Refine
Year of publication
Document Type
- Conference Proceeding (30) (remove)
Keywords
- Blitzschutz (15)
- Lightning protection (9)
- reinforced concrete (4)
- Elektromagnetischer Schutzschild (3)
- Lightning (3)
- Risikomanagement (3)
- Stahlbetonkonstruktion (3)
- Direkter Blitzschlag (2)
- Erneuerbare Energien (2)
- Hybridsystem (2)
- Induzierte Spannungen (2)
- Lightning Protection (2)
- Lightning protection system (2)
- Magnetische Felder (2)
- Risikoabschätzung (2)
- Risikoabwägung (2)
- Risk management (2)
- electromagnetic shielding (2)
- hybrid system (2)
- photovoltaic system (2)
Institute
- Fachbereich Energietechnik (30) (remove)
Extrem hohe Blitzströme
(2017)
The 2nd edition of the lightning risk management
standard (IEC 62305-2) considers structures, which may
endanger environment. In these cases, the loss is not limited to
the structure itself, which is valid for usual structures. In the past
(Edition 1) this danger was simply taken into account by a special
hazard factor, multiplying the existing risk for the structure with
a number. Now, in the edition 2, we add to the risk for the
structure itself a “second risk” due to the losses outside the
structure. The losses outside can be treated independently from
what occurs inside. This is a major advantage to analyze the risk
for sensitive structures, like chemical plants, nuclear plants, or
structures containing explosives, etc. In this paper, the existing
procedure given by the European version EN 62305-2 Ed.2 is
further developed and applied to a few structures.
In IEC 61312-2 equations for the assessment of the magnetic fields inside structures due to a direct lightning strike are given. These equations are based on computer simulations for shields consisting of a single-layer steel grid of a given mesh width. Real constructions, however, contain at least two layers of reinforcement steel grids. The objective of this study was to experimentally determine the additional shielding effectiveness of a second reinforcement layer compared to a single-layer grid. To this end, simulated structures were set up in the high current laboratory. The structures consisted of cubic cages of 2 m side length with one or with two reinforcement grids, respectively. The structures were exposed to direct lightning currents representing the variety of anticipated lightning current waveforms. The magnetic fields and their derivatives at several positions inside the structure as well as the voltage between “floor” and “roof” in the center were determined for different current injection points. From these data the improvement of the shielding caused by a second reinforcement layer is derived.
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.
In the paper the results obtained from experiments at a modelled reinforced building in case of a direct lightning strike are compared with calculations. The comparison includes peak values of the magnetic field Hmax, its derivative (dH/dt)max and of induced voltages umax in typical cable routings. The experiments are performed at a 1:6 scaled building and the results are extrapolated using the similarity relations theory. The calculations are based on the approximate formulae given in IEC 62305-4 and have to be supplemented by a rough estimation of the additional shielding effect of a second reinforcement layer. The comparison shows, that the measured peak values of the magnetic field and its derivative are mostly lower than the calculated. The induced voltages are in good agreement. Hence, calculations of the induced voltages based on IEC 62305-4 are a good method for lightning protection studies of buildings, where the reinforcement is used as a grid-like electromagnetic shield.
For the application of the concept of Lightning Protection Zones (LPZ), the knowledge of the magnetic fields and induced voltages inside a structure is necessary. Laboratory experiments have been conducted at a downscaled model of a building (scale factor 1:6) to determine these electromagnetic quantities in case of a direct strike to the structure. The model (3 m x 2 m x 2 m) represented a small industrial building using the reinforcement of the concrete as electromagnetic shield. The magnetic fields and magnetic field derivatives were measured at several location inside the scaled model. Further, the voltages induced on three typical cable routes inside the model was determined. The influence of the lightning current waveshape, point-of-strike, bonding of the cable routes, and bridging of an expansion joint in the middle of the building on these quantities was studied.
Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden.