Konferenzveröffentlichung
Filtern
Erscheinungsjahr
Institut
- Fachbereich Energietechnik (263) (entfernen)
Dokumenttyp
- Konferenzveröffentlichung (263) (entfernen)
Schlagworte
- Blitzschutz (15)
- Lightning protection (9)
- Energy storage (4)
- Power plants (4)
- reinforced concrete (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Elektromagnetischer Schutzschild (3)
- Hybrid energy system (3)
- Lightning (3)
- Out-of-plane load (3)
- Risikomanagement (3)
- Stahlbetonkonstruktion (3)
- earthquakes (3)
- Adjacent buildings (2)
- Direkter Blitzschlag (2)
- Diversity (2)
- Diversity Management (2)
- Electricity generation (2)
- Energierecht (2)
- Erneuerbare Energien (2)
- Gasturbine (2)
- Historical centres (2)
- Hybridsystem (2)
- INODIS (2)
- Induzierte Spannungen (2)
- Innovation Management (2)
- Lightning Protection (2)
- Lightning protection system (2)
- Magnetische Felder (2)
- Micro turbine (2)
- Mikrogasturbine (2)
- Renewable energy (2)
- Risikoabschätzung (2)
- Risikoabwägung (2)
- Risk management (2)
- Seismic loading (2)
- Shake table test (2)
- Solar thermal technologies (2)
- Stone masonry (2)
- cyber physical production system (2)
- digital shadow (2)
- electromagnetic shielding (2)
- engineering education (2)
- hybrid system (2)
- industrial facilities (2)
- installations (2)
- photovoltaic system (2)
- piping (2)
- renewable energy (2)
- seismic design (2)
- seismic loading (2)
- wind turbine (2)
- Acceptance (1)
- Ausfachungsmauerwerk (1)
- Blind prediction competition (1)
- Blitz (1)
- Blitzeinschlag (1)
- Blitzrisiko (1)
- Blitzschlag (1)
- Bloom Taxonomy (1)
- COMSOL Multiphysics (1)
- Camera system (1)
- Capacity Curve (1)
- Ceramics (1)
- Change Management (1)
- Cloud passages (1)
- Control optimization (1)
- Corporate Culture (1)
- DNI forecast (1)
- DNI forecasting (1)
- Decision theory (1)
- Design Thinking (1)
- Digitalization (1)
- Direct lightning strike (1)
- Direct normal irradiance forecast (1)
- District data model (1)
- District energy planning platform (1)
- EN 1998-4 (1)
- ESHM20, industrial facilities (1)
- Earthquake (1)
- Earthquake Engineering (1)
- Electrochemistry (1)
- Elektrizität (1)
- Elektromagnetische Kopplung (1)
- Emissionshandel (1)
- Emissionsrechtehandel (1)
- Energietechnik (1)
- Energy (1)
- Energy Systems (1)
- Energy system (1)
- Energy system planning (1)
- Engineering (1)
- Engineering Education (1)
- Erdbeben (1)
- Erneuerbares Energiengesetz (1)
- Ethics (1)
- Future Skills (1)
- Future skills (1)
- Gas (1)
- Gender (1)
- Global change (1)
- Heliostat Field Calibration (1)
- Heliostats (1)
- Higher Education (1)
- Human factors (1)
- Human-robot collaboration (1)
- Hybridanlage (1)
- INSYSME (1)
- In- plane damage (1)
- In-plane (1)
- In-plane load (1)
- Industrial facilities (1)
- Industrieanlagen (1)
- Innovation (1)
- Interaction (1)
- Interculturality (1)
- Interdisciplinarity (1)
- Isolation (1)
- Kalkulation (1)
- Kernenergie (1)
- Key competences (1)
- Kraftwerke (1)
- Leadership (1)
- Lightning Risk (1)
- LiveLink for MATLAB (1)
- Masonry infill (1)
- Masonry structures (1)
- Maßstabsgetreues Modell (1)
- Measuring instruments (1)
- Mixed integer linear programming (MILP) (1)
- Molten salt receiver (1)
- Molten salt receiver system, (1)
- Neo-Deterministic (1)
- Nowcasting (1)
- Nuclear Applications (1)
- Optimization module (1)
- Out-of-plane (1)
- Out-of-plane failure (1)
- Out-of-plane strength (1)
- PTC (1)
- Parabolic trough collector (1)
- Photovoltaics (1)
