Refine
Year of publication
Institute
- Fachbereich Energietechnik (33) (remove)
Has Fulltext
- yes (33) (remove)
Document Type
- Conference Proceeding (33) (remove)
Keywords
- Blitzschutz (15)
- Lightning protection (9)
- reinforced concrete (4)
- Elektromagnetischer Schutzschild (3)
- Lightning (3)
- Risikomanagement (3)
- Stahlbetonkonstruktion (3)
- Direkter Blitzschlag (2)
- Erneuerbare Energien (2)
- Gasturbine (2)
Is part of the Bibliography
- no (33)
Evaluation of fragility curves for a three-storey-reinforced-concrete mock-up of SMART 2013 project
(2016)
In the presented paper data collected from the field related to damage statistics of electrical and electronic apparatus in household are reported and investigated. These damages (total number approx. 74000 cases), registered by five German insurance companies in 2005 and 2006, were adviced by customers as caused by lightning overvoltages. With the use of stochastical methods it is possible, to reasses the collected data and to distinguish between cases, which are with high probability caused by lightning overvoltages, and those, which are not. If there was an indication for a direct strike, this case was excluded, so the focus was only on indirect lightning flashes, i.e. only flashes to ground near the structure and flashes to or nearby an incoming service line were investigated. The data from the field contain the location of damaged apparatus (residence of the policy holder) and the distances of the nearest cloud-to-ground stroke to the location of the damage registered by the German lightning location network BLIDS at the date of damage. The statistical data along with some complementary numerical simulations allow to verify the correspondence of the Standards rules used for IEC 62305-2 with the field data and to define some correction needs. The results could lead to a better understanding whether a damage reported to an insurance company is really caused by indirect lightning, or not.
[Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate.
8. VDE/ABB-Blitzschutztagung, 29. - 30. Oktober 2009 in Neu-Ulm. Blitzschutztagung <8, 2009, Neu-Ulm> Berlin : VDE Verl. 2009 Großkraftwerke können durch Blitzentladungen mit potentiellen Auswirkungen auf deren Verfügbarkeit und Sicherheit gefährdet werden. Ein sehr spezielles Szenario, welches aus aktuellem Anlass zu untersuchen war, betrifft den kraftwerksnahen Blitzeinschlag in die Hochspannungs-Freileitung am Netzanschluss der Anlage. Wird nun noch ein sogenannter Schirmfehler unterstellt, d.h. der direkte Blitzeinschlag erfolgt in ein Leiterseil des Hoch- bzw. Höchstspannungsnetzes und nicht in das darüber gespannte Erdseil, so bedeutet dies eine extreme elektromagnetische Einwirkung. Der vorliegende Beitrag befasst sich mit der Simulation eines solchen Blitzeinschlages und dessen Auswirkungen auf den Netzanschluss und die Komponenten der elektrischen Eigenbedarfsanlagen eines Kraftwerks auf den unterlagerten Spannungsebenen. Die dabei gewonnenen Erkenntnisse lassen sich ohne Einschränkungen auf Industrieanlagen mit Mittelspannungs-Netzanschluss und ohne eigener Stromversorgung übertragen.
Geräuschminderung und Leichtbau in Leistungsgetrieben durch den Einsatz von Werkstoffverbunden
(2007)
One of the most important parameters in a burning chamber - in power stations, in waste to energy plants - is the temperature. This temperature is in the range of 700-1500 °C - one of the most advanced measuring methods being the acoustic pyrometry with the possibility of producing temperature mapping in one level of the burning chamber - comparable to computer tomography. The results of these measurements discussed in the presentation can be used - to fulfil the legal requirements in the FRG or in the EU - to equalise the temperature in one level of the burning chamber to optimise the steam production (better efficiency of the plant) and to minimise the production of temperature controlled flue gas components (NO, CO a. o.) - to control the SNCR-process if used.
The Ministry of Science and Research in North Rhine-Westphalia created eight platforms of excellence, one in the research area „Energy and Environment“ in 2002 at ACUAS. This platform concentrates the research and development of 13 professors in Jülich and Aachen and of two scientific institutes with different topics: – NOWUM-Energy with emphasis on efficient and economic energy conversion – The Solar Institute Jülich – SIJ – being the largest research institute in the field of renewables at a University of Applied Sciences in Germany With this platform each possible energy conversion – nuclear, fossil, renewable- can be dealt with to help solving the two most important problems of mankind, energy and potable water. At the CSE are presented the historical development, some research results and the combined master studies in „Energy Systems“ and „Nuclear Applications“
IEC Technical Committee 81 is currently creating the new IEC 62305 series of standards on Lightning Protection. Working Group 9 is responsible for Part 2 of this series, which deals with the assessment and management of risk its CDV (Committee Draft for Voting) stage and has been circulated to National Committees for comment. The paper details the development of the Simplified IEC Risk Assessment Calculator software tool as described in Informative Annex J of IEC62305-2 Ed.1/CDV 2. This tool is intended as a simplified implementation of the more rigorous treatment of risk management found in the written document. It is designed to be relatively intuitive for users who wish to obtain an initial assessment of risk sensitivity, but should not be considered a substitute to a full understanding of the methods provided in the standard when dealing with more complicated structures or those where greater risks to personal or system operation are involved.
In the paper the results obtained from experiments at a modelled reinforced building in case of a direct lightning strike are compared with calculations. The comparison includes peak values of the magnetic field Hmax, its derivative (dH/dt)max and of induced voltages umax in typical cable routings. The experiments are performed at a 1:6 scaled building and the results are extrapolated using the similarity relations theory. The calculations are based on the approximate formulae given in IEC 62305-4 and have to be supplemented by a rough estimation of the additional shielding effect of a second reinforcement layer. The comparison shows, that the measured peak values of the magnetic field and its derivative are mostly lower than the calculated. The induced voltages are in good agreement. Hence, calculations of the induced voltages based on IEC 62305-4 are a good method for lightning protection studies of buildings, where the reinforcement is used as a grid-like electromagnetic shield.
For the application of the concept of Lightning Protection Zones (LPZ), the knowledge of the magnetic fields and induced voltages inside a structure is necessary. Laboratory experiments have been conducted at a downscaled model of a building (scale factor 1:6) to determine these electromagnetic quantities in case of a direct strike to the structure. The model (3 m x 2 m x 2 m) represented a small industrial building using the reinforcement of the concrete as electromagnetic shield. The magnetic fields and magnetic field derivatives were measured at several location inside the scaled model. Further, the voltages induced on three typical cable routes inside the model was determined. The influence of the lightning current waveshape, point-of-strike, bonding of the cable routes, and bridging of an expansion joint in the middle of the building on these quantities was studied.
Funktionsprinzip Emissionsrechtehandel, Betroffene Anlagen und Branchen, Erstverteilung der Emissionsrechte, Bereits erbrachte Emissionsreduktionen (early actions), Ausstieg von betroffenen Unternehmen (opt-out), Teilnahme von nicht betroffenen Unternehmen, Einsatz von Biobrennstoffen, Erfassung und Dokumentation der Emissionen
Ausgangslage, Funktionsprinzip des virtuellen Kraftwerkes, Energiemanagementsysteme (EMS), Einsatzgebiete, Anlagesysteme eines VKW's, Einsatzbereich der verschiedenen dezentralen Energieanlagen, Vorteile des virtuellen Kraftwerkes, Auswirkungen auf das elektrische Netz, Wirtschaftliche Aspekte, Beispielprojekte
Ein von der Arbeitsgemeinschaft (AG) Solar NRW und diversen Industriepartnern gefördertes und an der Fachhochschule Aachen, Abt. Jülich durchgeführtes Forschungsprojekt „Blitzschutz für netz-autarke Hybridanlagen“ machte es möglich, sich mit dem Blitzschutz speziell solcher Anlagen näher zu beschäftigen. Vermehrt bekannt gewordene Schadensfälle an nicht netz-gekoppelten Hybridanlagen waren der Auslöser, den Schutz zu überdenken. Definiertes Ziel war es, für netz-autarke energietechnische Anlagen ein Konzept zum Schutz vor Blitzeinwirkungen zu erstellen. Diese Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaikanlagen, ggf. auch Solarthermieanlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet). Zur Erhöhung der Versorgungssicherheit kann noch ein Dieselaggregat dazukommen. Hybridanlagen werden vor allem in Gebieten mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in relativ dünn bewohnten Gebieten und in Entwicklungsländern. Dem Blitzschutz von Hybridanlagen kommt dabei eine steigende Bedeutung zu. Besonderes Augenmerk in dem genannten Forschungsprojekt sollte dabei auf die technisch/wirtschaftliche Ausgewogenheit des Schutzes gelegt werden: • die Schutzmaßnahmen sollen nur in solchen Fällen eingesetzt werden, wo dies als Ergebnis von Risikoanalysen sinnvoll erscheint; • für typische netz-autarke Hybridanlagen sollen die Schutzmaßnahmen ohne deutliche Verteuerung realisierbar sein (es soll also kein absoluter Schutz realisiert werden; ggf. soll lediglich der auftretende Schaden soweit möglich minimiert werden). Dazu wurde in einem ersten Schritt zunächst eine Aufnahme des Iststandes einiger typischer netz-autarker Hybridanlagen und deren einzelnen Komponenten durchgeführt. Aufgrund dessen wurde eine umfassende Risikoanalyse zur Blitzbedrohung dieser Anlagen auf der Basis von VDE V 0185 Teil 2:2002-11 [1] erstellt. Die Ergebnisse mündeten in ein technisch/wirtschaftlich ausgewogenes Konzept für den Anlagen- Blitzschutz (d.h. insbesondere dem Schutz vor direkten Blitzeinschlägen und deren unmittelbaren Auswirkungen) nach VDE V 0185 Teil 3:2002-11 [2] und für den Elektronik-Blitzschutz (d.h. für den Schutz vor Überspannungen durch direkte, insbesondere aber auch indirekte Blitzeinschläge) nach VDE V 0185 Teil 4:2002-11 [3]. Aufgrund der gesammelten Ergebnisse konnten dabei allgemeine Empfehlungen für den Äußeren und Inneren Blitzschutz von regenerativen Energieerzeugungssystemen erstellt werden. Diese sollen in Schulungen einmünden, die für Hersteller und Betreiber von Hybridanlagen angeboten werden. Durch die Anwendung wird der Schutz der Anlagen vor Blitzeinwirkung und elektromagnetischen Störungen verbessert, was sich in einer reduzierten Ausfallwahrscheinlichkeit bzw. erhöhten Verfügbarkeit wiederspiegelt. An einigen ausgewählten Anlagen werden mit Hilfe der im Projekt involvierten Industriepartner die Schutzmaßnahmen realisiert. Hierbei entstanden den Eigentümern bzw. Betreibern der Anlagen keine Kosten. In diesem Beitrag werden beispielhaft drei Anlagenprojekte detailliert gezeigt. Es handelt sich dabei um eine Schweinezuchtfarm in Magallón (Spanien, Zaragozza), das bioklimatische Haus (Kreta, Heraklion) und die Tegernseer- Hütte (Deutschland, Lenggries).
Die neue Vornorm VDE V 0185 Teil 2 „Risikomanagement: Abschätzung des Schadensrisikos für bauliche Anlagen“ [1] ist seit November 2002 gültig. Sie ermöglicht nicht nur die Ermittlung der Schutzklasse eines Blitzschutzsystems, sondern auch die Untersuchung zur Notwendigkeit anderer Schutzmaßnahmen gegen Blitzeinwirkungen (Überspannungsschutzgeräte in Unterverteilern und/oder an Endgeräten, Schirmung des Gebäudes und/oder interner Räume, Potentialsteuerung, Brandmelde- und Feuerlöscheinrichtungen, etc.) nach objektiven Kriterien und damit in einer für alle Beteiligten grundsätzlich nachvollziehbaren Art und Weise. Dass eine solche Analyse rel. komplex sein muss und der intensiven Beschäftigung bedarf, ist deshalb nicht verwunderlich. Die Komplexität des Verfahrens sollte allerdings nicht dazu führen, die Vornorm als Ganzes abzulehnen. Die Vornorm beruht auf dem Stand der Diskussion im internationalen Normengremium IEC TC81 WG9 Ende des Jahres 2000. Integriert wurden einige nationale Besonderheiten, die aus Sicht des zuständigen Normenkomitees DKE K251 erforderlich erschienen. In Deutschland konnten und können nun erste breite Erfahrungen in der Anwendung dieser Risikoanalyse gesammelt werden; in anderen Ländern ist dies noch nicht möglich. Diese Erfahrungen können dann, nach Diskussion im nationalen Rahmen, in die internationale Normenarbeit eingebracht werden. Im folgenden Beitrag sollen einige, seit Erscheinen der Vornorm oft wiederkehrende Fragen dargestellt und Lösungsvorschläge vorgestellt werden. Dabei wird auch auf die Tendenzen im internationalen Normengremium IEC TC81 WG9 eingegangen, d.h. auf den aktuellen Entwurf zur IEC 62305-2 [3]. Die Lösungsvorschläge werden begründet, sind allerdings weitestgehend subjektive Meinung des Autors. Für übliche bauliche Anlagen ist die Anwendung der Vornorm rel. einfach möglich. Auch für spezielle Fälle können die darin festgelegten Verfahren herangezogen werden; allerdings sind dann einige weiterführende Überlegungen notwendig, die der Planer von Blitzschutzsystemen durchführen muss. Anhand zweier Beispiele soll die Anwendung der VDE V 0185 Teil 2 auf solche speziellen Fälle dargestellt werden.
Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen Wänden sind bereits in sehr großer Zahl errichtet. Dazu gehören kleinere bis größere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilität, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abhängig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen müssen. Der Blitzschutz für diese baulichen Anlagen sollte sich also nicht nur im „klassischen“ Gebäude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] erschöpfen; ein Ergänzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großflächigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugehörigen blitzschutz-technischen Maßnahmen können drei Hauptbereichen zugeordnet werden: - Äußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgeführten Anlage mit Fotos beispielhaft dokumentiert.