Refine
Document Type
- Conference Proceeding (18)
- Article (3)
Has Fulltext
- yes (21) (remove)
Keywords
- Blitzschutz (18)
- Lightning protection (11)
- Risikomanagement (4)
- reinforced concrete (4)
- Elektromagnetischer Schutzschild (3)
- Lightning (3)
- Risikoabschätzung (3)
- Risk management (3)
- Stahlbetonkonstruktion (3)
- renewable energy (3)
- Direkter Blitzschlag (2)
- Erneuerbare Energien (2)
- Hybridsystem (2)
- Induzierte Spannungen (2)
- Lightning Protection (2)
- Magnetische Felder (2)
- Regenerative Energieanlagen (2)
- Risikoabwägung (2)
- Risk assessment (2)
- electromagnetic shielding (2)
Institute
In the presented paper data collected from the field related to damage statistics of electrical and electronic apparatus in household are reported and investigated. These damages (total number approx. 74000 cases), registered by five German insurance companies in 2005 and 2006, were adviced by customers as caused by lightning overvoltages. With the use of stochastical methods it is possible, to reasses the collected data and to distinguish between cases, which are with high probability caused by lightning overvoltages, and those, which are not. If there was an indication for a direct strike, this case was excluded, so the focus was only on indirect lightning flashes, i.e. only flashes to ground near the structure and flashes to or nearby an incoming service line were investigated. The data from the field contain the location of damaged apparatus (residence of the policy holder) and the distances of the nearest cloud-to-ground stroke to the location of the damage registered by the German lightning location network BLIDS at the date of damage. The statistical data along with some complementary numerical simulations allow to verify the correspondence of the Standards rules used for IEC 62305-2 with the field data and to define some correction needs. The results could lead to a better understanding whether a damage reported to an insurance company is really caused by indirect lightning, or not.
Die Einleitung zur Norm DIN EN 62305-3 beschreibt klar und ein - deutig: Der vorliegende Teil der IEC 62305 behandelt den Schutz von baulichen Anlagen gegen materielle Schäden und den Schutz von Personen gegen Verletzungen durch Berührungs- und Schrittspannungen. Als das wesentlichste und effektivste Mittel zum Schutz von baulichen Anlagen gegen materielle Schäden gilt das Blitz - schutzsystem (LPS).
[Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate.
8. VDE/ABB-Blitzschutztagung, 29. - 30. Oktober 2009 in Neu-Ulm. Blitzschutztagung <8, 2009, Neu-Ulm> Berlin : VDE Verl. 2009 Großkraftwerke können durch Blitzentladungen mit potentiellen Auswirkungen auf deren Verfügbarkeit und Sicherheit gefährdet werden. Ein sehr spezielles Szenario, welches aus aktuellem Anlass zu untersuchen war, betrifft den kraftwerksnahen Blitzeinschlag in die Hochspannungs-Freileitung am Netzanschluss der Anlage. Wird nun noch ein sogenannter Schirmfehler unterstellt, d.h. der direkte Blitzeinschlag erfolgt in ein Leiterseil des Hoch- bzw. Höchstspannungsnetzes und nicht in das darüber gespannte Erdseil, so bedeutet dies eine extreme elektromagnetische Einwirkung. Der vorliegende Beitrag befasst sich mit der Simulation eines solchen Blitzeinschlages und dessen Auswirkungen auf den Netzanschluss und die Komponenten der elektrischen Eigenbedarfsanlagen eines Kraftwerks auf den unterlagerten Spannungsebenen. Die dabei gewonnenen Erkenntnisse lassen sich ohne Einschränkungen auf Industrieanlagen mit Mittelspannungs-Netzanschluss und ohne eigener Stromversorgung übertragen.
IEC Technical Committee 81 is currently creating the new IEC 62305 series of standards on Lightning Protection. Working Group 9 is responsible for Part 2 of this series, which deals with the assessment and management of risk its CDV (Committee Draft for Voting) stage and has been circulated to National Committees for comment. The paper details the development of the Simplified IEC Risk Assessment Calculator software tool as described in Informative Annex J of IEC62305-2 Ed.1/CDV 2. This tool is intended as a simplified implementation of the more rigorous treatment of risk management found in the written document. It is designed to be relatively intuitive for users who wish to obtain an initial assessment of risk sensitivity, but should not be considered a substitute to a full understanding of the methods provided in the standard when dealing with more complicated structures or those where greater risks to personal or system operation are involved.
In the paper the results obtained from experiments at a modelled reinforced building in case of a direct lightning strike are compared with calculations. The comparison includes peak values of the magnetic field Hmax, its derivative (dH/dt)max and of induced voltages umax in typical cable routings. The experiments are performed at a 1:6 scaled building and the results are extrapolated using the similarity relations theory. The calculations are based on the approximate formulae given in IEC 62305-4 and have to be supplemented by a rough estimation of the additional shielding effect of a second reinforcement layer. The comparison shows, that the measured peak values of the magnetic field and its derivative are mostly lower than the calculated. The induced voltages are in good agreement. Hence, calculations of the induced voltages based on IEC 62305-4 are a good method for lightning protection studies of buildings, where the reinforcement is used as a grid-like electromagnetic shield.
For the application of the concept of Lightning Protection Zones (LPZ), the knowledge of the magnetic fields and induced voltages inside a structure is necessary. Laboratory experiments have been conducted at a downscaled model of a building (scale factor 1:6) to determine these electromagnetic quantities in case of a direct strike to the structure. The model (3 m x 2 m x 2 m) represented a small industrial building using the reinforcement of the concrete as electromagnetic shield. The magnetic fields and magnetic field derivatives were measured at several location inside the scaled model. Further, the voltages induced on three typical cable routes inside the model was determined. The influence of the lightning current waveshape, point-of-strike, bonding of the cable routes, and bridging of an expansion joint in the middle of the building on these quantities was studied.
Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht immer geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Vornorm DIN V 0185-2 VDE V 0185 Teil 2 [1] gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 [2, 3] detailliert beschrieben.
Ein vorausschauendes Risikomanagement beinhaltet, Risiken zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent,welche Risiken sinnvoll über Versicherungen abgedeckt werden sollten. Bei Unternehmen, die mit umfangreichen elektronischenEinrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nichtverfügbarkeit der elektronischen Einrichtungen und damit derProduktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardwareschaden an der betroffenen Anlage oft bei weitem übersteigt.
Ein von der Arbeitsgemeinschaft (AG) Solar NRW und diversen Industriepartnern gefördertes und an der Fachhochschule Aachen, Abt. Jülich durchgeführtes Forschungsprojekt „Blitzschutz für netz-autarke Hybridanlagen“ machte es möglich, sich mit dem Blitzschutz speziell solcher Anlagen näher zu beschäftigen. Vermehrt bekannt gewordene Schadensfälle an nicht netz-gekoppelten Hybridanlagen waren der Auslöser, den Schutz zu überdenken. Definiertes Ziel war es, für netz-autarke energietechnische Anlagen ein Konzept zum Schutz vor Blitzeinwirkungen zu erstellen. Diese Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaikanlagen, ggf. auch Solarthermieanlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet). Zur Erhöhung der Versorgungssicherheit kann noch ein Dieselaggregat dazukommen. Hybridanlagen werden vor allem in Gebieten mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in relativ dünn bewohnten Gebieten und in Entwicklungsländern. Dem Blitzschutz von Hybridanlagen kommt dabei eine steigende Bedeutung zu. Besonderes Augenmerk in dem genannten Forschungsprojekt sollte dabei auf die technisch/wirtschaftliche Ausgewogenheit des Schutzes gelegt werden: • die Schutzmaßnahmen sollen nur in solchen Fällen eingesetzt werden, wo dies als Ergebnis von Risikoanalysen sinnvoll erscheint; • für typische netz-autarke Hybridanlagen sollen die Schutzmaßnahmen ohne deutliche Verteuerung realisierbar sein (es soll also kein absoluter Schutz realisiert werden; ggf. soll lediglich der auftretende Schaden soweit möglich minimiert werden). Dazu wurde in einem ersten Schritt zunächst eine Aufnahme des Iststandes einiger typischer netz-autarker Hybridanlagen und deren einzelnen Komponenten durchgeführt. Aufgrund dessen wurde eine umfassende Risikoanalyse zur Blitzbedrohung dieser Anlagen auf der Basis von VDE V 0185 Teil 2:2002-11 [1] erstellt. Die Ergebnisse mündeten in ein technisch/wirtschaftlich ausgewogenes Konzept für den Anlagen- Blitzschutz (d.h. insbesondere dem Schutz vor direkten Blitzeinschlägen und deren unmittelbaren Auswirkungen) nach VDE V 0185 Teil 3:2002-11 [2] und für den Elektronik-Blitzschutz (d.h. für den Schutz vor Überspannungen durch direkte, insbesondere aber auch indirekte Blitzeinschläge) nach VDE V 0185 Teil 4:2002-11 [3]. Aufgrund der gesammelten Ergebnisse konnten dabei allgemeine Empfehlungen für den Äußeren und Inneren Blitzschutz von regenerativen Energieerzeugungssystemen erstellt werden. Diese sollen in Schulungen einmünden, die für Hersteller und Betreiber von Hybridanlagen angeboten werden. Durch die Anwendung wird der Schutz der Anlagen vor Blitzeinwirkung und elektromagnetischen Störungen verbessert, was sich in einer reduzierten Ausfallwahrscheinlichkeit bzw. erhöhten Verfügbarkeit wiederspiegelt. An einigen ausgewählten Anlagen werden mit Hilfe der im Projekt involvierten Industriepartner die Schutzmaßnahmen realisiert. Hierbei entstanden den Eigentümern bzw. Betreibern der Anlagen keine Kosten. In diesem Beitrag werden beispielhaft drei Anlagenprojekte detailliert gezeigt. Es handelt sich dabei um eine Schweinezuchtfarm in Magallón (Spanien, Zaragozza), das bioklimatische Haus (Kreta, Heraklion) und die Tegernseer- Hütte (Deutschland, Lenggries).