- Photovoltaikanlage (1)
- Photovoltaikanlagen (1)
- Process prediction (1)
- Pyrometrie (1)
- Quadrocopter (1)
- RC frames (1)
- Regenerative Energieanlagen (1)
- Renewable energy integration (1)
- Risiko (1)
- Risk (1)
- Risk Assessment (1)
- Risk Management (1)
- Risk assessment (1)
- Risk assessment ; Insurance (1)
- Seismic (1)
- Seismic Hazard (1)
- Seismic design (1)
- Social impact measurement (1)
- Solar irradiance (1)
- Stahlbeton (1)
- Stahlbetonrahmen (1)
- Star design (1)
- Structural health monitoring (1)
- Sustainability (1)
- Sustainable engineering education (1)
- Tanks (1)
- Temperaturmessung (1)
- Thermal Energy Storage (1)
- Time-series aggregation (1)
- Typical periods (1)
- UAV (1)
- Umwelt (1)
- Umweltzertifikathandel (1)
- Uncertainty analysis (1)
- Unmanned aerial vehicle (1)
- Unreinforced masonry walls (1)
- Versicherung (1)
- Virtuelle Kraftwerke (1)
- Vulnerability Curves (1)
- Windenergieanlage (1)
- Windenergieanlagen (1)
- Window opening (1)
- Ziegelmauerwerk (1)
- acoustic pyrometry (1)
- arresters (1)
- atmospheric modeling (1)
- behaviour factor q (1)
- best practice (1)
- calculations (1)
- conductors (1)
- connection detail (1)
- current distribution (1)
- cyber-physical production system (1)
- digital twin (1)
- digitalization (1)
- dissemination (1)
- diversity (1)
- down-conductor (1)
- early warning and response system (1)
- earthquake (1)
- education (1)
- elastomeric bearing (1)
- electromagnetic coupling (1)
- electromagnetic shield (1)
- energy transition (1)
- environment (1)
- finite element method (1)
- flue gas components (1)
- fluid structure interaction (1)
- fragility curves (1)
- friction pendulum bearing (1)
- gender and diversity (1)
- human digital shadow (1)
- human factors (1)
- human-machine interface (1)
- hybrid-system (1)
- in-plane (1)
- in-plane and out-of-plane failure (1)
- induced voltage (1)
- induced voltages (1)
- innovation (1)
- integration SHM in BIM (1)
- interconnected sensor systems (1)
- internet of production (1)
- lightning (1)
- lightning flash (1)
- lightning protection (1)
- lightning strike (1)
- linear elastic analysis; (1)
- liquid storage tank (1)
- magnetic field (1)
- magnetic fields (1)
- masonry structures (1)
- metal façade (1)
- modern constructions (1)
- open educational resources (1)
- out-of-plane (1)
- overvoltages (1)
- planning (1)
- power generation (1)
- power transmission lines (1)
- probability distribution (1)
- protection measures (1)
- renewable energies (1)
- risk assessment (1)
- risk management (1)
- safety control (1)
- scaled model (1)
- seismic hazard (1)
- seismic isolation (1)
- seismic risk (1)
- seismic structural damage detection via SHM (1)
- seismic vulnerability (1)
- simplified approach (1)
- social responsible engineering (1)
- standards (1)
- steam production (1)
- steel columns (1)
- storage dispatch (1)
- storage optimisation (1)
- surges (1)
- teaching (1)
- temperature measurement (1)
- thermal storage (1)
- touch voltage (1)
- unreinforced masonry buildings (1)
- user & usage (1)
- vocal fold oscillation (1)
- Überspannung (1)
Since fluid-structure interaction within the finite-element method is state of the art in many engineering fields, this method is used in voice analysis. A quasi two-dimensional model of the vocal folds including the ventricular folds is presented. First results of self-sustained vocal fold oscillation are presented and possibilities as well as limitations are discussed.
