Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (712) (remove)
Document Type
- Article (334)
- Conference Proceeding (139)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
- Conference Poster (1)
- Habilitation (1)
Keywords
- Kanalisation (4)
- Wasserbau (4)
- Wasserwirtschaft (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
In der wasserbaulichen Forschung werden neben klassischen Messinstrumenten zunehmend kamerabasierte Verfahren genutzt. Diese erlauben neben der Bestimmung von Fließgeschwindigkeiten auch die Detektion der freien Wasseroberfläche oder zeitliche Vermessung von Kolken. Durch die hohen räumlichen und zeitlichen Auflösungen, welche neueste Kamerasensoren liefern, können neue Erkenntnisse in turbulenten, komplexen Strömungen gewonnen werden. Auch in der Praxis können diese Verfahren mit geringem Aufwand wichtige Daten liefern.
Durch die Einführung von Building Information Modeling (BIM) sowohl projektspezifisch als auch in ganze Unternehmungen hat die Baubranche einen weitreichenden Veränderungsprozess angestoßen.
Building Information Modeling kann als eine Methode angesehen werden, um die Informationsasymmetrien zwischen den Projektbeteiligten so gering wie möglich zu halten.
Bauwirtschaft
(2024)
Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen.
n diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen.
Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau.
Baustoffe
(2024)
Durch das öffentliche Baurecht werden die Zulässigkeit, die Grenzen, die Ordnung und die Förderung der baulichen Nutzung des Bodens geregelt.
Die Ausschreibung und die Vergabe sind von essenzieller Bedeutung für ein Bauvorhaben und werden deshalb in der HOAI mit zwei Leistungsphasen abgebildet: nämlich mit der Leistungsphase 6 Vorbereitung der Vergabe sowie der Leistungsphase 7 Mitwirkung bei der Vergabe. Im Zuge der Ausschreibung und der Vergabe werden die für den AG anfallenden Kosten festgelegt und bilden somit die letzte größere Stellschraube für Preiseinsparungen.
Boden, Baugrube, Verbau
(2024)
Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt.
Kalkulation
(2024)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Baumaschinen
(2024)
Schalung und Gerüste
(2024)
Systemschalungen und Systemgerüste haben den Baustellenbetrieb in vielen Bereichen sehr vereinfacht. Dennoch sind Kenntnisse in diesen Feldern für eine erfolgreiche und effektive Bauleitung unverzichtbar. In diesem Kapitel werden Hinweise und Empfehlungen für die Bemessung und Einsatz von Schalungen, Trag- und Arbeitsgerüsten für den Baustellenbetrieb gegeben.
Kein Bauvorhaben sollte realisiert werden, ohne dass es auf einer vertraglichen Grundlage zwischen Auftraggeber und Auftragnehmer fußt. Diese vertragliche Grundlage zu kennen ist essenziell, um dementsprechend handeln zu können. Denn nur wer seine eigenen Rechte und auch Pflichten kennt, kann sich auf diese berufen.
Die Arbeitsvorbereitung, als ein wesentliches Aufgabengebiet des Baubetriebswesens, ist von enormer Bedeutung für den Erfolg eines Bauprojektes. Die Arbeitsvorbereitung lässt sich zeitlich sowohl in der Angebotsphase (kalkulationsbegleitende Arbeitsvorbereitung), in der Vorbereitungsphase der Baustelle (von Auftragsvergabe bis Baubeginn) als auch baubegleitend einordnen.
Air–water flows
(2024)
High Froude-number open-channel flows can entrain significant volumes of air, a phenomenon that occurs continuously in spillways, in free-falling jets and in hydraulic jumps, or as localized events, notably at the toe of hydraulic jumps or in plunging jets. Within these flows, turbulence generates millions of bubbles and droplets as well as highly distorted wavy air–water interfaces. This phenomenon is crucial from a design perspective, as it influences the behaviour of high-velocity flows, potentially impairing the safety of dam operations. This review examines recent scientific and engineering progress, highlighting foundational studies and emerging developments. Notable advances have been achieved in the past decades through improved sampling of flows and the development of physics-based models. Current challenges are also identified for instrumentation, numerical modelling and (up)scaling that hinder the formulation of fundamental theories, which are instrumental for improving predictive models, able to offer robust support for the design of large hydraulic structures at prototype scale.
This thesis aims at the presentation and discussion of well-accepted and new
imaging techniques applied to different types of flow in common hydraulic
engineering environments. All studies are conducted in laboratory conditions and
focus on flow depth and velocity measurements. Investigated flows cover a wide
range of complexity, e.g. propagation of waves, dam-break flows, slightly and fully
aerated spillway flows as well as highly turbulent hydraulic jumps.
Newimagingmethods are compared to different types of sensorswhich are frequently
employed in contemporary laboratory studies. This classical instrumentation as well
as the general concept of hydraulic modeling is introduced to give an overview on
experimental methods.
Flow depths are commonly measured by means of ultrasonic sensors, also known as
acoustic displacement sensors. These sensors may provide accurate data with high
sample rates in case of simple flow conditions, e.g. low-turbulent clear water flows.
However, with increasing turbulence, higher uncertainty must be considered.
