Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (712) (remove)
Document Type
- Article (334)
- Conference Proceeding (139)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
Keywords
- Kanalisation (4)
- Wasserbau (4)
- Wasserwirtschaft (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
Stahlbau
(2015)
Es ist zwischen Stählen bis S460 und solchen mit höherer Streckgrenze zu unterscheiden. Stähle bis S460 sind auch für die plastische Tragwerksberechnung nach dem Fließgelenkverfahren zugelassen. Bei Stählen oberhalb S460 bis S700 ist neben der elastischen eine nichtlineare plastische Tragwerksberechnung unter Berücksichtigung von Teilplastizierungen von Bauteilen in Fließzonen möglich.
Stahlbau
(2015)
A comparative performance analysis of the CFD platforms OpenFOAM and FLOW-3D is presented, focusing on a 3D swirling turbulent flow: a steady hydraulic jump at low Reynolds number. Turbulence is treated using RANS approach RNG k-ε. A Volume Of Fluid (VOF) method is used to track the air–water interface, consequently aeration is modeled using an Eulerian–Eulerian approach. Structured meshes of cubic elements are used to discretize the channel geometry. The numerical model accuracy is assessed comparing representative hydraulic jump variables (sequent depth ratio, roller length, mean velocity profiles, velocity decay or free surface profile) to experimental data. The model results are also compared to previous studies to broaden the result validation. Both codes reproduced the phenomenon under study concurring with experimental data, although special care must be taken when swirling flows occur. Both models can be used to reproduce the hydraulic performance of energy dissipation structures at low Reynolds numbers.
Self-aeration is traditionally explained by the water turbulent boundary layer outer edge intersection with the free surface. This paper presents a discussion on the commonly accepted hypothesis behind the computation of the critical point of self-aeration in spillway flows and a new formulation is proposed based on the existence of a developing air flow over the free surface. Upstream of the inception point of self-aeration, some surface roughening has been often reported in previous studies which consequently implies some entrapped air transport and air–water flows coupling. Such air flow is proven in this study by presenting measured air velocities and computing the air boundary layer thickness for a 1V:2H smooth chute flow. Additionally, the growth rate of free surface waves has been analysed by means of Ultrasonic Sensors measurements, obtaining also the entrapped air concentration. High-speed camera imaging has been used for qualitative study of the flow perturbations.
Application of the optical flow method to velocity determination in hydraulic structure models
(2016)
Schalung und Gerüste
(2016)
Systemschalungen und Systemgerüste haben den Baustellenbetrieb in vielen Bereichen sehr vereinfacht. Dennoch sind Kenntnisse in diesen Feldern für eine erfolgreiche und effektive Bauleitung unverzichtbar. In diesem Kapitel werden Hinweise und Empfehlungen für die Bemessung und Einsatz von Schalungen, Trag- und Arbeitsgerüsten für den Baustellenbetrieb gegeben.
Kosten- und Verfahrensvergleiche können dabei zur Ermittlung des für die Aufgabe geeignetsten Bauverfahren führen. Für die sich daran anschließende Ablaufplanung werden die verschiedenen graphischen sowie rechnerischen Instrumente (Terminliste und Taktplan, Balkenplan, Weg-Zeit-Diagramm und Netzplan) erläutert und anhand von Beispielen vertieft. Schließlich wird ein im Rahmen der Arbeits- und Nachkalkulation vorzunehmender Soll-Ist-Vergleich mit Hilfe des Bauarbeitsschlüssels (BAS) zur Überprüfung der Aufwands- und Leistungswerte dargestellt.
Boden, Baugrube, Verbau
(2016)
Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt.
Neben dem durch Unfälle und Krankheiten entstehenden menschlichen Leids und der daraus resultierenden moralischen Verpflichtung, sich und seine Mitmenschen vor Schaden zu bewahren, ist der Arbeits- und Gesundheitsschutz auch ein Gebot wirtschaftlichen Handelns, da Arbeitsunfälle und Berufskrankheiten Ausfallzeiten und Kosten verursachen. So gehören Arbeits- und Gesundheitsschutz zu den wichtigen Aufgaben eines Unternehmens.