A research framework for human aspects in the internet of production: an intra-company perspective
(2020)
Digitalization in the production sector aims at transferring concepts and methods from the Internet of Things (IoT) to the industry and is, as a result, currently reshaping the production area. Besides technological progress, changes in work processes and organization are relevant for a successful implementation of the “Internet of Production” (IoP). Focusing on the labor organization and organizational procedures emphasizes to consider intra-company factors such as (user) acceptance, ethical issues, and ergonomics in the context of IoP approaches. In the scope of this paper, a research approach is presented that considers these aspects from an intra-company perspective by conducting studies on the shop floor, control level and management level of companies in the production area. Focused on four central dimensions—governance, organization, capabilities, and interfaces—this contribution presents a research framework that is focused on a systematic integration and consideration of human aspects in the realization of the IoP.
Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht immer geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Vornorm DIN V 0185-2 VDE V 0185 Teil 2 [1] gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 [2, 3] detailliert beschrieben.
An interdisciplinary view on humane interfaces for digital shadows in the internet of production
(2022)
Digital shadows play a central role for the next generation industrial internet, also known as Internet of Production (IoP). However, prior research has not considered systematically how human actors interact with digital shadows, shaping their potential for success. To address this research gap, we assembled an interdisciplinary team of authors from diverse areas of human-centered research to propose and discuss design and research recommendations for the implementation of industrial user interfaces for digital shadows, as they are currently conceptualized for the IoP. Based on the four use cases of decision support systems, knowledge sharing in global production networks, human-robot collaboration, and monitoring employee workload, we derive recommendations for interface design and enhancing workers’ capabilities. This analysis is extended by introducing requirements from the higher-level perspectives of governance and organization.
In the past, CSP and PV have been seen as competing technologies. Despite massive reductions in the electricity generation costs of CSP plants, PV power generation is - at least during sunshine hours - significantly cheaper. If electricity is required not only during the daytime, but around the clock, CSP with its inherent thermal energy storage gets an advantage in terms of LEC. There are a few examples of projects in which CSP plants and PV plants have been co-located, meaning that they feed into the same grid connection point and ideally optimize their operation strategy to yield an overall benefit. In the past eight years, TSK Flagsol has developed a plant concept, which merges both solar technologies into one highly Integrated CSP-PV-Hybrid (ICPH) power plant. Here, unlike in simply co-located concepts, as analyzed e.g. in [1] – [4], excess PV power that would have to be dumped is used in electric molten salt heaters to increase the storage temperature, improving storage and conversion efficiency. The authors demonstrate the electricity cost sensitivity to subsystem sizing for various market scenarios, and compare the resulting optimized ICPH plants with co-located hybrid plants. Independent of the three feed-in tariffs that have been assumed, the ICPH plant shows an electricity cost advantage of almost 20% while maintaining a high degree of flexibility in power dispatch as it is characteristic for CSP power plants. As all components of such an innovative concept are well proven, the system is ready for commercial market implementation. A first project is already contracted and in early engineering execution.
Analysis Of Base Isolated Liquid Storage Tanks With 3D Fsi-Analysis As Well As Simplified Approaches
(2017)
Tanks are preferably designed, for cost-saving reasons, as circular, cylindrical, thin-walled shells. In case of seismic excitation, these constructions are highly vulnerable to stability failures. An earthquake-resistant design of rigidly supported tanks for high seismic loading demands, however, uneconomic wall thicknesses. A cost-effective alternative can be provided by base isolation systems. In this paper, a simplified seismic design procedure for base isolated tanks is introduced, by appropriately modifying the standard mechanical model for flexible, rigidly supported tanks. The non-linear behavior of conventional base isolation systems becomes an integral part of a proposed simplified process, which enables
the assessment of the reduced hydrodynamic forces acting on the tank walls and the corresponding stress distribution. The impulsive and convective actions of the liquid are taken into account. The validity of this approach is evaluated by
employing a non-linear fluid-structure interaction algorithm of finite element method. Special focus is placed on the boundary conditions imposed from the base isolation and the resulting hydrodynamic pressures. Both horizontal and vertical
component of ground motion are considered in order to study the principal effects of the base isolation on the pressure distribution of the tank walls. The induced rocking effects associated with elastomeric bearings are discussed. The results
manifest that base isolated tanks can be designed for seismic loads by means of the proposed procedure with sufficient accuracy, allowing to dispense with numerically expensive techniques.
The paper deals with the development of the probabilistic approach to the assessment of risk due to lightning. Sources of damage, types of damage and types of loss are defined and, accordingly, the procedure for risk analysis and the way of assessment of different risk components is proposed. The way to evaluate the influence of different protection measures (lightning protection system; shielding of structure, cables and equipment; routing of internal wiring; surge protective device) in reducing such probabilities is considered. The paper has been prepared within the framework of the activity of IEC TC81-WG9/CLC TC81-WG4 directed to prepare the draft IEC 62305-2 Risk Management, in cooperation with the Secretary of IEC/CLC TC81.
Large industrial facilities and power plants often require a huge number fo information and control cables between the differnet structures. These I&C-cables can be routed in reinforced concrete cable ducts or in isolated buried cable runs. KTA 2206 is the German lightning protection standard for nuclear power plants. During the last several years considerable effort has been made to revise this standard. Despite the well established principles and design guidelines for the construction of the lightning protection system, this standard puts special emphasis on the coupling of transient overvoltages to I&C-cables.
Thematisch widmet sich das Projekt Coolplan- AIR der Fortentwicklung und Feldvalidierung eines Berechnungs- und Auslegungstools zur energieeffizienten Kühlung von Gebäuden mit luftgestützten Systemen. Neben dem Aufbau und der Weiterentwicklung von Simulationsmodellen erfolgen Vermessungen der Gesamtsysteme anhand von Praxisanlagen im Feld. Der Schwerpunkt des Projekts liegt auf der Vermessung, Simulation und Integration rein luftgestützter Kühltechnologien. Im Bereich der Kälteerzeugung wurden Luft‐ Luft‐ Wärmepumpen, Anlagen zur adiabaten Kühlung bzw. offene Kühltürme und VRF‐ Multisplit‐ Systeme (Variable Refrigerant Flow) im Feld bzw. auf dem Teststand der HSD vermessen. Die Komponentenmodelle werden in die Matlab/Simulink‐ Toolbox CARNOT integriert und anschließend auf Basis der zuvor erhaltenen Messdaten validiert.
Einerseits erlauben die Messungen das Betriebsverhalten von Anlagenkomponenten zu analysieren. Andererseits soll mit der Vermessung im Feld geprüft werden, inwieweit die Simulationsmodelle, welche im Vorgängerprojekt aus Prüfstandmessungen entwickelt wurden, auch für größere Geräteleistungen Gültigkeit besitzen. Die entwickelten und implementierten Systeme, bestehend aus verschiedensten Anlagenmodellen und Regelungskomponenten, werden geprüft und dahingehend qualifiziert, dass sie in Standard- Auslegungstools zuverlässig verwendet werden können.
Zusätzlich wird ein energetisches Monitoring eines Hörsaalgebäudes am Campus Jülich durchgeführt, das u. a. zur Validierung der Kühllastberechnungen in gängigen Simulationsmodelle genutzt werden kann.
In collaborative research projects, both researchers and practitioners work together solving business-critical challenges. These projects often deal with ETL processes, in which humans extract information from non-machine-readable documents by hand. AI-based machine learning models can help to solve this problem.
Since machine learning approaches are not deterministic, their quality of output may decrease over time. This fact leads to an overall quality loss of the application which embeds machine learning models. Hence, the software qualities in development and production may differ.
Machine learning models are black boxes. That makes practitioners skeptical and increases the inhibition threshold for early productive use of research prototypes. Continuous monitoring of software quality in production offers an early response capability on quality loss and encourages the use of machine learning approaches. Furthermore, experts have to ensure that they integrate possible new inputs into the model training as quickly as possible.
In this paper, we introduce an architecture pattern with a reference implementation that extends the concept of Metrics Driven Research Collaboration with an automated software quality monitoring in productive use and a possibility to auto-generate new test data coming from processed documents in production.
Through automated monitoring of the software quality and auto-generated test data, this approach ensures that the software quality meets and keeps requested thresholds in productive use, even during further continuous deployment and changing input data.
