Conference Proceeding
Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (139) (remove)
Document Type
- Conference Proceeding (139) (remove)
Keywords
- Kanalisation (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
- Geodatenbank (3)
- Geodatenhaltung (3)
- Geoinformationen (3)
- Geoinformationssystem (3)
Is part of the Bibliography
- no (139)
Die ökologische Umgestaltung der Dhünn in Leverkusen – Ein Beispiel für die praktische Planung
(2009)
Dipl.-Ing. (FH) Dieter Stein M.Sc (Environmental Engineering) - Landschaftsarchitekt AKNW, Grevenbroich. 14 Seiten ( S. 78-91). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Zusammenfassung [des Autors] Unter Berücksichtigung vorhandener örtlicher Gegebenheiten und technischer Einrichtungen (wie z.B. Verkehrstrassen, Versorgungsleitungen, Einlaufbauwerke etc.) hat die Dhünn innerhalb der Deiche mehr Bewegungsfreiheit erhalten. Der Hochwasserschutz bleibt dabei weiterhin gewährleistet. Die Gehölzstrukturen im Uferbereich wurden weitgehend erhalten. Dort, wo die Bauarbeiten eine Entfernung von Gehölzen erforderlich machten, wurden die Flächen bewusst einer eigenständigen Entwicklung überlassen. In diesen Bereichen werden sich im Laufe der Zeit von selbst neue Pflanzen und Gehölze ansiedeln. Mit der naturnahen Umgestaltung der Dhünn als "Starthilfe" kann die Natur die weitere Entwicklung übernehmen: Tier- und Pflanzenarten können sich das ehemals kanalartig ausgebaute Gewässer "zurückerobern", Fische und Kleintiere finden Nahrung und Ruheplätze. Für die Menschen entsteht ein wertvoller Erholungsraum mitten in der Stadt. Trotz zahlreicher Akteure und erheblicher Restriktionen konnte das Projekt in relativ kurzer Zeit realisiert werden. Dem Wupperverband (Untere Lichtenplatzer Str. 100; 42289 Wuppertal) und hier vor allem den Projektleitern Herrn Arnim Lützenberger und Herrn Andreas Oberborbeck sei an dieser Stelle besonders für eine hervorragende Zusammenarbeit gedankt.
The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions.
Energiebilanzen und -potenziale von Abwasseranlagen : Vorstellung neuer Untersuchungsvorhaben in NRW
(2010)
Dipl.-Ing. Dirk Hecker von der Ingenieurgesellschaft Tuttahs & Meyer in Aachen. Vortrag gehalten beim 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen> 27 S. (S. 28-54) Zusammenfassung [des Autors]: Nach den spektakulären Hochwasserereignissen an Rhein, Elbe und Donau hat die Deutsche Vereinigung für Wasserwirtschaft, Abwasser und Abfall e. V. (DWA) einen Fachausschuss zur Erstellung eines Merkblattes M 103 „Hochwasserschutz für Abwasseranlagen“ berufen. Das Merkblatt zeigt in den Kapiteln Konzeption, Planungsgrundsätze und Hochwassermanagement eine strukturierte Vorgehensweise zur bestmöglichen Vorsorge zum Schutz der Abwasseranlagen im Hochwasserfall. Entsprechend den Forderungen des im Jahr 2005 verabschiedeten Gesetzes zur Verbesserung des vorbeugenden Hochwasserschutzes, floss in das Wasserhaushaltsgesetz unter anderem die allgemeine Verpflichtung jedes potentiell vom Hochwasser Betroffenen ein, geeignete Schutzmaßnahmen zur Schadensminimierung zu treffen. Hierbei werden speziell die Wasserversorgung und die Abwasserbeseitigung erwähnt. Im DWA-M 103 wir detailliert dargestellt wie und mit welchem Aufwand die Abwasseranlagen zu überprüfen sind und wie hierzu ein Hochwasserschutzkonzept erstellt werden kann. Zusätzlich werden Hinweise für die Planung von Abwasseranlagen in hochwassergefährdeten Bereichen gegeben, die den störungsfreien Betrieb im Hochwasserfall gewährleisten sollen. Schlussendlich werden das Hochwassermanagement und der Betrieb dargestellt und hier wichtige Anregungen gegeben im Ernstfall ausreichend vorbereitet zu sein. Das DWA-M 103 richtet sich in erster Linie an die Betreiber und Planer von Abwasseranlagen. Jedoch werden hier auch, gerade durch die Vielzahl von Checklisten, Kommunen Denkanstöße und Anregungen für die Hochwasservorsorge/-schutz von öffentlichen Gebäuden und Einrichtungen gegeben.