Vermessung
(2016)
Bauwirtschaft und Baurecht
(2016)
Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals aufseiten der Auftraggeber, aber auch seitens der Bauunternehmen während der Bauausführung sowie der besonderen Verantwortung der Beratenden Ingenieure werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen. Intensive Beachtung finden auch die Auswirkungen des Öffentlichen Baurechts (Baugesetzbuch, Bauordnung NRW, Baunutzungsverordnung) auf Planung, Bau und Betrieb baulicher Anlagen und der dabei verwendeten Bauprodukte.
Baukosten und Finanzierung
(2016)
Das Gesetz gegen Wettbewerbsbeschränkungen bildet die Grundlage für die Verordnung über die Vergabe öffentlicher Aufträge, aus der sich die Vergabe- und Vertragsordnungen für Freiberufliche Leistungen (VOF), für Lieferungen und Leistungen (VOL) und für Bauleistungen (VOB) ableiten. Die dabei in Frage kommenden Vergabeverfahren und die einzelnen Schwellenwerte gemäß EU-Recht werden detailliert aufbereitet und im Zusammenhang dargestellt.
Die für die Ausgestaltung von Bauverträgen notwendigen Grundlagen des Werkvertragsrecht nach BGB sowie die branchenspezifischen Allgemeinen Geschäftsbedingungen in Form der Vertragsordnung für Bauleistungen (VOB) mit ihren Zusätzlichen und Besonderen Vertragsbedingungen werden intensiv aufbereitet. Das Zustandekommen eines Bauvertrages ergibt sich dann aus der notwendigen Leistungsbeschreibung mit einem Leistungsverzeichnis und verschiedenen Positionen oder in Form einer Funktionalen Leistungsbeschreibung (Beschreibung mit Leistungsprogramm).
Das Auslandsgeschäft der Baubranche (Bauausführende Unternehmen sowie Beratende Ingenieure und Consultants) wird von den jeweils vorliegenden Internationalen Wettbewerbsbedingungen bestimmt, deren Zusammenhänge anhand umfangreicher statistischer Daten und anhand von Beispielen dargestellt werden.
Zur Anwendung des Eurocode 3 Teil 1-2 für die Heißbemessung und Anregungen für dessen Novellierung
(2016)
Die Eurocodes werden bis zum Jahr 2020 im Europäischen Komitee für Normung (CEN), Technisches Komitee TC 250, überarbeitet. In Vorbereitung auf die Eurocode-Novellierung haben engagierte Ingenieure im Rahmen der Initiative PraxisRegeln Bau (PRB) die für die praktische Anwendung häufig genutzten Teile des Eurocode 3 untersucht. Mit dem Ziel, die Praxistauglichkeit des Eurocode 3 für die Heißbemessung zu verbessern, wurden die bestehende Norm EN 1993 Teil 1-2 insbesondere in Bezug auf die Anwenderfreundlichkeit analysiert und Vorschläge für die europäische Novellierung erarbeitet. Die Analysen zeigen, dass durch Umstrukturierungen und durch die Einführung von Tabellen die Verständlichkeit und Anwenderfreundlichkeit der Regeln für die Heißbemessung bedeutend erhöht werden können.
Mit steigenden Dämmstandards und höheren Komfortanforderungen der Nutzer gerät die Problematik der sommerlichen Überhitzung zunehmend in den Fokus. Um die Überhitzung möglichst gering zu halten, sind Maßnahmen und Lösungen zu entwickeln, die den potenziellen Kühlbedarf eines Gebäudes vermeiden sowie reduzieren. Im Rahmen des europäischen Forschungsprojektes BATIMASS wurden Techniken untersucht, die die sommerliche Raumtemperatur ohne zusätzliche Kühlung (passiv) oder aber mit energieeffizienter wasserbasierter Flächenkühlung (aktiv) reduzieren und die besonders für Gebäude in Stahl(leicht)bauweise geeignet sind. Dafür wurde die Methodik der thermisch äquivalenten Decke weiterentwickelt, um das thermische Verhalten von Profilblechdecken in Gebäuden für beide Lösungsansätze analysieren zu können. Darüber hinaus wurde der Einsatz von Phasenwechselmaterial (PCM) zur Steigerung der Speicherfähigkeit von leichten Decken mit besonders geringer thermischer Masse in Simulationen sowie im Labor untersucht und bewertet.
The main objective of the BATIMASS project was to address how the energy balance in relatively lightweight steel buildings can be improved by building in ‘active thermal mass’ (ATM) into the building fabric. This was achieved through concept design, dynamic thermal modelling and testing of a number of potentially viable systems and concepts. A significant programme of thermal simulation modelling was undertaken utilising the thermally equivalent slab (TES) concept to model the passive thermal capacity effect of profiled, composite metal floor decks. It is apparent from the modelling results that thermal mass is a highly complex phenomenon which is highly dependent upon building type, occupancy patterns, climate and many other aspects of the building design and servicing strategy. The ATM systems developed, both conceptually and for prototype testing, focussed on water-cooled composite slabs, the Cofradal floor system and the phase change material (PCM) Energain. In addition to laboratory testing of prototypes, whole building monitoring was undertaken at the Kubik building in Spain and the RWTH test building in Germany. Advanced thermal modelling was also undertaken to estimate the likely benefits of the ATM concept designs developed and for comparison with the test results. In addition to thermal testing, structural tests were conducted on composite floor specimens incorporating embedded water pipes. This Final Report presents the results of the activities carried out under this RFCS contract RFSR CT 2012 00033. The work carried out is reported in six major sections corresponding to the technical Work Packages of the project. Only summaries of the work carried out are provided in this report; all work undertaken is fully reported in the formal project deliverables.
Das Forschungsvorhaben Optiox beschäftigt sich mit der Optimierung eines Belüftungsbeckens zur Rauchgasentschwefelung fossil befeuerter Kraftwerke mittels Seewasser. Unter Neutralisierung der entstehenden Hydroniumionen (H3O+) durch die natürliche Alkalität des Seewassers dissoziiert Schwefeldioxid aus dem Rauchgase im vorgeschalteten Absorber beim Phasenübergang von der Gas- in die Flüssigphase zu Sulfiten. Im Belüftungsbecken werden diese Sulfite mittels eingeblasener Luft zu Sulfaten oxidiert, was zu einer geringen Erhöhung der Sulfatfracht vor Einleitung ins Meer führt, die unterhalb der natürlichen Schwankungen liegt. Daneben dient das Belüftungsbecken der Konditionierung des Seewassers hinsichtlich pH-Wert und Sauerstoffgehalt und ist mit hoch effizienten Belüftern ausgestattet, deren Spezifikation den jeweiligen Randbedingungen, wie Abscheideleistung des Absorbers, Beckengeometrie sowie lokalen Gegebenheiten angepasst wird.
Optical flow estimation is known from Computer Vision where it is used to determine obstacle movements through a sequence of images following an assumption of brightness conservation. This paper presents the first study on application of the optical flow method to aerated stepped spillway flows. For this purpose, the flow is captured with a high-speed camera and illuminated with a synchronized LED light source. The flow velocities, obtained using a basic Horn–Schunck method for estimation of the optical flow coupled with an image pyramid multi-resolution approach for image filtering, compare well with data from intrusive conductivity probe measurements. Application of the Horn–Schunck method yields densely populated flow field data sets with velocity information for every pixel. It is found that the image pyramid approach has the most significant effect on the accuracy compared to other image processing techniques. However, the final results show some dependency on the pixel intensity distribution, with better accuracy found for grey values between 100 and 150.
Turbulent dispersion in bounded horizontal jets : RANS capabilities and physical modeling comparison
(2016)
In diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen.
Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau.
Baumaschinen
(2016)
Größen, Formeln, Bemessung
(2016)
Das Kapitel 1 vermittelt eine Übersicht für den schnellen Gebrauch von Größen, Einheiten und Zeichen. Es folgt die Darstellung wichtiger Grundlagen der Mathematik, Lastannahmen und einfacher statischer Systeme. Schließlich werden Hinweise zu charakteristischen Festigkeiten und Tragfähigkeitsnachweisen für Berechnungen im Mauerwerk, Holz- und Stahlbau sowie Stahlbetonbau gegeben. Für eine weitere Vertiefung des Themas empfiehlt sich der Wendehorst Bautechnische Zahlentafel
Air-water flows can be found in different engineering applications: from nuclear engineering to huge hydraulic structures. In this paper, a single tip fibre optical probe has been used to record high frequency (over 1 MHz) phase functions at different locations of a stepped spillway. These phase functions have been related to the interfacial velocities by means of Artificial Neural Networks (ANN) and the measurements of a classical double tip conductivity probe. Special attention has been put to the input selection and the ANN dimensions. Finally, ANN have shown to be able to link the signal rising times and plateau shapes to the air-water interfacial velocity.
Sensitivity of turbulent Schmidt number and turbulence model to simulations of jets in crossflow
(2016)
Environmental discharges have been traditionally designed by means of cost-intensive and time-consuming experimental studies. Some extensively validated models based on an integral approach have been often employed for water quality problems, as recommended by USEPA (i.e.: CORMIX). In this study, FLOW-3D is employed for a full 3D RANS modelling of two turbulent jet-to-crossflow cases, including free surface jet impingement. Results are compared to both physical modelling and CORMIX to better assess model performance. Turbulence measurements have been collected for a better understanding of turbulent diffusion's parameter sensitivity. Although both studied models are generally able to reproduce jet trajectory, jet separation downstream of the impingement has been reproduced only by RANS modelling. Additionally, concentrations are better reproduced by FLOW-3D when the proper turbulent Schmidt number is used. This study provides a recommendation on the selection of the turbulence model and the turbulent Schmidt number for future outfall structures design studies.
Betriebsorganisation
(2016)
Das Kapitel behandelt, ausgehend von Begriffen und Aufgaben der Betriebsorganisation, die Aufbau- und Ablauforganisation der Bauunternehmung sowie die Gestaltung einer Projekt-organisation. Es folgt eine Darstellung der Managementsysteme für Qualität, Umwelt und Arbeitsschutz, die sich zunehmend als sog. integrierte Managementsysteme (IMS) auch in Bauunternehmen etablieren. Grundlagen des Personalmanagements und des betrieblichen Rechnungswesens, die für eine(n) Baubetriebler(in) relevant sein können, ergänzen das Kap. Betriebsorganisation. Den Abschluss bilden Hinweise zum Berichtswesen der Baustelle.
Kalkulation
(2016)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Accurate determination of free-surface dynamics has attracted much research attention during the past decade and has important applications in many environmental and water related areas. In this study, the free-surface dynamics in several turbulent flows commonly found in nature were investigated using a synchronised setup consisting of an ultrasonic sensor and a high-speed video camera. Basic sensor capabilities were examined in dry conditions to allow for a better characterisation of the present sensor model. The ultrasonic sensor was found to adequately reproduce free-surface dynamics up to the second order, especially in two-dimensional scenarios with the most energetic modes in the low frequency range. The sensor frequency response was satisfactory in the sub-20 Hz band, and its signal quality may be further improved by low-pass filtering prior to digitisation. The application of the USS to characterise entrapped air in high-velocity flows is also discussed.
A new formulation for the prediction of free surface dynamics related to the turbulence occurring nearby is proposed. This formulation, altogether with a breakup criterion, can be used to compute the inception of self-aeration in high velocity flows like those occurring in hydraulic structures. Assuming a simple perturbation geometry, a kinematic and a non-linear momentum-based dynamic equation are formulated and forces acting on a control volume are approximated. Limiting steepness is proposed as an adequate breakup criterion. Role of the velocity fluctuations normal to the free surface is shown to be the main turbulence quantity related to self-aeration and the role of the scales contained in the turbulence spectrum are depicted. Surface tension force is integrated accounting for large displacements by using differential geometry for the curvature estimation. Gravity and pressure effects are also contemplated in the proposed formulation. The obtained equations can be numerically integrated for each wavelength, hence resulting in different growth rates and allowing computation of the free surface roughness wavelength distribution. Application to a prototype scale spillway (at the Aviemore dam) revealed that most unstable wavelength was close to the Taylor lengthscale. Amplitude distributions have been also obtained observing different scaling for perturbations stabilized by gravity or surface tension. The proposed theoretical framework represents a new conceptualization of self-aeration which explains the characteristic rough surface at the non-aerated region as well as other previous experimental observations which remained unresolved for several decades.
As with most high-velocity free-surface flows, stepped spillway flows become self-aerated when the drop height exceeds a critical value. Due to the step-induced macro-roughness, the flow field becomes more turbulent than on a similar smooth-invert chute. For this reason, cascades are oftentimes used as re-aeration structures in wastewater treatment. However, for stepped spillways as flood release structures downstream of deoxygenated reservoirs, gas transfer is also of crucial significance to meet ecological requirements. Prediction of mass transfer velocities becomes challenging, as the flow regime differs from typical previously studied flow conditions. In this paper, detailed air-water flow measurements are conducted on stepped spillway models with different geometry, with the aim to estimate the specific air-water interface. Re-aeration performances are determined by applying the absorption method. In contrast to earlier studies, the aerated water body is considered a continuous mixture up to a level where 75% air concentration is reached. Above this level, a homogenous surface wave field is considered, which is found to significantly affect the total air-water interface available for mass transfer. Geometrical characteristics of these surface waves are obtained from high-speed camera investigations. The results show that both the mean air concentration and the mean flow velocity have influence on the mass transfer. Finally, an empirical relationship for the mass transfer on stepped spillway models is proposed.
Untersuchungen zur Tragfähigkeit und Steifigkeit eines neuartigen Wandelements in Holzbauweisen
(2018)
New information regarding the influence of a stepped chute on the hydraulic performance of the United States Bureau of Reclamation (Reclamation) Type III hydraulic jump stilling basin is presented for design (steady) and adverse (decreasing tailwater) conditions. Using published experimental data and computational fluid dynamics (CFD) models, this paper presents a detailed comparison between smooth-chute and stepped-chute configurations for chute slopes of 0.8H:1V and 4H:1V and Froude numbers (F) ranging from 3.1 to 9.5 for a Type III basin designed for F = 8. For both stepped and smooth chutes, the relative role of each basin element was quantified, up to the most hydraulic extreme case of jump sweep-out. It was found that, relative to a smooth chute, the turbulence generated by a stepped chute causes a higher maximum velocity decay within the stilling basin, which represents an enhancement of the Type III basin’s performance but also a change in the relative role of the basin elements. Results provide insight into the ability of the CFD models [unsteady Reynolds-averaged Navier-Stokes (RANS) equations with renormalization group (RNG) k-ϵ turbulence model and volume-of-fluid (VOF) for free surface tracking] to predict the transient basin flow structure and velocity profiles. Type III basins can perform adequately with a stepped chute despite the effects steps have on the relative role of each basin element. It is concluded that the classic Type III basin design, based upon methodology by reclamation specific to smooth chutes, can be hydraulically improved for the case of stepped chutes for design and adverse flow conditions using the information presented herein.
Vectrino profiler spatial filtering for shear flows based on the mean velocity gradient equation
(2018)
A new methodology is proposed to spatially filter acoustic Doppler velocimetry data from a Vectrino profiler based on the differential mean velocity equation. Lower and upper bounds are formulated in terms of physically based flow constraints. Practical implementation is discussed, and its application is tested against data gathered from an open-channel flow over a stepped macroroughness surface. The method has proven to detect outliers occurring all over the distance range sampled by the Vectrino profiler and has shown to remain applicable out of the region of validity of the velocity gradient equation. Finally, a statistical analysis suggests that physically obtained bounds are asymptotically representative.
Schalung und Gerüste
(2019)
Die grundsätzliche Planung von Schalungsaufgaben wird heute in der Regel im Rahmen der Arbeitsvorbereitung von den entsprechenden Stabsabteilungen oder als Serviceleistung von den Schalungsherstellern mit Anwendung von spezieller Software und den technischen Unterlagen für die jeweiligen Schalungsgeräte durchgeführt. Diese Programme und technischen Unterlagen stehen in der Regel auch den Mitarbeitern in der Bauleitung zur Verfügung, werden dort aber eher seltener genutzt. Zur Anwendung auf der Baustelle stellen die Schalungshersteller neben den technischen Unterlagen Bemessungstabellen zur Verfügung, welche die Auswahl und Dimensionierung einzelner Schalungen wesentlich erleichtern.
Die nachfolgend aufgeführten Beispiele aus dem Bereich Schalung und Gerüste beschreiben Aufgaben, die im Baustellenbetrieb auf die Bauleitung zu kommen können und auch ohne Unterstützung einer Stabsabteilung gelöst werden können.
Vermessung
(2019)
Der baurechtliche Vertrag
(2019)
Anhand von kurzen theoretischen Einführungen werden anhand von Beispielen die wesentlichen Aspekte des baurechtlichen Vertrages erläutert. Nach einer Einführung über das Zustandekommen von (Bau-) Verträgen wird die für Streitfälle unerlässliche Dokumentation auf Baustellen erläutert. Hierbei werden Hinweise zur Erstellung von Protokollen, zum E-Mail bei Großprojekten und zur Dokumentation von Stundenlohnarbeiten gegeben. Des Weiteren wird eine Schriftverkehrsliste vorgestellt, die zur Nachverfolgung des Schriftverkehrs bei Großprojekten unerlässlich ist.
Anschließend werden die typischen Vertragsarten vorgestellt, die bei der Abwicklung von Großprojekten zu beachten sind und die Unterschiede werden durch Fallbeispiele erläutert.
Einen Schwerpunkt des Kapitels bilden auftragsnehmerseitige Verzüge sowie mangelbehaftete Leistungen. Hier werden Hinweise gegeben, wie in den entsprechenden Situationen zu reagieren ist.
Baukosten und Finanzierung
(2019)
Boden, Baugrube, Verbau
(2019)
Im folgenden Kapitel werden die wichtigsten geotechnischen Nachweise sowie praxisnahe Beispiele für den Baubetrieb aufgeführt. Es wird im Wesentlichen auf die Bodenbeschreibung und Klassifikation nach DIN 18196 sowie nach DIN 18300 eingegangen, welche sowohl für die weiteren Berechnungen als auch für die Kalkulation von großer Bedeutung sind.
Die aus der Praxis aufgeführten Beispiele verdeutlichen verschiedene Untersuchungs- und Auswertungsmethoden für direkte und indirekte Aufschlüsse, diese enthalten Labor- und Feldversuche, mit denen man die Verdichtbarkeit von Böden auswertet und quantifiziert, sowie viele andere Themenbereiche wie Erddruckberechnungen sowie Spannungs- und Setzungsberechnungen.
Darüber hinaus werden exemplarisch bestimmte Verbauarten bezüglich ihrer Bemessung erläutert. Es wird ebenfalls auf das Thema Wasserhaltung eingegangen und die erforderlichen Maßnahmen beschrieben, um bestimmte Versagensmechanismen - wie z.B. den hydraulischen Grundbruch - zu verhindern.
Arbeitssicherheit
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Betriebsorganisation
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Kalkulation
(2019)
Baumaschinen
(2019)
Though weir flow has been studied for centuries, there still remains some nuances of weir flow that are not well understood. Therefore, an international study was conducted in which 20 different hydraulics laboratories from around the world built and tested two linear weirs (quarter-round and half-round crested weirs) of common geometry. The only unconstrained dimension was the weir length, which could be adjusted to match the width of the test flume. Participating laboratories used the instrumentation and data collection methodologies of their choosing for head and discharge measurements.
The experimental results found significant variability in the discharge coefficients as a function of dimensionless upstream head, as well as in the head-discharge relationships (as much as 50% in some cases). Potential sources contributing to the scatter may have included head meter instrumentation, flow meter instrumentation, approach flow length (flume length upstream of weir), head measurement location, nappe behavior, laboratory measurement methods and experimental setup, and the care and skill of the investigator (human error). Analyzing the data as a function of instrumentation types, approach length, and head measurement location did not provide any insight regarding the variations. Nappe behavior (e.g., aeration), which could be influenced by laboratory-specific conditions, varied among the datasets primarily for the half-round crested weir (about 20%).