Recent earthquakes showed that low-rise URM buildings following codecompliant seismic design and details behaved in general very well without substantial damages. Although advances in simulation tools make nonlinear calculation methods more readily accessible to designers, linear analyses will still be the standard design method for years to come. The present paper aims to improve the linear seismic design method by providing a proper definition of the q-factor of URM buildings. Values of q-factors are derived for low-rise URM buildings with rigid diaphragms, with reference to modern structural configurations realized in low to moderate seismic areas of Italy and Germany. The behaviour factor components for deformation and energy dissipation capacity and for overstrength due to the redistribution of forces are derived by means of pushover analyses. As a result of the investigations, rationally based values of the behaviour factor q to be used in linear analyses in the range of 2.0 to 3.0 are proposed.
In many historical centers in Europe, stone masonry is part of building aggregates, which developed when the layout of the city or village was densified. The analysis of such building aggregates is very challenging and modelling guidelines missing. Advances in the development of analysis methods have been impeded by the lack of experimental data on the seismic response of such aggregates. The SERA project AIMS (Seismic Testing of Adjacent Interacting Masonry Structures) provides such experimental data by testing an aggregate of two buildings under two horizontal components of dynamic excitation. With the aim to advance the modelling of unreinforced masonry aggregates, a blind prediction competition is organized before the experimental campaign. Each group has been provided a complete set of construction drawings, material properties, testing sequence and the list of measurements to be reported. The applied modelling approaches span from equivalent frame models to Finite Element models using shell elements and discrete element models with solid elements. This paper compares the first entries, regarding the modelling approaches, results in terms of base shear, roof displacements, interface openings, and the failure modes.
Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen Wänden sind bereits in sehr großer Zahl errichtet. Dazu gehören kleinere bis größere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilität, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abhängig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen müssen. Der Blitzschutz für diese baulichen Anlagen sollte sich also nicht nur im „klassischen“ Gebäude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] erschöpfen; ein Ergänzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großflächigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugehörigen blitzschutz-technischen Maßnahmen können drei Hauptbereichen zugeordnet werden: - Äußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgeführten Anlage mit Fotos beispielhaft dokumentiert.
Blitzschutzkonzept für eine netz-autarke Hybridanlage am Beispiel der Anlage VATALI auf Kreta
(2001)
Netz-autarke Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaik- (PV-) Anlagen, ggf. auch Solarthermie- (ST-) Anlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet) und werden vor allem in Gegenden mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in rel. dünn bewohnten Gebieten und in Entwicklungsländern. Der Blitzschutz von netz-autarken Hybridanlagen ist ein bislang noch vergleichsweise unzureichend bearbeitetes Fachgebiet. Für große Windenergie-Anlagen (WEA) wurde in den letzten Jahren eine Zahl von FuE-Projekten durchgeführt, zum Großteil finanziert durch die öffentliche Hand, zum kleineren Teil auch durch die Industrie, d.h. die WEAHersteller. Dabei wurden bestehende Defizite im Design der WEA festgestellt und Maßnahmen vorgeschlagen, die vor den mechanischen Zerstörungen insbesondere des Rotors und vor den Störungen und Zerstörungen an den elektrischen / elektronischen Systemen der WEA weitgehend Schutz bieten [1, 2, 3]. Der Stand-der- Normung ist im Entwurf DIN VDE 0127 Teil 24 „Blitzschutz für Windenergieanlagen“ (dt. Übersetzung des internationalen Drafts IEC 61400-24 „Wind turbine generator systems; Part 24: Lightning Protection“) dokumentiert [4]. Die Maßnahmen sind allerdings insbesondere für größere WEA vorgesehen; im Falle kleinerer WEA lassen sie sich nur bedingt umsetzen. Trotzdem sind auch kleinere WEA rel. stark blitzeinschlaggefährdet, wenn sie auf einer Bergkuppe o.