The replacement of existing spillway crests or gates with labyrinth weirs is a proven techno-economical means to increase the discharge capacity when rehabilitating existing structures. However, additional information is needed regarding energy dissipation of such weirs, since due to the folded weir crest, a three-dimensional flow field is generated, yielding more complex overflow and energy dissipation processes. In this study, CFD simulations of labyrinth weirs were conducted 1) to analyze the discharge coefficients for different discharges to compare the Cd values to literature data and 2) to analyze and improve energy dissipation downstream of the structure. All tests were performed for a structure at laboratory scale with a height of approx. P = 30.5 cm, a ratio of the total crest length to the total width of 4.7, a sidewall angle of 10° and a quarter-round weir crest shape. Tested headwater ratios were 0.089 ≤ HT/P ≤ 0.817. For numerical simulations, FLOW-3D Hydro was employed, solving the RANS equations with use of finite-volume method and RNG k-ε turbulence closure. In terms of discharge capacity, results were compared to data from physical model tests performed at the Utah Water Research Laboratory (Utah State University), emphasizing higher discharge coefficients from CFD than from the physical model. For upstream heads, some discrepancy in the range of ± 1 cm between literature, CFD and physical model tests was identified with a discussion regarding differences included in the manuscript. For downstream energy dissipation, variable tailwater depths were considered to analyze the formation and sweep-out of a hydraulic jump. It was found that even for high discharges, relatively low downstream Froude numbers were obtained due to high energy dissipation involved by the three-dimensional flow between the sidewalls. The effects of some additional energy dissipation devices, e.g. baffle blocks or end sills, were also analyzed. End sills were found to be non-effective. However, baffle blocks with different locations may improve energy dissipation downstream of labyrinth weirs.
Dr.-Ing. Raju M. Rohde , Dorsch Consult Wasser und Umwelt GmbH, München mit 32 Folien (S. 103-134). Beitrag zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen>. Das System BaSYS.L.E.O. Ganglinien-Volumen-Methode Hydrodynamische Kanalnetzberechnung Hydraulische Objekte Hydrodynamische Schmutzfrachtberechnung
In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future.
Air-water flows can be found in different engineering applications: from nuclear engineering to huge hydraulic structures. In this paper, a single tip fibre optical probe has been used to record high frequency (over 1 MHz) phase functions at different locations of a stepped spillway. These phase functions have been related to the interfacial velocities by means of Artificial Neural Networks (ANN) and the measurements of a classical double tip conductivity probe. Special attention has been put to the input selection and the ANN dimensions. Finally, ANN have shown to be able to link the signal rising times and plateau shapes to the air-water interfacial velocity.
Dipl.-Ing. Stefan Overkamp - GISWORKS GbR, Velbert. 11 S. (S. 7-17). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Aus der Gliederung: 1 Geoinformationssysteme 2 Anforderungen an eine kommunale Geodateninfrastruktur (GDI) 3 Komponenten einer GDI 3.1 Geodatenmanagement 3.2 Geodatenhaltung 3.3 High-End-GIS 3.4 intraGIS 4 GISWORKS 5 Weiterführende Informationen