Part of a Book
Refine
Year of publication
Document Type
- Part of a Book (35) (remove)
Language
- English (35) (remove)
Keywords
- Engineering optimization (2)
- robotic process automation (2)
- Advanced driver assistance systems (ADAS/AD) (1)
- Autonomous mobile robots (1)
- BEV (1)
- Change culture (1)
- Charging stations (1)
- Controller Parameter (1)
- E-carsharing (1)
- E-mobility (1)
- Energy efficiency (1)
- Fully connected car (1)
- Gamification (1)
- Gearbox (1)
- Global optimization (1)
- ISO 26262 (1)
- Inductive charging (1)
- Industry 4.0 (1)
- Information and communication technology (1)
- Integrated mobility (1)
- Interactive process mining (1)
- Leaderboard (1)
- Lean thinking (1)
- Level Control System (1)
- MINLP (1)
- Machine learning (1)
- Methodology (1)
- Mixed-integer nonlinear black-box optimization (1)
- Mixed-integer nonlinear problem (1)
- Mobility management (1)
- Multi-criteria optimization (1)
- Multi-robot systems (1)
- Network (1)
- Objective data (1)
- Optimal Closed Loop (1)
- Optimal Topology (1)
- Optimization (1)
- Paper recycling (1)
- Powertrain (1)
- Process engineering (1)
- Product family optimization (1)
- RoboCup (1)
- Robotic process automation (1)
- Safety of the intended functionality (SOTIF) (1)
- Safety-critical systems validation (1)
- Smart factory (1)
- Software development (1)
- Software testing (1)
- Technical Operation Research (1)
- Urban areas (1)
- WLTP (1)
- Water (1)
- applications (1)
- artificial intelligence (1)
- business process automation (1)
- commercial offthe- shelf solutions (1)
- culpability (1)
- liability (1)
- management (1)
- research framework (1)
- software evaluation (1)
- software selection (1)
- technology (1)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (35) (remove)
Because of customer churn, strong competition, and operational inefficiencies, the telecommunications operator ME Telco (fictitious name due to confidentiality) launched a strategic transformation program that included a Business Process Management (BPM) project. Major problems were silo-oriented process management and missing cross-functional transparency. Process improvements were not consistently planned and aligned with corporate targets. Measurable inefficiencies were observed on an operational level, e.g., high lead times and reassignment rates of the incident management process.