Refine
Year of publication
- 2017 (107) (remove)
Institute
- Fachbereich Wirtschaftswissenschaften (30)
- Fachbereich Maschinenbau und Mechatronik (14)
- Fachbereich Energietechnik (13)
- Fachbereich Elektrotechnik und Informationstechnik (12)
- Fachbereich Architektur (11)
- Fachbereich Luft- und Raumfahrttechnik (11)
- Fachbereich Bauingenieurwesen (7)
- Fachbereich Medizintechnik und Technomathematik (6)
- ZHQ - Bereich Hochschuldidaktik und Evaluation (5)
- ECSM European Center for Sustainable Mobility (3)
Language
- German (107) (remove)
Document Type
- Article (37)
- Part of a Book (22)
- Conference Proceeding (20)
- Book (13)
- Other (9)
- Part of a Periodical (2)
- Report (2)
- Contribution to a Periodical (1)
- Doctoral Thesis (1)
Keywords
- Ausfachungsmauerwerk (1)
- Autonomous mobile robots (1)
- Bein (1)
- Bewertungsframework (1)
- Competence Developing Gam (1)
- Cyber-physical systems (1)
- Digitale Transformation (1)
- Education (1)
- Elektromyographie (1)
- Elektrostimulation (1)
Is part of the Bibliography
- no (107)
In the future, we expect manufacturing companies to follow a new paradigm that mandates more automation and autonomy in production processes. Such smart factories will offer a variety of production technologies as services that can be combined ad hoc to produce a large number of different product types and variants cost-effectively even in small lot sizes. This is enabled by cyber-physical systems that feature flexible automated planning methods for production scheduling, execution control, and in-factory logistics.
During development, testbeds are required to determine the applicability of integrated systems in such scenarios. Furthermore, benchmarks are needed to quantify and compare system performance in these industry-inspired scenarios at a comprehensible and manageable size which is, at the same time, complex enough to yield meaningful results.
In this chapter, based on our experience in the RoboCup Logistics League (RCLL) as a specific example, we derive a generic blueprint for how a holistic benchmark can be developed, which combines a specific scenario with a set of key performance indicators as metrics to evaluate the overall integrated system and its components.
Die Steiff Spielwarenfabrik in Giengen / Brenz : Ein unbekanntes Meisterwerk der frühen Moderne
(2017)
Doppelte Abfindung für Arbeitnehmer: Abfindung gemäß § 1 a KSchG und Abfindung gemäß Sozialplan
(2017)