Solar-Institut Jülich
Refine
Year of publication
- 2023 (3)
- 2022 (10)
- 2021 (6)
- 2020 (8)
- 2019 (5)
- 2018 (4)
- 2017 (1)
- 2016 (2)
- 2015 (5)
- 2014 (3)
- 2013 (2)
- 2012 (11)
- 2011 (17)
- 2010 (11)
- 2009 (14)
- 2008 (7)
- 2007 (1)
- 2006 (4)
- 2005 (3)
- 2004 (7)
- 2003 (1)
- 2002 (5)
- 2001 (1)
- 2000 (1)
- 1999 (2)
- 1998 (10)
- 1997 (2)
- 1996 (1)
- 1995 (2)
- 1993 (6)
- 1992 (5)
- 1991 (2)
- 1990 (1)
- 1985 (1)
- 1977 (2)
- 1974 (1)
Institute
- Solar-Institut Jülich (167)
- Fachbereich Energietechnik (26)
- ECSM European Center for Sustainable Mobility (15)
- Kommission für Forschung und Entwicklung (13)
- Fachbereich Bauingenieurwesen (7)
- Arbeitsstelle fuer Hochschuldidaktik und Studienberatung (1)
- Digitalisierung in Studium & Lehre (1)
- Fachbereich Luft- und Raumfahrttechnik (1)
- Institut fuer Angewandte Polymerchemie (1)
Document Type
- Conference Proceeding (167) (remove)
Keywords
- Energy storage (4)
- Power plants (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Hybrid energy system (3)
- Electricity generation (2)
- Solar thermal technologies (2)
- building information modelling (2)
- 3D printing (1)
- BIM (1)
Is part of the Bibliography
- no (167)
Retrofitting of existing parabolic trough collector power plants with molten salt tower systems
(2018)
Im Projekt Coolplan‐ AIR geht es um die Fortentwicklung und Feld‐ Validierung eines Berechnungs‐ und Auslegungstools zur energieeffizienten Kühlung von Gebäuden mit luftgestützten Systemen. Neben dem Aufbau und der Weiterentwicklung von Simulationsmodellen erfolgen Vermessungen der Gesamtsysteme anhand von Praxisanlagen im Feld. Eine der betrachteten Anlagen arbeitet mit indirekter Verdunstung. Diese Veröffentlichung zeigt den Entwicklungsprozess und den Aufbau des Simulationsmodells zur Verdunstungskühlung in der Simulationsumgebung Matlab‐ Simulink mit der CARNOT‐ Toolbox. Das besondere Augenmerk liegt dabei auf dem physikalischen Modell des Wärmeübertragers, in dem die Verdunstung implementiert ist. Dem neuen Modellansatz liegt die Annahme einer aus der Enthalpie‐ Betrachtung hergeleiteten effektiven Wärmekapazität zugrunde. Des Weiteren wird der Befeuchtungsgrad als konstant angesehen und eine standardisierte Zunahme der Wärmeübertragung des feuchten gegenüber dem trockenen Wärmeübertrager angenommen. Die Validierung des Modells erfolgte anhand von Literaturdaten. Für den trockenen Wärmetauscher ist der maximale absolute Fehler der berechneten Austrittstemperatur (Zuluft) kleiner als ±0.1 K und für den nassen Wärmetauscher (Kühlfall) unter der Annahme eines konstanten Verdunstungsgrades kleiner als ±0.4 K.
New materials often lead to innovations and advantages in technical applications. This also applies to the particle receiver proposed in this work that deploys high-temperature and scratch resistant transparent ceramics. With this receiver design, particles are heated through direct-contact concentrated solar irradiance while flowing downwards through tubular transparent ceramics from top to bottom. In this paper, the developed particle receiver as well as advantages and disadvantages are described. Investigations on the particle heat-up characteristics from solar irradiance were carried out with DEM simulations which indicate that particle temperatures can reach up to 1200 K. Additionally, a simulation model was set up for investigating the dynamic behavior. A test receiver at laboratory scale has been designed and is currently being built. In upcoming tests, the receiver test rig will be used to validate the simulation results. The design and the measurement equipment is described in this work.
Development of open educational resources for renewable energy and the energy transition process
(2021)
The dissemination of knowledge about renewable energies is understood as a social task with the highest topicality. The transfer of teaching content on renewable energies into digital open educational resources offers the opportunity to significantly accelerate the implementation of the energy transition. Thus, in the here presented project six German universities create open educational resources for the energy transition. These materials are available to the public on the internet under a free license. So far there has been no publicly accessible, editable media that cover entire learning units about renewable energies extensively and in high technical quality. Thus, in this project, the content that remains up-to-date for a longer period is appropriately prepared in terms of media didactics. The materials enable lecturers to provide students with in-depth training about technologies for the energy transition. In a particular way, the created material is also suitable for making the general public knowledgeable about the energy transition with scientifically based material.
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.