Refine
Year of publication
- 2001 (106) (remove)
Institute
- Fachbereich Medizintechnik und Technomathematik (48)
- INB - Institut für Nano- und Biotechnologien (39)
- Fachbereich Elektrotechnik und Informationstechnik (20)
- Fachbereich Chemie und Biotechnologie (12)
- Fachbereich Energietechnik (11)
- Fachbereich Luft- und Raumfahrttechnik (6)
- Fachbereich Wirtschaftswissenschaften (5)
- Fachbereich Maschinenbau und Mechatronik (2)
- ECSM European Center for Sustainable Mobility (1)
- Fachbereich Gestaltung (1)
Language
- English (106) (remove)
Document Type
- Article (88)
- Conference Proceeding (12)
- Book (6)
Keywords
- Einspielen <Werkstoff> (2)
- Blitzschutz (1)
- Einspielanalyse (1)
- Erneuerbare Energien (1)
- FEM (1)
- Finite-Elemente-Methode (1)
- Hybridsystem (1)
- Lightning protection (1)
- Materialermüdung (1)
- Renewable energy (1)
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
Rapid Prototyping and PIV
(2001)
Laserwelding with fillerwire
(2001)
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.