Moreover, ultrasonic sensors can provide point data only, while the relatively large
acoustic beam footprint may lead to another source of uncertainty in case of
relatively short, highly turbulent surface fluctuations (ripples) or free-surface
air-water flows. Analysis of turbulent length and time scales of surface fluctuations
from point measurements is also difficult. Imaging techniques with different
dimensionality, however, may close this gap. It is shown in this thesis that edge
detection methods (known from computer vision) may be used for two-dimensional
free-surface extraction (i.e. from images taken through transparant sidewalls in
laboratory flumes). Another opportunity in hydraulic laboratory studies comes with
the application of stereo vision. Low-cost RGB-D sensors can be used to gather
instantaneous, three-dimensional free-surface elevations, even in flows with very
high complexity (e.g. aerated hydraulic jumps). It will be shown that the uncertainty
of these methods is of similar order as for classical instruments.
Particle Image Velocimetry (PIV) is a well-accepted and widespread imaging
technique for velocity determination in laboratory conditions. In combination with
high-speed cameras, PIV can give time-resolved velocity fields in 2D/3D or even as
volumetric flow fields. PIV is based on a cross-correlation technique applied to small
subimages of seeded flows. The minimum size of these subimages defines the
maximum spatial resolution of resulting velocity fields. A derivative of PIV for
aerated flows is also available, i.e. the so-called Bubble Image Velocimetry (BIV). This
thesis emphasizes the capacities and limitations of both methods, using relatively
simple setups with halogen and LED illuminations. It will be demonstrated that
PIV/BIV images may also be processed by means of Optical Flow (OF) techniques.
OF is another method originating from the computer vision discipline, based on the
assumption of image brightness conservation within a sequence of images. The
Horn-Schunck approach, which has been first employed to hydraulic engineering
problems in the studies presented herein, yields dense velocity fields, i.e. pixelwise
velocity data. As discussed hereinafter, the accuracy of OF competes well with PIV
for clear-water flows and even improves results (compared to BIV) for aerated flow
conditions. In order to independently benchmark the OF approach, synthetic images
with defined turbulence intensitiy are used.
Computer vision offers new opportunities that may help to improve the
understanding of fluid mechanics and fluid-structure interactions in laboratory
investigations. In prototype environments, it can be employed for obstacle detection
(e.g. identification of potential fish migration corridors) and recognition (e.g. fish
species for monitoring in a fishway) or surface reconstruction (e.g. inspection of
hydraulic structures). It can thus be expected that applications to hydraulic
engineering problems will develop rapidly in near future. Current methods have not
been developed for fluids in motion. Systematic future developments are needed to
improve the results in such difficult conditions.
Deammonification for nitrogen removal in municipal wastewater in temperate and cold climate zones is currently limited to the side stream of municipal wastewater treatment plants (MWWTP). This study developed a conceptual model of a mainstream deammonification plant, designed for 30,000 P.E., considering possible solutions corresponding to the challenging mainstream conditions in Germany. In addition, the energy-saving potential, nitrogen elimination performance and construction-related costs of mainstream deammonification were compared to a conventional plant model, having a single-stage activated sludge process with upstream denitrification. The results revealed that an additional treatment step by combining chemical precipitation and ultra-fine screening is advantageous prior the mainstream deammonification. Hereby chemical oxygen demand (COD) can be reduced by 80% so that the COD:N ratio can be reduced from 12 to 2.5. Laboratory experiments testing mainstream conditions of temperature (8–20°C), pH (6–9) and COD:N ratio (1–6) showed an achievable volumetric nitrogen removal rate (VNRR) of at least 50 gN/(m3∙d) for various deammonifying sludges from side stream deammonification systems in the state of North Rhine-Westphalia, Germany, where m3 denotes reactor volume. Assuming a retained Norganic content of 0.0035 kgNorg./(P.E.∙d) from the daily loads of N at carbon removal stage and a VNRR of 50 gN/(m3∙d) under mainstream conditions, a resident-specific reactor volume of 0.115 m3/(P.E.) is required for mainstream deammonification. This is in the same order of magnitude as the conventional activated sludge process, i.e., 0.173 m3/(P.E.) for an MWWTP of size class of 4. The conventional plant model yielded a total specific electricity demand of 35 kWh/(P.E.∙a) for the operation of the whole MWWTP and an energy recovery potential of 15.8 kWh/(P.E.∙a) through anaerobic digestion. In contrast, the developed mainstream deammonification model plant would require only a 21.5 kWh/(P.E.∙a) energy demand and result in 24 kWh/(P.E.∙a) energy recovery potential, enabling the mainstream deammonification model plant to be self-sufficient. The retrofitting costs for the implementation of mainstream deammonification in existing conventional MWWTPs are nearly negligible as the existing units like activated sludge reactors, aerators and monitoring technology are reusable. However, the mainstream deammonification must meet the performance requirement of VNRR of about 50 gN/(m3∙d) in this case.
The present work aimed to study the mainstream feasibility of the deammonifying sludge of side stream of municipal wastewater treatment plant (MWWTP) in Kaster, Germany. For this purpose, the deammonifying sludge available at the side stream was investigated for nitrogen (N) removal with respect to the operational factors temperature (15–30°C), pH value (6.0–8.0) and chemical oxygen demand (COD)/N ratio (≤1.5–6.0). The highest and lowest N-removal rates of 0.13 and 0.045 kg/(m³ d) are achieved at 30 and 15°C, respectively. Different conditions of pH and COD/N ratios in the SBRs of Partial nitritation/anammox (PN/A) significantly influenced both the metabolic processes and associated N-removal rates. The scientific insights gained from the current work signifies the possibility of mainstream PN/A at WWTPs. The current study forms a solid basis of operational window for the upcoming semi-technical trails to be conducted prior to the full-scale mainstream PN/A at WWTP Kaster and WWTPs globally.
Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht.