, Sandra
T1 - Innovation Dynamics and Endogenours Market Structue. An Econometric Investigation with Aggregated Innovation Survey Data / Gottschalk, S. und N. Janz
Y1 - 2001
N1 - ZEW-Discussion Paper 01-39 online unter ftp://ftp.zew.de/pub/zew-docs/dp/dp0139.pdf
PB - ZEW Zentrum für Europäische Wirtschaftsförderung
CY - Mannheim
ER -
TY - JOUR
A1 - Franke, Thomas
A1 - Bosis, R.
A1 - Napoli, M.-D.
T1 - Über das Internet steuerbarer Gebläseprüfstand mit einstellbaren Eintrittsleitschaufeln
JF - Virtuelle Instrumente in der Praxis : Begleitband zum Kongreß VIP 2001 / Rahman Jamal ; Hans Jaschinski
Y1 - 2001
SN - 3-7785-2829-7
N1 - Serie Praxiswissen Elektronik-Industrie : Messtechnik
SP - 219
EP - 225
PB - Hüthig Verlag
CY - Heidelberg [u.a.]
ER -
TY - JOUR
A1 - Pietschmann, Bernd P.
A1 - Ruhtz, Vanessa
T1 - Knowledge Management
JF - Personal : Zeitschrift für Human Resource Management. 53 (2001), H. 5
Y1 - 2001
SN - 0031-5605
SP - 242
EP - 249
ER -
TY - JOUR
A1 - Gerhardt, Hans Joachim
T1 - Entrauchungsnachweise. Kritische Diskussion von Methoden des Brandschutzingenieurwesens
JF - vfdb-Zeitschrift. 50 (2001), H. 3
Y1 - 2001
SN - 0042-1804
SP - 99
EP - 104
ER -
TY - JOUR
A1 - Baltzer, Wolfgang
T1 - Sind deutsche Strassentunnel sicher genug? - Erkenntnisse und Konsequenzen aus nationalen und internationalen Untersuchungen
JF - Strassenverkehrstechnik. 45 (2001), H. 8
Y1 - 2001
SN - 0039-2219
SP - 389
EP - 393
ER -
TY - JOUR
A1 - Hirschberg, Rainer
T1 - Energieeinsparung durch Zusatzkomponenten an Wärmeerzeugern? Brennstartcomputer und Heizkesseleinsätze
JF - Wärme + Versorgungstechnik : Zeitschrift für den Fachplaner in der technischen Gebäudeausrüstung (2001)
Y1 - 2001
SN - 1617-9579
SP - 21
EP - 24
ER -
TY - JOUR
A1 - Hirschberg, Rainer
T1 - Produktdatenaustausch in der TGA nach VDI-Richtlinien. Standardisierte Informationswege
JF - HLH : Lüftung, Klima, Heizung, Sanitär, Gebäudetechnik ; Zeitschrift des Vereins Deutscher Ingenieure ; Organ der VDI-Gesellschaft Technische Gebäudeausrüstung (VDI-TGA) / Hrsg. Verein Deutscher Ingenieure. 52 (2001), H. 3
Y1 - 2001
SN - 1436-5103
SP - 52
EP - 54
ER -
TY - JOUR
A1 - Paschmann, Hans
A1 - Schmidt, Stefan
T1 - Mechanische Eigenschaften von Glasfasermixbeton. Wie viel Fasern braucht Beton? / Schmidt, Stefan; Paschmann, Hans
JF - BFT Betonwerk + Fertigteil-Technik. 67 (2001), H. 10
Y1 - 2001
SN - 0373-4331
SP - 64
EP - 75
ER -
TY - JOUR
A1 - Paschmann, Hans
T1 - Zielsichere Herstellung von selbstverdichtendem Beton erhöhter Druckfestigkeit
JF - BFT Betonwerk + Fertigteil-Technik. 67 (2001), H. 1
Y1 - 2001
SN - 0373-4331
N1 - Ulmer Beton- und Fertigteil-Tage (45, 2001, Ulm)
SP - 36
EP - 37
ER -
TY - BOOK
A1 - Siedenbiedel, Georg
T1 - Organisationslehre
Y1 - 2001
SN - 3-17-016498-8
N1 - [neuere Aufl. vorh.]
Klausur-Intensiv-Training BWL ; 11
PB - Kohlhammer
CY - Stuttgart [u.a.]
ER -