ä. platziert werden. Für solche kleinere WEA, wie sie bei Hybridanlagen üblicherweise Verwendung finden, müssen die Blitzschutzmaßnahmen aus der DIN VDE 0127 Teil 24 angepasst werden. Für PV- und ST-Anlagen ist eine entsprechende Blitzschutz-Norm noch nicht in Sicht. Hier ist vor allem der Schutz gegen direkte Blitzeinschläge in die Anlage bzw. die Gebäude noch nicht ausreichend beachtet. Blitzfangeinrichtungen sind oft nicht vorgesehen. In aller Regel hat man dabei bisher eine Ausführungsform des Blitzschutzes realisiert, die primär einen Ferneinschlag berücksichtigt und die dabei entstehenden induzierten, rel. energieschwachen Überspannungen durch schwächere Schutzelemente wie Rückstromdioden, Bypassdioden und zum Teil thermisch überwachte Varistoren begrenzt [5, 6, 7]. Diese Schutzelemente können allerdings bei Naheinschlägen bzw. Direkteinschlägen überlastet und damit zerstört werden. Darüber hinaus können Nahoder Direkteinschläge auch zur Schwächung der elektrischen Festigkeit der PVModulisolierung führen. Die Folge davon sind lokale extreme Wärmeentwicklungen, die sogar ein Schmelzen von Glas (sekundärer Langzeiteffekt) hervorrufen könnten. Bei einem Blitzeinschlag in die netz-autarke Hybridanlage VATALI auf Kreta im Jahre 2000 wurden sowohl einige mechanische wie auch elektrische Komponenten der Anlage zerstört bzw. zum Teil schwer beschädigt. Die Anlage VATALI besaß zum Zeitpunkt des Blitzeinschlags keinen wirksamen Blitzschutz. Der Gesamtschaden der Hardware belief sich auf ca. 60.000,- EURO. Die exponierte Stellung der Anlage auf einer Bergspitze stellte und stellt nach wie vor ein enormes Blitzeinschlag-Risiko dar, so dass auch zukünftig mit Blitzeinwirkungen gerechnet werden muss. Die Anlage wurde inspiziert, blitzschutz-technische Erfordernisse definiert und daraus Ertüchtigungsmaßnahmen abgeleitet, die mit überschaubarem Aufwand realisierbar sind.
Ein von der Arbeitsgemeinschaft (AG) Solar NRW und diversen Industriepartnern gefördertes und an der Fachhochschule Aachen, Abt. Jülich durchgeführtes Forschungsprojekt „Blitzschutz für netz-autarke Hybridanlagen“ machte es möglich, sich mit dem Blitzschutz speziell solcher Anlagen näher zu beschäftigen. Vermehrt bekannt gewordene Schadensfälle an nicht netz-gekoppelten Hybridanlagen waren der Auslöser, den Schutz zu überdenken. Definiertes Ziel war es, für netz-autarke energietechnische Anlagen ein Konzept zum Schutz vor Blitzeinwirkungen zu erstellen. Diese Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaikanlagen, ggf. auch Solarthermieanlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet). Zur Erhöhung der Versorgungssicherheit kann noch ein Dieselaggregat dazukommen. Hybridanlagen werden vor allem in Gebieten mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in relativ dünn bewohnten Gebieten und in Entwicklungsländern. Dem Blitzschutz von Hybridanlagen kommt dabei eine steigende Bedeutung zu. Besonderes Augenmerk in dem genannten Forschungsprojekt sollte dabei auf die technisch/wirtschaftliche Ausgewogenheit des Schutzes gelegt werden: • die Schutzmaßnahmen sollen nur in solchen Fällen eingesetzt werden, wo dies als Ergebnis von Risikoanalysen sinnvoll erscheint; • für typische netz-autarke Hybridanlagen sollen die Schutzmaßnahmen ohne deutliche Verteuerung realisierbar sein (es soll also kein absoluter Schutz realisiert werden; ggf. soll lediglich der auftretende Schaden soweit möglich minimiert werden). Dazu wurde in einem ersten Schritt zunächst eine Aufnahme des Iststandes einiger typischer netz-autarker Hybridanlagen und deren einzelnen Komponenten durchgeführt. Aufgrund dessen wurde eine umfassende Risikoanalyse zur Blitzbedrohung dieser Anlagen auf der Basis von VDE V 0185 Teil 2:2002-11 [1] erstellt. Die Ergebnisse mündeten in ein technisch/wirtschaftlich ausgewogenes Konzept für den Anlagen- Blitzschutz (d.h. insbesondere dem Schutz vor direkten Blitzeinschlägen und deren unmittelbaren Auswirkungen) nach VDE V 0185 Teil 3:2002-11 [2] und für den Elektronik-Blitzschutz (d.h. für den Schutz vor Überspannungen durch direkte, insbesondere aber auch indirekte Blitzeinschläge) nach VDE V 0185 Teil 4:2002-11 [3]. Aufgrund der gesammelten Ergebnisse konnten dabei allgemeine Empfehlungen für den Äußeren und Inneren Blitzschutz von regenerativen Energieerzeugungssystemen erstellt werden. Diese sollen in Schulungen einmünden, die für Hersteller und Betreiber von Hybridanlagen angeboten werden. Durch die Anwendung wird der Schutz der Anlagen vor Blitzeinwirkung und elektromagnetischen Störungen verbessert, was sich in einer reduzierten Ausfallwahrscheinlichkeit bzw. erhöhten Verfügbarkeit wiederspiegelt. An einigen ausgewählten Anlagen werden mit Hilfe der im Projekt involvierten Industriepartner die Schutzmaßnahmen realisiert. Hierbei entstanden den Eigentümern bzw. Betreibern der Anlagen keine Kosten. In diesem Beitrag werden beispielhaft drei Anlagenprojekte detailliert gezeigt. Es handelt sich dabei um eine Schweinezuchtfarm in Magallón (Spanien, Zaragozza), das bioklimatische Haus (Kreta, Heraklion) und die Tegernseer- Hütte (Deutschland, Lenggries).
Within the framework of the project a genderand diversity-oriented teaching evaluation and modern, media-supported blended learning approaches were used in order to achieve the intended goals. First research results of the literature and status quo analysis were already implemented and tested in newly designed teaching approaches, for example in a multidisciplinary introductory lecture of civil engineering at RWTH Aachen University.
[Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate.
In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection.
A German–Brazilian research project investigates sugarcane as an energy plant in anaerobic digestion for biogas production. The aim of the project is a continuous, efficient, and stable biogas process with sugarcane as the substrate. Tests are carried out in a fermenter with a volume of 10 l.
In order to optimize the space–time load to achieve a stable process, a continuous process in laboratory scale has been devised. The daily feed in quantity and the harvest time of the substrate sugarcane has been varied. Analyses of the digester content were conducted twice per week to monitor the process: The ratio of inorganic carbon content to volatile organic acid content (VFA/TAC), the concentration of short-chain fatty acids, the organic dry matter, the pH value, and the total nitrogen, phosphate, and ammonium concentrations were monitored. In addition, the gas quality (the percentages of CO₂, CH₄, and H₂) and the quantity of the produced gas were analyzed.
The investigations have exhibited feasible and economical production of biogas in a continuous process with energy cane as substrate. With a daily feeding rate of 1.68gᵥₛ/l*d the average specific gas formation rate was 0.5 m3/kgᵥₛ. The long-term study demonstrates a surprisingly fast metabolism of short-chain fatty acids. This indicates a stable and less susceptible process compared to other substrates.
A promising approach to reduce the system costs of molten salt solar receivers is to enable the irradiation of the absorber tubes on both sides. The star design is an innovative receiver design, pursuing this approach. The unconventional design leads to new challenges in controlling the system. This paper presents a control concept for a molten salt receiver system in star design. The control parameters are optimized in a defined test cycle by minimizing a cost function. The control concept is tested in realistic cloud passage scenarios based on real weather data. During these tests, the control system showed no sign of unstable behavior, but to perform sufficiently in every scenario further research and development like integrating Model Predictive Controls (MPCs) need to be done. The presented concept is a starting point to do so.
Reinforced concrete (RC) frames with masonry infills are frequently used in seismic regions all over the world. Generally masonry infills are considered as nonstructural elements and thus are typically neglected in the design process. However, the observations made after strong earthquakes have shown that masonry infills can modify the dynamic behavior of the structure significantly. The consequences were total collapses of buildings and loss of human lives. This paper presents the new system INODIS (Innovative Decoupled Infill System) developed within the European research project INSYSME (Innovative Systems for Earthquake Resistant Masonry Enclosures in RC Buildings). INODIS decouples the frame and the masonry infill by means of special U-shaped rubbers placed in between frame and infill. The effectiveness of the system was investigated by means of full scale tests on RC frames with masonry infills subjected to in-plane and out-of-plane loading. Furthermore small specimen tests were conducted to determine material characteristics of the components and the resistances of the connections. Finally, a micromodel was developed to simulate the in-plane behavior of RC frames infilled with AAC blocks with and without installation of the INODIS system.