Refine
Year of publication
Institute
- Solar-Institut Jülich (340) (remove)
Document Type
- Conference Proceeding (167)
- Article (107)
- Part of a Book (24)
- Report (20)
- Book (17)
- Doctoral Thesis (3)
- Contribution to a Periodical (2)
Keywords
Optimisation of a urea selective catalytic reduction system with a coated ceramic mixing element
(2017)
Das Forschungsvorhaben Optiox beschäftigt sich mit der Optimierung eines Belüftungsbeckens zur Rauchgasentschwefelung fossil befeuerter Kraftwerke mittels Seewasser. Unter Neutralisierung der entstehenden Hydroniumionen (H3O+) durch die natürliche Alkalität des Seewassers dissoziiert Schwefeldioxid aus dem Rauchgase im vorgeschalteten Absorber beim Phasenübergang von der Gas- in die Flüssigphase zu Sulfiten. Im Belüftungsbecken werden diese Sulfite mittels eingeblasener Luft zu Sulfaten oxidiert, was zu einer geringen Erhöhung der Sulfatfracht vor Einleitung ins Meer führt, die unterhalb der natürlichen Schwankungen liegt. Daneben dient das Belüftungsbecken der Konditionierung des Seewassers hinsichtlich pH-Wert und Sauerstoffgehalt und ist mit hoch effizienten Belüftern ausgestattet, deren Spezifikation den jeweiligen Randbedingungen, wie Abscheideleistung des Absorbers, Beckengeometrie sowie lokalen Gegebenheiten angepasst wird.
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.
As part of the transnational research project EDITOR, a parabolic trough collector system (PTC) with concrete thermal energy storage (C-TES) was installed and commissioned in Limassol, Cyprus. The system is located on the premises of the beverage manufacturer KEAN Soft Drinks Ltd. and its function is to supply process steam for the factory's pasteurisation process [1]. Depending on the factory's seasonally varying capacity for beverage production, the solar system delivers between 5 and 25 % of the total steam demand. In combination with the C-TES, the solar plant can supply process steam on demand before sunrise or after sunset. Furthermore, the C-TES compensates the PTC during the day in fluctuating weather conditions. The parabolic trough collector as well as the control and oil handling unit is designed and manufactured by Protarget AG, Germany. The C-TES is designed and produced by CADE Soluciones de Ingeniería, S.L., Spain. In the focus of this paper is the description of the operational experience with the PTC, C-TES and boiler during the commissioning and operation phase. Additionally, innovative optimisation measures are presented.